PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2
| ML051180133 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna (NPF-014, NPF-022) |
| Issue date: | 04/13/2005 |
| From: | Saccone R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005886 | |
| Download: ML051180133 (7) | |
Text
I i
I I I I F~~
P 'k 'CM
- ham, Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone @pplweb.com April 13, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM. ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005886 The March 2005 Monthly Operating Reports fob Susquehanna SES Units I and 2 aret atgached.
\\'ety truly yours, Rvobe fA.Saccoine JHH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman
"-` 2,, -
C---
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/13/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (Ul)
- 2.
Reporting Period:
March 2005
- 3.
Design Electrical Rating (Net MWe):
1177
- 4.
Maximum Dependable Capacity (Net MWe):
1135
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
868,299 Yr.-to-Date 2160.0 2160.0 2160.0 0
2,506,200
=
Cumulative 191,233.0 160,148.0 157,760.0 0
163,146,642 NOTES:
Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/13/2005 J. J. Hennings (570) 542-3747 REPORT MONTH March 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary: There were no power reductions greater than 20% this month.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.
Date:
04/13/05 Telephone:
(570) 542-3747
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/13/05 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susguehanna Steam Electric Station (U2)
- 6.
Reporting Period:
March 2005
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 744 223.47 187.07 0
179,604 Yr.-to-Date 2160 1,572.0 1531.1 0
1,655,042
=
Cumulative
- 176,473 154,251.7 152,223.7 0
=
160,470,182 Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/13/05 J. J. Hennings (570) 542-3747 REPORT MONTH March 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
1 2/26/05 S
556.93 C
4 Scheduled shut down for Refueling Outage. This is a continuation from February. Outage ended 3/24/05.
(628.90 Total)
Summary: Refueling outage ended 3/24/05 and ramp up to 100% power was completed on 3/28/05. There were no power reductions greater than 20% this month.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
04/13/05 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.