ML042710274

From kanterella
Jump to navigation Jump to search
Submittal of Registration Information for the Storage of Spent Fuel
ML042710274
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/21/2004
From: Nunn D
Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR
Download: ML042710274 (2)


Text

SOUTHERN CALIFORNIA Dwight E. Nunn HEDISON Vice President An EDISON MTTERNVATIONALIY Company September 21, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk, Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001

Subject:

Docket Nos.60-206, 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 1, 2 and 3 Gentlemen:

In accordance with the registration requirements given in 10 CFR § 72.212(b)(1)(ii),

Southern California Edison (SCE) hereby submits the following registration information for the storage of spent fuel from Unit 1 at the Independent Spent Fuel Storage Installation (ISFSI) of the San Onofre Nuclear Generating Station (SONGS).

Licensees' Names: Southern California Edison Company San Diego Gas & Electric Company City of Anaheim, California City of Riverside, California Licensee's Address: 5000 Pacific Coast Highway San Clemente, CA 92672 Reactor License Number: DPR-13 (SONGS-1)

NPF-10 (SONGS-2)

NPF-15 (SONGS-3)

Docket Numbers: 50-206 (SONGS-1) 50-361 (SONGS-2) 50-362 (SONGS-3) 72-41 (SONGS ISFSI)

Cask Certificate Number: CoC 1029, Amendment 0, February 5, 2003 Cask Model Number: Standardized Advanced NUHOMSO System Cask Identification Nos: Canister Number: S12208MVDSCO17 Module Number: S1232208AHSM014 P.O. Box 128 San Clemente, CA 92674-0128 c D(

949-368-1480 Fax 949-368-1490

Document Control Desk September 21, 2004 For additional information concerning the storage of spent fuel under this general license, please contact Mr. D. F. Pilmer, Licensing Manager, at 949-368-1486.

Sincerely, f

cc: B. S. Mallett, NRC Regional Administrator, Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 W. C. Huffman, NRC Project Manager, San Onofre Unit I S. C. O'Connor, NRC Project Manager, San Onofre ISFSI C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3