NOC-AE-04001782, August 2004 Monthly Operating Report for South Texas Project Units 1 and 2
| ML042660091 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/14/2004 |
| From: | Mallen F South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-04001782 | |
| Download: ML042660091 (14) | |
Text
Nuclear Operating Company September 14, 2004 NOC-AE-04001782 File No.: G02 10CFR50.71 STI: 31786863 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for August 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for August 2004.
If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.
F.H. Mallen General Manager, Financial Support Attachments: 1) STPEGS Unit I Monthly Operating Report - August 2004
- 2) STPEGS Unit 2 Monthly Operating Report - August 2004
NOC-AE-04001782 Page 2 cc:
(paper copy) (electronic copy)
Bruce S. Mallett A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 L. D. Blaylock Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission David H. Jaffe Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff C. A. Johnson Bureau of Radiation Control AEP Texas Central Company Texas Department of Health 1100 West 49th Street Jon C. Wood Austin, TX 78756-3189 Matthews & Branscomb Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MNl 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT AUGUST 2004 ST? NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By:
G.L. Date
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKET NO. 50498 UNIT I DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERALTING STATUS
- 1. REPORTING PERIOD: 8/1/04 - 8/31/04 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR CRITICAL 744.0 5.799.9 109.815.4
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0
- 7. HOURS GENERATOR ON LINE 744.0 5S783.8 108.111.3
- 8. UNIT RESERVE SHUTDOWN HOURS 2 2 22
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,879.456 22,342.678 405.310,134
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 946.403 7.386.506 132 461,343
- 11. REACTOR SERVICE FACTOR (%) 100.0 992 78.2 9921
- 12. REACTOR AVAILABILITY FACTOR (%) 100.0 78.2
- 13. UNIT SERVICE FACTOR (as) 100.0 988 77.0
- 14. UNIT AVAILABILITY FACTOR (%) 100.0 98.8 77.0
- 15. UNIT CAPACITY FACTOR - Using MDC (%) 101.7 100.9 75.4
- 16. UNIT CAPACITY FACTOR - Using DER (%) 101.7 100.9 75.4
- 17. UNIT FORCED OUTAGE RATE (%) 0.0 1.2 14.1
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT I DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1266 17 1276 2 1266 18 1275 3 1265 19 1274 4 1266 20 1276 5 1265 21 1275 6 1263 22 1275 7 1266 23 1275 8 1269 24 1275 9 1268 25 1275 10 1268 26 1274 11 1268 27 1275 12 1269 28 1274 13 1274 29 1276 14 1276 30 1276 15 1279 31 1275 16 1277
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT I DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH AUGUST I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative S-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
0
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT AUGUST 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By: J-G.Lf PARKEY
&Aad&eX C Date
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS
- 1. REPORTING PERIOD: 8/1/04 - 8/31/04 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR CRITICAL 744.0 106.914.4
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 5d.209.90 0
- 7. HOURS GENERATOR ON LINE 744.0 104.598.0
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 5.1292.59
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,879.456 391.662.802
- 10. NET ELECTRICAL ENERGY GENERATED (MWH) 942.843 127.660.600
- 11. REACTOR SERVICE FACTOR (%) 100.0 89.0 80.2
- 12. REACTOR AVAILABILITY FACTOR (%) 100.0 89.0 80.2
- 13. UNIT SERVICE FACTOR (%) 100.0 88.7 78.5
- 14. UNIT AVAILABILITY FACTOR (%) 100.0 88.7 78.5
- 15. UNIT CAPACITY FACTOR - Using MDC (%) 101.3 89.6 76.6
- 16. UNIT CAPACITY FACTOR - Using DER (%) 101.3 89.6 76.6
- 17. UNIT FORCED OUTAGE RATE (%) 0.0 0.8 13.3
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWVER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Seot. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1262 17 1273 2 1262 18 1272 3 1261 19 1271 4 1260 20 1271 5 1258 21 1270 6 1260 22 1269 7 1261 23 1270 8 1264 24 1270 9 1264 25 1270 10 1265 26 1269 11 1263 27 1269 12 1265 28 1269 13 1269 29 1272 14 1270 30 1271 15 1271 31 1269 16 1272
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Sept. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH AUGUST 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD II I I I I I I II I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.