ML042460366
| ML042460366 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/26/2004 |
| From: | Swenson C AmerGen Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2130-04-20202 | |
| Download: ML042460366 (2) | |
Text
AmerGen SM AmerGen Energy Company, LLC www.exeloncorp.com An Exelon Company Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 10 CFR 50.73 August 26, 2004 2130-04-20202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219
Subject:
Correction to Two of the Committed Action Dates on Attachment 1 to Licensee Event Report 2004-001-00
Reference:
Licensee Event Report 2004-001-00: # 1 EDG Inoperable Caused by Cooling Fan Bearing Bolts Not Torqued Properly Following Preventative Maintenance Activities, July 13, 2004, Oyster Creek Generating Station to this cover letter is revised to correct an administrative error in recording the committed dates for the third and fourth listed actions previously submitted in the referenced Licensee Event Report. There are no other changes to the submitted LER itself nor to the commitments as previously stated.
We apologize if this error caused you any inconvenience. If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.
C. N. Swenson Vice President, Oyster Creek Generating Station CNS/DIF : List of Regulatory Commitments cc:
S. J. Collins, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 04104
f.
ATTACHMENT 1 (Rev. 1)
SUMMARY
OF AMERGEN ENERGY CO. LLC COMMITMENTS The following table identifies commitments made in the document by AmerGen Energy Co. LLC (AmerGen). Any other actions discussed in this submittal represent intended or planned actions by AmerGen. They are described to the NRC for the NRC's information and are not regulatory commitments.
COMMITMENT COMMITTED DATE OR "OUTAGE" Evaluate and create PM tasks for the 24-month diesel inspection, including the specific tasks identified in the 'Component Replacement Schedule" (Appendix 1, page E2-1) of Surveillance Test (ST) 636.1.010.
01/31/2005 Revise the ST and the applicable vendor Maintenance Instructions into Level 1 (Continuous Use) Maintenance Procedures. These procedures 03/
should provide the necessary details, verifications and human factoring.
3/31/2005 In addition, data sheets for entering readings such as "as left" torque values; clearances, M&TE and other pertinent information should be provided.
Planners will be trained and reinforced in the expectation to provide
- 8/31/2004 torque specifications and appropriate verifications in work packages.
A follow up work package quality assessment will be performed prior to
- 10/31/2004 the upcoming refuel outage (1 R20).
NOTE:
- Corrected dates that were inadvertently reversed on the original submittal.