Harris Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:09:10 Report 22 1
PS-RP
- RP OCCUPATIONAL PRE INSP VISIT Baseline Inspections 09/20/2004 09/22/2004 Access Control to Radiologically Significant Areas IP 7112101 1
1 PB4-152
- REACTOR LOWER HEAD PENETRATIONS Safety Issues 10/18/2004 10/22/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)
2 PS-RP
- RP OCCUPATIONAL WK-1 Baseline Inspections 10/18/2004 10/22/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/18/2004 10/22/2004 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/18/2004 10/22/2004 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 10/18/2004 10/22/2004 Performance Indicator Verification IP 71151 1
1 EB2-ISI
- ISI AND PRESSURIZER PENETRATIONS Baseline Inspections 10/25/2004 10/29/2004 Inservice Inspection Activities - PWR IP 7111108P 1
2 PB4-153
- REACTOR CONTAINMENT SUMP BLOCKAGE Safety Issues 10/25/2004 10/29/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)
2 PS-RP
- RP OCCUPATIONAL WK-2 Baseline Inspections 10/25/2004 10/29/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/25/2004 10/29/2004 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/25/2004 10/29/2004 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 10/25/2004 10/29/2004 Performance Indicator Verification IP 71151 1
- REQUAL INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Licensed Operator Requalification Program IP 7111111B 1
- EMERGENCY EXERCISE Baseline Inspections 04/11/2005 04/15/2005 Exercise Evaluation IP 7111401 1
Baseline Inspections 04/11/2005 04/15/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 04/11/2005 04/15/2005 Performance Indicator Verification IP 71151 1
1 EB2-HS
- HEAT SINK Baseline Inspections 05/16/2005 05/20/2005 Heat Sink Performance IP 7111107B 1
4 PB4-PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 06/13/2005 06/17/2005 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 06/27/2005 07/01/2005 Identification and Resolution of Problems IP 71152B 1
4 EB1-TFP
- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 07/25/2005 07/29/2005 Fire Protection IP 7111105T 1
3 PS-RP
- RP PUBLIC Baseline Inspections 08/01/2005 08/05/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/01/2005 08/05/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
Harris Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:09:10 Report 22 3
PS-RP
- RP PUBLIC Baseline Inspections 08/01/2005 08/05/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 08/01/2005 08/05/2005 Radiological Environmental Monitoring Program IP 7112203 1
Baseline Inspections 08/01/2005 08/05/2005 Performance Indicator Verification IP 71151 1
4 EB1-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/15/2005 08/19/2005 Fire Protection IP 7111105T 1
Baseline Inspections 08/29/2005 09/02/2005 Fire Protection IP 7111105T 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 01/09/2006 01/13/2006 HARRIS/RETAKE EXAM AT POWER FACILITIES V23233 1
3 OL EXAM
- INITIAL EXAM Not Applicable 01/23/2006 02/03/2006 HARRIS/RETAKE EXAM AT POWER FACILITIES V23233 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.