March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2
ML051180133
Person / Time
Site: Susquehanna  
(NPF-014, NPF-022)
Issue date: 04/13/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005886
Download: ML051180133 (7)


Text

I i

I I I I F~~

P 'k 'CM

ham, Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone @pplweb.com April 13, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM. ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005886 The March 2005 Monthly Operating Reports fob Susquehanna SES Units I and 2 aret atgached.

\\'ety truly yours, Rvobe fA.Saccoine JHH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman

"-` 2,, -

C---

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/13/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (Ul)

2.

Reporting Period:

March 2005

3.

Design Electrical Rating (Net MWe):

1177

4.

Maximum Dependable Capacity (Net MWe):

1135

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

868,299 Yr.-to-Date 2160.0 2160.0 2160.0 0

2,506,200

=

Cumulative 191,233.0 160,148.0 157,760.0 0

163,146,642 NOTES:

Page I of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/13/2005 J. J. Hennings (570) 542-3747 REPORT MONTH March 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary: There were no power reductions greater than 20% this month.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

04/13/05 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/13/05 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susguehanna Steam Electric Station (U2)

6.

Reporting Period:

March 2005

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 744 223.47 187.07 0

179,604 Yr.-to-Date 2160 1,572.0 1531.1 0

1,655,042

=

Cumulative

  • 176,473 154,251.7 152,223.7 0

=

160,470,182 Page I of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/13/05 J. J. Hennings (570) 542-3747 REPORT MONTH March 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

1 2/26/05 S

556.93 C

4 Scheduled shut down for Refueling Outage. This is a continuation from February. Outage ended 3/24/05.

(628.90 Total)

Summary: Refueling outage ended 3/24/05 and ramp up to 100% power was completed on 3/28/05. There were no power reductions greater than 20% this month.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

04/13/05 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.