September 14, 2004 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION, MILLSTONE POWER STATION, UNIT NO. 2, REGARDING BULLETIN 2003-01, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NO. MB9588)
Dear Mr. Christian:
By letter dated August 8, 2003, Dominion Nuclear Connecticut, Inc. (DNC) provided the 60-day response to Bulletin 2003-01 for the Millstone Power Station, Unit No. 2 (MP2). The Bulletin requested MP2 to either (1) state that the emergency core cooling system (ECCS) and containment spray system (CSS) recirculation functions have been analyzed with respect to the potentially adverse post-accident debris blockage effects identified in the Bulletin and are in compliance with all existing applicable regulatory requirements, or (2) describe any interim compensatory measures that have been implemented or that will be implemented to reduce the interim risk associated with potentially degraded or nonconforming ECCS and CSS recirculation functions until an evaluation to determine compliance is complete.
The Nuclear Regulatory Commission (NRC) staff has completed a preliminary review of your response and has determined that additional information is needed (see enclosure) to complete our review. To support our closeout goal, the NRC is requesting that DNC respond within 60 days from the date of this letter. If you have any questions, please contact me at (301) 415-1484.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336
Enclosure:
As stated cc w/encl: See next page
ML042540332 OFFICE PDI-2/PM PDI-2/ASC NAME VNerses DCollins DATE 9/14/04 9/14/04
Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
Millstone Power Station, Unit No. 3 cc:
Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
REQUEST FOR ADDITIONAL INFORMATION RELATED TO DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT NO. 2 DOCKET NO. 50-336 1.
On page 2 of Attachment 3 of your Bulletin 2003-01 response, you listed refueling water storage tank refill and four bulletized "WOG [Westinghouse Owners Group] strategies" as being considered as procedural changes. However, your response does not completely discuss the operator training to be implemented. Please provide a detailed discussion of the operating procedures to be implemented, the indications of sump clogging that the operators are instructed to monitor, and the response actions the operators are instructed to take in the event of sump clogging and loss of emergency core cooling system recirculation capability.
- 2.
On page 3 of Attachment 3 of your Bulletin 2003-01 response you state that certain procedural changes/strategies would be in conflict with Combustion Engineering Owners Group emergency procedural guideline. The WOG has developed operational guidance in response to Bulletin 2003-01 for Westinghouse and Combustion Engineering type pressurized-water reactors. Please provide a discussion of your plans to consider implementing this new WOG guidance. Include a discussion of the WOG-recommended compensatory measures that have been or will be implemented at your plant, and the evaluations or analyses performed to determine which of the WOG-recommended changes are acceptable at your plant. Provide technical justification for those WOG-recommended compensatory measures not being implemented by your plant. Also include a detailed discussion of the procedures being modified, the operator training being implemented, and your schedule for implementing these compensatory measures.
- 3.
NRC Bulletin 2003-01 provides possible interim compensatory measures licensees could consider to reduce risks associated with sump clogging. In addition to those compensatory measures listed in Bulletin 2003-01, licensees may also consider implementing unique or plant-specific compensatory measures, as applicable. Please discuss any possible unique or plant-specific compensatory measures you considered for implementation at your plant. Include a basis for rejecting any of these additional considered measures.