ML042430631

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 09/01/04 Through 03/31/06
ML042430631
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/30/2004
From:
Division Reactor Projects II
To:
Shared Package
ML042430626 List:
References
Download: ML042430631 (2)


Text

Page 1 of 2 Harris 08/30/2004 14:09:10 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP OCCUPATIONAL PRE INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/20/2004 09/22/2004 Baseline Inspections PB4-152 - REACTOR LOWER HEAD PENETRATIONS 1 1 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 10/18/2004 10/22/2004 Safety Issues PS-RP - RP OCCUPATIONAL WK-1 2 1 IP 7112101 Access Control to Radiologically Significant Areas 10/18/2004 10/22/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/18/2004 10/22/2004 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 10/18/2004 10/22/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/18/2004 10/22/2004 Baseline Inspections EB2-ISI - ISI AND PRESSURIZER PENETRATIONS 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/25/2004 10/29/2004 Baseline Inspections PB4-153 - REACTOR CONTAINMENT SUMP BLOCKAGE 2 1 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 10/25/2004 10/29/2004 Safety Issues PS-RP - RP OCCUPATIONAL WK-2 2 1 IP 7112101 Access Control to Radiologically Significant Areas 10/25/2004 10/29/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/25/2004 10/29/2004 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 10/25/2004 10/29/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/25/2004 10/29/2004 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 03/07/2005 03/11/2005 Baseline Inspections OL EP - EMERGENCY EXERCISE 2 1 IP 7111401 Exercise Evaluation 04/11/2005 04/15/2005 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/11/2005 04/15/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/11/2005 04/15/2005 Baseline Inspections EB2-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 05/16/2005 05/20/2005 Baseline Inspections PB4-PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 06/13/2005 06/17/2005 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 06/27/2005 07/01/2005 Baseline Inspections EB1-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 4 1 IP 7111105T Fire Protection 07/25/2005 07/29/2005 Baseline Inspections PS-RP - RP PUBLIC 3 1 IP 7112101 Access Control to Radiologically Significant Areas 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/01/2005 08/05/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Page 2 of 2 Harris 08/30/2004 14:09:10 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP PUBLIC 3 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/01/2005 08/05/2005 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 08/01/2005 08/05/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/01/2005 08/05/2005 Baseline Inspections EB1-TFP - FIRE PROTECTION-TRIENNIAL 4 1 IP 7111105T Fire Protection 08/15/2005 08/19/2005 Baseline Inspections 1 IP 7111105T Fire Protection 08/29/2005 09/02/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23233 HARRIS/RETAKE EXAM AT POWER FACILITIES 01/09/2006 01/13/2006 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23233 HARRIS/RETAKE EXAM AT POWER FACILITIES 01/23/2006 02/03/2006 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.