McGuire Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:18:53 Report 22 2
EB1-F/UP
- OPEN ITEM FOLLOWUP Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 1, 2 4
PB1PIR
- PI&R INSPECTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 11/01/2004 11/05/2004 Identification and Resolution of Problems IP 71152B 1, 2 4
60854
- ISFSI DRY RUNS Other Routine 11/29/2004 12/03/2004 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 1, 2 Other Routine 11/29/2004 12/03/2004 Preoperational Testing Of An ISFSI IP 60854 1, 2 Other Routine 11/29/2004 12/03/2004 Operation Of An ISFSI IP 60855 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 01/17/2005 01/21/2005 MCGUIRE/EXAMS AT POWER FACILITIES V23235 1
3 PS-RP
- RP PUBLIC BASELINE AND ISFSI Other Routine 01/31/2005 02/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 01/31/2005 02/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 01/31/2005 02/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 01/31/2005 02/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 01/31/2005 02/04/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 01/31/2005 02/04/2005 Performance Indicator Verification IP 71151 1, 2 3
OL EXAM
- INITIAL EXAM Not Applicable 02/07/2005 02/18/2005 MCGUIRE/EXAMS AT POWER FACILITIES V23235 1
1 EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 03/14/2005 03/18/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 03/21/2005 03/25/2005 Heat Sink Performance IP 7111107B 2
1 EB2-HS
- HEAT SINK Baseline Inspections 04/25/2005 04/29/2005 Heat Sink Performance IP 7111107B 1, 2 1
EB2-MR
- MAINTENANCE RULE Baseline Inspections 06/06/2005 06/10/2005 Maintenance Effectiveness IP 7111112B 1, 2 5
EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 06/20/2005 06/24/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Permanent Plant Modifications IP 7111117B 1, 2 2
- EMERGENCY EXERCISE Baseline Inspections 08/08/2005 08/12/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/08/2005 08/12/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLSOURE
McGuire Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:18:53 Report 22 2
- EMERGENCY EXERCISE Baseline Inspections 08/08/2005 08/12/2005 Performance Indicator Verification IP 71151 1, 2 1
EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 09/12/2005 09/16/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB2SGISI
- STEAM GENERATOR ISI Baseline Inspections 09/26/2005 09/30/2005 Inservice Inspection Activities - PWR IP 7111108P 1
4 EB1-TFP
- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 02/27/2006 03/03/2006 Fire Protection IP 7111105T 1, 2 4
EB1-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 03/20/2006 03/24/2006 Fire Protection IP 7111105T 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.