Inspection/Activity Plan for 09/01/2004 - 03/31/2006
ML042430646
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/30/2004
From: Mccree V
Division Reactor Projects II
To: Rosalyn Jones
Duke Energy Corp
Shared Package
ML042430644 List:
References
Download: ML042430646 (3)


Text

Oconee Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2004 14:20:59 Report 22 5

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 08/30/2004 09/03/2004 Safety System Design and Performance Capability IP 7111121 1, 2, 3 2

PIR F/U

- PI&R FOLLOWUP Baseline Inspections 09/13/2004 09/17/2004 Identification and Resolution of Problems IP 71152 1, 2, 3 3

PS-RP

- RP PUBLIC BASELINE & ISFSI Other Routine 09/20/2004 09/24/2004 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Radiological Environmental Monitoring Program IP 7112203 1, 2, 3 Baseline Inspections 09/20/2004 09/24/2004 Performance Indicator Verification IP 71151 1, 2, 3 2

EB2

- FOLLOWUP ON 10CFR50.59 CORRECTIVE ACTION Baseline Inspections 10/12/2004 10/16/2004 Identification and Resolution of Problems IP 71152 1, 2, 3 3

EB2-SGRP

- STEAM GENERATOR REPLACEMENT Other Routine 11/15/2004 11/19/2004 Steam Generator Replacement Inspection IP 50001 3

Other Routine 12/06/2004 12/10/2004 Steam Generator Replacement Inspection IP 50001 3

Other Routine 12/13/2004 12/17/2004 Steam Generator Replacement Inspection IP 50001 3

1 EB2-ISI

- INSERVICE INSPECTION-U3 Baseline Inspections 11/22/2004 11/26/2004 Inservice Inspection Activities - PWR IP 7111108P 3

1 EB2-SGRP

- CONTAINMENT WELDING REPAIR Other Routine 12/06/2004 12/10/2004 Steam Generator Replacement Inspection IP 50001 3

1 PS-RP

- RADIATION PROTECTION - SGR Other Routine 12/06/2004 12/10/2004 Steam Generator Replacement Inspection IP 50001 3

1 EB2SGRP

- CONTAINMENT REPAIR Other Routine 12/13/2004 12/17/2004 Steam Generator Replacement Inspection IP 50001 3

1 2515/152

- U-3 2515/152: RPV LOWER HEAD PENETRATION Safety Issues 12/15/2004 12/22/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)

IP 2515/152 3

2 EB2-MR

- MAINTENANCE RULE Baseline Inspections 01/03/2005 01/07/2005 Maintenance Effectiveness IP 7111112B 1, 2, 3 4

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/14/2005 02/18/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2, 3 Baseline Inspections 02/14/2005 02/18/2005 Permanent Plant Modifications IP 7111117B 1, 2, 3 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Licensed Operator Requalification Program IP 7111111B 1, 2, 3 1

EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Oconee Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2004 14:20:59 Report 22 2

EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 04/18/2005 04/22/2005 Inservice Inspection Activities - PWR IP 7111108P 1

4 71152B

- PI&R INSPECTION Baseline Inspections 05/09/2005 05/13/2005 Identification and Resolution of Problems IP 71152B 1, 2, 3 Baseline Inspections 05/23/2005 05/27/2005 Identification and Resolution of Problems IP 71152B 1, 2, 3 5

EB1-TFP

- TFP PRE-INSPECTION VISIT Baseline Inspections 05/16/2005 05/20/2005 Fire Protection IP 7111105T 1, 2, 3 2

OL PREP

- INITIAL EXAM PREP Not Applicable 06/06/2005 06/10/2005 OCONEE/EXAMS AT POWER FACILITIES V23216 1

4 EB1-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/06/2005 06/10/2005 Fire Protection IP 7111105T 1, 2, 3 Baseline Inspections 06/20/2005 06/24/2005 Fire Protection IP 7111105T 1, 2, 3 3

OL EXAM

- INITIAL EXAM Not Applicable 06/20/2005 07/01/2005 OCONEE/EXAMS AT POWER FACILITIES V23216 1

1 60855.1

- ISFSI OPERATIONS INSPECTION Other Routine 07/11/2005 07/15/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 1

EB2-ISI

- INSERVICE INSPECTION-U2 Baseline Inspections 10/31/2005 11/04/2005 Inservice Inspection Activities - PWR IP 7111108P 2

2 PS-RP

- RP OCCUPATIONAL BASELINE WK-1 Other Routine 10/31/2005 11/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 Baseline Inspections 10/31/2005 11/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 10/31/2005 11/04/2005 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 10/31/2005 11/04/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 1, 2 1

EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 11/14/2005 11/18/2005 Inservice Inspection Activities - PWR IP 7111108P 2

2 PS-RP

- RP OCCUPATIONAL BASELINE WK-2 Other Routine 11/14/2005 11/18/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2, 3 Baseline Inspections 11/14/2005 11/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 11/14/2005 11/18/2005 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 11/14/2005 11/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1, 2, 3 1

EB2-HS

- HEAT SINK Baseline Inspections 01/30/2006 02/03/2006 Heat Sink Performance IP 7111107B 1, 2, 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2004 14:20:59 Report 22 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 02/13/2006 02/17/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 5

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 03/06/2006 03/10/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 Baseline Inspections 03/20/2006 03/24/2006 Safety System Design and Performance Capability IP 7111121 1, 2, 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.