MONTHYEARML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
September 10, 2004 Mr. Michael P. Gallagher Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
TRANSMITTAL OF REVISION 1 SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOK AND INFORMATION REQUEST FOR NEXT REVISION
Dear Mr. Gallagher:
On September 30, 2003, the NRC completed a two-year benchmarking activity for 71 Significance Determination Process (SDP) risk-informed inspection notebooks. All 71 notebooks were issued as revision 1, incorporating information obtained during the initial benchmarking visits. The NRC appreciates the support of each licensee in this resource intensive, first-of-a-kind effort which has greatly improved the quality of each SDP notebook to reflect the plant design-features, operational procedures and, in many cases, reduced unnecessary conservatism.
Over the course of this two year effort, insights were gained and it became apparent that these lessons learned would need to be captured in all of the notebooks, with additional effort needed for updating the notebooks that were benchmarked early in the process. It was also recognized that periodic maintenance would be required to achieve a reasonable level of accuracy as a screening tool, given changes in plant design, procedures, and revisions to the plant-specific probabilistic risk assessment (PRA) models since the original benchmarking visit.
In April of 2004, the NRC and its contractor Brookhaven National Laboratory (BNL) embarked on an SDP notebook enhancement/standardization effort for all 71 notebooks through a revision 2 process. Each revision 2 SDP notebook will capture generic lessons learned from the previous revision and incorporate information specific to gaps in the corresponding revision 1 notebook. The notebooks will also contain a target set of equipment that is pre-solved in a manner similar to what was performed during the revision 1 benchmarking effort. The NRC estimates completion of the revision 2 SDP notebooks by June 30, 2005.
In order to achieve this milestone with minimal burden, the NRC requests that the plant-specific information for Limerick and Oyster Creek specified on the enclosed CD be sent to the address provided below. Requests for plant-specific information for Peach Bottom and TMI -1 will be provided separately. The CD also contains the revision 1 SDP notebooks generated from the initial benchmarking visit. The NRC requests that your response to the plant-specific information be provided on a CD within 30 days of receipt of this request. In addition to the plant-specific requests, the NRC welcomes your comments on the revision 1 SDP notebooks.
M. Gallagher 2 Mailing address for response:
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.
If you have any questions regarding the request, please contact Robert Perch at 301-415-1422.
Sincerely,
/RA/
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
Enclosure:
As stated
M. Gallagher 2 Mailing address for response:
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch MS: O10-H4 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The NRC staff is continuing to review the appropriate classification of the enclosed CD documents within the records management program considering changes in our practices following the events of September 11, 2001. Pending a final determination, the information request and the notebooks have been marked as Proprietary Information in accordance with Section 2.390(d) of Title 10 of the Code of Federal Regulations (10 CFR 2.390). Please control the document accordingly (i.e., treat the document as trade secrets and commercial or financial information that you considered privileged or confidential). We will inform you if the designation of the documents change as a result of our ongoing assessments.
If you have any questions regarding the request, please contact Robert Perch at 301-415-1422.
Sincerely,
/RA/
Michael Tschiltz, Chief Probabilistic Safety Assessment Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION PUBLIC (w/o enclosure) perch\mike gallagher - oyster creek limerick.wpd Adams Accession No. ML042540182 OFFICE SPSB-B SPSB-B SPSB-B/SC SPSB/BC NAME TValentine RPerch MCaruso MTschiltz DATE 9/ 2 /04 9/ 2 /04 9/ 3 /04 9/ 10 /04 OFFICIAL RECORD COPY