Dominion Nuclear Connecticut, Inc.
hlill\\tone Power 5tatioti Ilopc Ftrrv Road WJ I erlo rd. (3 06 18 5 September 2, 2004 Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Re: 10 CFR 2.202 10 CFR 50.4 Serial No.:
04-53 1 NL&OS/MAE:
R2 License No.:
DPR-21 Docket No.:
50-245 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 1 RESPONSE AND ANSWER TO ORDER FOR IMPLEMENTATION OF ADDITIONAL SECURITY MEASURES ASSOCIATED WITH ACCESS AUTHORIZATION, FITNESS FOR DUTY AND BEHAVIOR OBSERVATION DATED AUGUST 19,2004 On August 19, 2004, the Nuclear Regulatory Commission (NRC) issued an Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness For Duty, and Behavior Observation for Millstone Power Station Unit 1 (EA
- 99) (the Order). The Order stated that following the events of September 11, 2001, the NRC took a number of actions, including commencement of a comprehensive review of its safeguards and security programs and requirements.
The Commission has determined that certain additional security measures are required to address the current threat environment. The Order required that Dominion Nuclear Connecticut, Inc. (DNC) immediately start implementation of the requirements of the Order, provide a schedule for achieving compliance with the requirements in Attachment 1 of the Order within twenty (20) days of the date of the Order, and complete implementation of requirements identified in the Order as described in Section 1II.A of the Order.
In accordance with Section IV of the Order and 10 CFR 2.202, DNC hereby submits its Answer to the Order. DNC consents to the Order and does not request a hearing.
Section A.3 of Attachment 1 to the Order allows, as an alternate means of complying with the Order, the implementation of the compensatory measures for operating power reactors which were implemented by January 7, 2004. In a letter dated January 20, 2004 (Serial No. 04-OOI), DNC notified the NRC of the completion of Order A-02-261 for Millstone Power Station.
Serial No.04-531 MPS U1 ACC Order Resp.
Page 2 of 4 Millstone Unit 1 is located within the protected area of the Millstone Power Station.
Therefore, since Millstone Power Station is in compliance with Order EA-02-261, Millstone Unit 1 has achieved full compliance with Order EA-03-099 and accordingly, no schedule for achieving compliance is provided.
If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.
Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Commitments made by this letter: None
Serial No.04-531 MPS U1 Acc Order Resp.
Page 3 of 4 COMMONWEALTH OF VIRGINIA
)
)
COUNTY OF HENRICO 1
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
hd,2004.
rtd Acknowledged before me t h i s 2 = day of My Commission Expires 3).
Ado/,.
Notary Public (SEAL)
Serial No.04-531 MPS U1 Acc Order Resp.
Page 4 of 4 cc:
Director of Nuclear Security Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Secretary, Office of the Secretary of the Commission U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1 41 5 Mr. A. B. Wang NRC Project Manager U. S. Nuclear Regulatory Commission 1 1555 Rockville Pike Mail Stop 7 E 1 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station