ML042660091
| ML042660091 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/14/2004 |
| From: | Mallen F South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-04001782 | |
| Download: ML042660091 (14) | |
Text
Nuclear Operating Company September 14, 2004 NOC-AE-04001782 File No.: G02 10CFR50.71 STI: 31786863 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for August 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for August 2004.
If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.
F.H. Mallen General Manager, Financial Support Attachments: 1)
STPEGS Unit I Monthly Operating Report - August 2004
- 2)
STPEGS Unit 2 Monthly Operating Report - August 2004
NOC-AE-04001782 Page 2 cc:
(paper copy)
(electronic copy)
Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MNl 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT AUGUST 2004 ST? NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 G.L.
Date Approved By:
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT OPERA 1.
2.
DOCKET NO.
50498 UNIT I
DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 LTING STATUS REPORTING PERIOD: 8/1/04 - 8/31/04 GROSS HOURS IN REPORTING PERIOD:
744 CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6 POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None REASONS FOR RESTRICTION (IF ANY): N/A 3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
NET ELECTRICAL ENERGY GENERATED (MWH)
REACTOR SERVICE FACTOR (%)
REACTOR AVAILABILITY FACTOR (%)
UNIT SERVICE FACTOR (as)
UNIT AVAILABILITY FACTOR (%)
UNIT CAPACITY FACTOR - Using MDC (%)
UNIT CAPACITY FACTOR - Using DER (%)
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 744.0 0
744.0 2
2,879.456 946.403 100.0 100.0 100.0 100.0 101.7 101.7 0.0 YR TO DATE 5.799.9 5S783.8 22,342.678 7.386.506 22 992 9921 988 98.8 100.9 100.9 1.2 CUMULATIVE 109.815.4 0
108.111.3 2
405.310,134 132 461,343 78.2 78.2 77.0 77.0 75.4 75.4 14.1 18.
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-498 UNIT I DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 1266 1266 1265 1266 1265 1263 1266 1269 1268 1268 1268 1269 1274 1276 1279 1277 17 18 19 20 21 22 23 24 25 26 27 28 AVERAGE DAILY POWER LEVEL (MWe-Net) 1276 1275 1274 1276 1275 1275 1275 1275 1275 1274 1275 1274 1276 1276 1275 29 30 31
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-498 UNIT I
DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH AUGUST I
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage S-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
0
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT AUGUST 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 J-
&Aad&eX G.Lf PARKEY C
Date Approved By:
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
50-499 UNIT 2 DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 8/1/04 - 8/31/04 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (%)
- 15.
UNIT CAPACITY FACTOR -Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (%)
- 17.
UNIT FORCED OUTAGE RATE (%)
744.0 0
744.0 0
2,879.456 942.843 100.0 100.0 100.0 100.0 101.3 101.3 0.0 0
5d.209.9 0
5.1292.59 89.0 89.0 88.7 88.7 89.6 89.6 0.8 106.914.4 0
104.598.0 391.662.802 127.660.600 80.2 80.2 78.5 78.5 76.6 76.6 13.3 18.
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWVER LEVEL DOCKETNO.
50-499 UNIT 2
DATE Seot. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1262 2
1262 3
1261 4
1260 5
1258 6
1260 7
1261 8
1264 9
1264 10 1265 11 1263 12 1265 13 1269 14 1270 15 1271 16 1272 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1273 18 1272 19 1271 20 1271 21 1270 22 1269 23 1270 24 1270 25 1270 26 1269 27 1269 28 1269 29 1272 30 1271 31 1269
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-499 UNIT 2
DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH AUGUST 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD II I
I I
I I
I II I
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.