Mid-cycle Performance Review and Inspection Plan - Palisades Nuclear Plant
ML042450544
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/30/2004
From: Reynolds S
Division Reactor Projects III
To: Domonique Malone
Nuclear Management Co
References
Download: ML042450544 (7)


Text

August 30, 2004 Mr. Daniel J. Malone Site Vice President Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN PALISADES NUCLEAR PLANT (REPORT 05000255/05-01)

Dear Mr. Malone:

On August 11, 2004, the NRC staff completed its mid-cycle plant performance assessment of the Palisades Nuclear Plant. The mid-cycle review for the Palisades Nuclear Plant involved the participation of all technical divisions in evaluating performance for the first half of the 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). A White inspection finding in the Initiating Events cornerstone was open for four quarters and was closed during the most recent quarter based upon a satisfactory Inspection Procedure 95001 Supplemental Inspection. As a result, Palisades Nuclear Plant performance transitioned from the Regulatory Response Column to the Licensee Response Column of the NRCs Action Matrix. Therefore, we plan to conduct only Reactor Oversight Process (ROP) baseline inspections at your facility through March 31, 2006.

The enclosed inspection plan details the inspections scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspection plan for the last 12 months is tentative and may be revised at the end-of-cycle review meeting.

D. Malone In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven A. Reynolds, Acting Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20

Enclosure:

Palisades Inspection/Activity Plan See Attached Distribution

D. Malone In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven A. Reynolds, Acting Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20

Enclosure:

Palisades Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\Branch TSS\midcycle 2004\Midcycle Ltrs\Pal.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME EDuncan:co SReynolds DATE 08/20/04 08/20/04 OFFICIAL RECORD COPY

D. Malone cc w/encl: J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Michigan Department of Attorney General

D. Malone ADAMS Distribution:

WDR DFT JFS2 DWW Project Director, NRR RidsNrrDipmlipb JLC GEG HBC RML2 SRI Palisades DRPIII DRSIII PLB1 JRK1

Page 1 of 2 Palisades 08/27/2004 11:20:58 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISI/TI - INSERVICE INSPECTION & TI-150 2 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02) 09/20/2004 10/08/2004 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 09/20/2004 10/08/2004 Baseline Inspections IP 71121 - RP OUTAGE ALARA & ACCESS CONTROL INSP 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/27/2004 10/01/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 09/27/2004 10/01/2004 Baseline Inspections MOD/5059 - MODIFICATIONS & 50.59 INSPECTION 3 1 IP 7111117B Permanent Plant Modifications 12/13/2004 12/17/2004 Baseline Inspections IP 71121 - RP POST-OUTAGE ALARA & ACCESS CNTRL INSP 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/13/2004 12/17/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/13/2004 12/17/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/13/2004 12/17/2004 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection 01/10/2005 01/28/2005 Baseline Inspections FY 2005 - PALISADES INIT PREP 04/2005 4 1 W90126 OL - INITIAL EXAM - PALISADES - APR/MAY 2005 04/25/2005 04/29/2005 Not Applicable IP 71121 - RP ACCESS CTRL/ALARA INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/25/2005 04/29/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/25/2005 04/29/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/25/2005 04/29/2005 Baseline Inspections FY 2005 - PALISADES INIT EXAM 05/2005 4 1 W90126 OL - INITIAL EXAM - PALISADES - APR/MAY 2005 05/23/2005 06/03/2005 Not Applicable 71114 - BASELINE EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 06/27/2005 07/01/2005 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 06/27/2005 07/01/2005 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/27/2005 07/01/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/27/2005 07/01/2005 Baseline Inspections IP 71121 - RP ACCESS CTRL/ALARA INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/27/2005 07/01/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 06/27/2005 07/01/2005 Baseline Inspections ISFI - OPERATION OF AN ISFSI 1 1 IP 60855 Operation Of An ISFSI 07/01/2005 09/30/2005 Other Routine MAINT - BIENNIAL MAINTENANCE RULE INSPECTION 1 1 IP 7111112B Maintenance Effectiveness 08/29/2005 09/02/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Palisades 08/27/2004 11:20:58 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type IP 71122 - RP REMP/RAM CONTROL INSPECTION 1 1 IP 7112203 Radiological Environmental Monitoring Program 08/29/2005 09/02/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/29/2005 09/02/2005 Baseline Inspections IP 71122 - RP LIQ/GAS EFFLUENT INSPECTION 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 10/31/2005 11/04/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/31/2005 11/04/2005 Baseline Inspections HEATSKB - BIENNIAL HEAT SINK INSPECTION 1 1 IP 7111107B Heat Sink Performance 11/28/2005 12/02/2005 Baseline Inspections SSDPC - SAFETY SYSTEM DESIGN AND PERFORMANCE 5 1 IP 7111121 Safety System Design and Performance Capability 02/27/2006 03/17/2006 Baseline Inspections ISI - PALISADES ISI INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/19/2006 04/13/2006 Baseline Inspections IP 71121 - RP OUTAGE ACCESS CTRL & ALARA INSP 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/27/2006 03/31/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/27/2006 03/31/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.