ML042430643

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan for Brunswick 09/01/04 - 03/31/06
ML042430643
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/30/2004
From:
NRC/RGN-II
To:
Shared Package
ML042430635 List:
References
Download: ML042430643 (2)


Text

Brunswick Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:07:41 Report 22 4

EB1-TFP

- FIRE PROTECTION-TRIENNIAL PRE-INSP VISIT Baseline Inspections 10/12/2004 10/15/2004 Fire Protection IP 7111105T 1, 2 2

OL EXAM

- INITIAL EXAM PREP Not Applicable 10/18/2004 10/22/2004 BRUNSWICK/EXAM AT POWER FACILITIES V23226 1

3 OL EXAM

- INITIAL EXAM Not Applicable 11/01/2004 11/12/2004 BRUNSWICK/EXAM AT POWER FACILITIES V23226 1

4 EB1-TFP

- FIRE PROTECTION-TRIENNIAL Baseline Inspections 11/01/2004 11/05/2004 Fire Protection IP 7111105T 1, 2 Baseline Inspections 11/15/2004 11/19/2004 Fire Protection IP 7111105T 1, 2 2

OL EP

- EMERGENCY EXERCISE Baseline Inspections 11/15/2004 11/19/2004 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 11/15/2004 11/19/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 11/15/2004 11/19/2004 Performance Indicator Verification IP 71151 1, 2 1

DRPB4 SI

- SUPPLEMENTAL INSPECTION Supplemental Progra 12/06/2004 12/10/2004 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 2

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 12/06/2004 12/10/2004 Licensed Operator Requalification Program IP 7111111B 1, 2 1

EB2-HS

- HEAT SINK Baseline Inspections 12/13/2004 12/17/2004 Heat Sink Performance IP 7111107B 1, 2 2

EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 03/14/2005 03/18/2005 Inservice Inspection Activities - BWR IP 7111108G 1

2 PS-RP

- RP OCCUPATIONAL WK-1 Baseline Inspections 03/14/2005 03/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/14/2005 03/18/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/14/2005 03/18/2005 Performance Indicator Verification IP 71151 1, 2 2

PS-RP

- RP OCCUPATIONAL WK-2 Baseline Inspections 03/28/2005 04/01/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/28/2005 04/01/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/28/2005 04/01/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/28/2005 04/01/2005 Performance Indicator Verification IP 71151 1, 2 1

EB2-MR

- MAINTENANCE RULE Baseline Inspections 05/02/2005 05/06/2005 Maintenance Effectiveness IP 7111112B 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Brunswick Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:07:41 Report 22 5

LICREN

- LICENSE RENEWAL AMP INSPECTION License Renewal Insp 06/06/2005 06/10/2005 License Renewal Inspection IP 71002 1, 2 5

LIC REN

- LICENSE RENEWAL AMP INSPECTION License Renewal Insp 06/20/2005 06/24/2005 License Renewal Inspection IP 71002 1, 2 2

OL PREP

- INITIAL EXAM PREP Not Applicable 08/01/2005 08/05/2005 BRUNSWICK/EXAM AT POWER FACILITIES V23226 1

3 PB4-PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 2

OL EXAM

- INITIAL EXAM Not Applicable 08/15/2005 08/19/2005 BRUNSWICK/EXAM AT POWER FACILITIES V23226 1

3 PB4-PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 10/10/2005 10/14/2005 Safety System Design and Performance Capability IP 7111121 1, 2 5

EB1SSDPC - SSDPC Baseline Inspections 10/31/2005 11/04/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Safety System Design and Performance Capability IP 7111121 1, 2 1

OL EP

- EP INSPECTION Baseline Inspections 11/14/2005 11/18/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1, 2 1

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 03/27/2006 03/31/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 03/27/2006 03/31/2006 Permanent Plant Modifications IP 7111117B 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.