Upcoming Quad Cities Problem Identification and Resolution Inspection
ML042600446
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/16/2004
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML042600446 (6)


Text

September 16, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

UPCOMING QUAD CITIES PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION

Dear Mr. Crane:

On October 18, 2004, NRC will begin the required biennial problem identification and resolution (PI&R) inspection at your Quad Cities Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline inspection procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for the inspection.

The documents are lists of information, necessary in order to ensure the inspection team is adequately prepared for the inspection. The documents should be available for on-site review by the inspection team on October 12 thru 14, 2004. The inspection team will use the lists to select additional documents for detailed review. The additional documents should be available to the team when they return to the site on October 18 to began the inspection.

The lead inspector for this inspection is Geoffrey C. Wright. If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Geoff at 630-829-9602, or to contact him by e-mail at gcw@nrc.gov.

C. Crane In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

Enclosure:

Request for Information Regarding PI&R Inspection cc w/encl:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company

DOCUMENT NAME: G:\\quad\\ML042600446.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII N RIII E

NAME GWright MRing DATE 09/16/04 09/16/04 OFFICIAL RECORD COPY

C. Crane ADAMS Distribution:

AJM DFT LWR RidsNrrDipmIipb GEG HBC KKB DRPIII DRSIII PLB1 JRK1

Enclosure Requested Information to Support Problem Identification and Resolution (PI&R) Inspection 1.

A copy of administrative procedure(s) for the Corrective Action Process, Trending Program, Quality Assurance Audit Program, Self-assessment Program, Corrective Action Effectiveness Review Program, and Industry Experience Review Program.

2.

A copy of quality assurance audits and/or self-assessments of the corrective action program completed since December 2002 3.

Have available for review and use a copy of the Quality Assurance manual.

4.

Have available for review and use a copy of the Employee Concerns Program/Ombudsman administrative procedure.

5.

A list of quality assurance audits completed since December 2002 with brief description of areas where findings were identified.

6.

A list of self-assessments completed since December 2002.

7.

A list of root cause evaluations completed since December 2002.

8.

A list of test failures (IST or Technical Specification surveillances) since December 2002, with a brief description of component/system which failed.

9.

A list of all open significant condition reports (Levels 1 and 2) sorted by significance level. Include a description of the issue and the significance category.

10.

A list of significant condition reports (Level 1 and 2) closed since December 2002 including a description, significance category, date initiated, date closed, and whether there is an associated operability evaluation.

11.

A list of condition reports initiated since December 2002 that involve inadequate or ineffective corrective actions. Include a brief description, status, and significance category of the issue.

12.

A list of condition reports initiated since December 2002 that identify trends of conditions adverse to quality. Include a brief description, status, and significance category for each item.

13.

A copy of any performance indicator reports used to track the corrective action program effectiveness.

14.

A list of condition reports issued during the past three refueling outages sorted by system and component. Include a brief description, status, and significance category for each item.

Enclosure 2

15.

A list of the top ten risk significant systems 16.

A list of the top ten risk significant components 17.

A list of all human performance errors since December 2002 18 List of condition reports issued since December 2002 where the NRC was the identifying organization.

19.

A list of operability determinations issued since December 2002.

20.