August 2004 Monthly Operating Report for Oyster Creek Generating Station
ML042660079
Person / Time
Site: Oyster Creek
Issue date: 09/14/2004
From: Swenson C
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-04-20209, GL-97-002
Download: ML042660079 (2)


Text

I lAmerGensM AmerGen Energy Company, LLC Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 www.exeloncorp.com An Exelon Company GL 97-02 September 14, 2004 2130-04-20209 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

Subject:

Monthly Operating Report - August 2004 Enclosed is the August 2004 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02 If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.

SincerelA C. N. Swenson Vice President, Oyster Creek Generating Station CNS/DIF Enclosure cc:

S. J. Collins, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 04002

2s

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-219 Oyster Creek 1 September 08, 2004 Roger Gayley (609) 971-4406 August 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 650.00 619.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 447,543.00 Yr-to-Date 5,730.42 5,704.26 0.00 3,499,377.00 Cumulative 224,167.44 219,899.91 918.20 125,894,130.0 UNIT SHUTDOWNS

SUMMARY

During August, Oyster Creek generated 447,543 net MWh electric, which was 97.2% of its MDC rating.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1