August 2004 Monthly Operating Report for Susquehanna, Units 1 and 2
ML042720352
Person / Time
Site: Susquehanna  
(NPF-014, NPF-022)
Issue date: 09/13/2004
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005817
Download: ML042720352 (7)


Text

a TH I,,

1a 'P.

PIN - -

  • 'p.

iJ I::: TM Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @pplweb.com September 13, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-3881NPF-22 PLA-0058 17 The August 2004 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. A. Blamey NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 09/13/2004 J. J. Hennings (570) 542-3747 1.

2.

3.

4.

OPERATING STATUS Unit Name:

Susquehanna Steam Electric Station (UI)

Reporting Period:

August 2004 Design Electrical Rating (Net MWe):

1177*

Maximum Dependable Capacity (Net MWe):

1135*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

826,852 Yr.-to-Date 5,855 4,574.2 4,524.4 0

4,872,357 Cumulative 186,144 155,059.0 152,764.0 0

157,485,795 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of I

UNIT SHUTDOWNS DOCKET NO.i; UNIT DATE COMPLETED BY TELEPHONE 50-387 One 09/13/2004 J. J. Hennings (570) 542-3747 REPORT MONTH August 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month Summary: There was a power reduction greater than 20% on 8/22/04. Reactor power was manually reduced to 70%, over a 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> time period, to facilitate troubleshooting and maintenance of the "B" Reactor Feed Pump Turbine (RFPT) control system. The need for the power reduction was identified less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> before the power reduction was initiated.

Following corrective maintenance on the RFPT control valve linkage, 100% power was achieved on 8/25/04.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling

. D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

"I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

09113/04 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 09/13/04 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susquehanna Steam Electric Station (U2)

6.

Reporting Period:

August 2004

7.

Design Electrical Rating (Net MWe):

1182

8. Maximum Dependable Capacity (Net MWe):

1140 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

843,449 Yr.-to-Date 5,855 5,855 5,855 0

6,710,800 Cumulative 171,384 149,750.8 147,763.6 0

155,468,811 NOTES:

Page 1 of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 09/13/04 J. J. Hennings (570) 542-3747 REPORT MONTH August 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No shutdowns this month.

Summary: There were no power reductions greater than 20% this month.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves 1..

Date:

09/13/2004 Telephone:

(570) 542-3747 None.