ML042430217
| ML042430217 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/03/2004 |
| From: | Michael Webb NRC/NRR/DLPM/LPD4 |
| To: | Brice W Entergy Nuclear |
| Webb M, NRR/DLPM, 415-1347 | |
| Shared Package | |
| ML042450085 | List: |
| References | |
| Download: ML042430217 (3) | |
Text
Michael Webb - RAI Questions regarding RBS Drywefl Bypass Test Interval Extension - With attachment Page 1 1 From:
Michael Webb To:
WBrice@entergy.com Date:
6/3/04 2:09PM
Subject:
RAI Questions regarding RBS Drywell Bypass Test Interval Extension - With attachment
- Bill, I have attached RAI questions that were forwarded to me by the staff of the Civil and Engineering Mechanics Section of the Mechanical and Civil Engineering Branch of the Division of Engineering regarding River Bend Station License Amendment Request (LAR 2004-02) dated February 16, 2004, (NRC TAC MC2071) which seeks a one-time extension of the Drywell Bypass Test Interval.
After you and your colleagues have had a chance to evaluate them, we can set up a call to discuss them further if you desire to do so.
- Thanks, Mike Webb NRC Project Manager for Rver Bend Station 301-415-1347
/Q/v&7
/a7 Sr/rno,'
DJoctr o
T.
p, ' J
/I Je/b
CAW1ND0WS\\TEMP\\GW)00001.TMP Paqe 1 1 C:\\WNDOS\\TMP\\WIOOO1 TMPPa-1 -
Mail Envelope Properties (40BF6948.95D: 5 : 21368)
Subject:
Creation Date:
From:
Created By:
RAI Questions regarding RBS Drywell Bypass Test Interval Extension -
With attachment 6/3/04 2:09PM Michael Webb MKWV~nre.gov Recipients entergy.com WBrice (WBrice @entergy.com)
Action Transferred Date & Time
.06/03/04 02:09PM nrc.gov owf2-po.OWFN~_DO SNB BC (Stewart Bailey) nrc.gov owf4..po.OWFNDO MKW BC (Michael Webb)
Delivered Opened Delivered Opened 06/03/04 02:09PM 06/03/04 03:4 1PM 06/03/04 02:09PM 06/03/04 02:26PM Post Office Delivered Route entergy.com nrc.gov nrc.gov owf2_po.OWFNDO owf4_po.OWFNDO 06/03/04 02:09PM 06/03104 02:09PM Files RBS DWBT RAIs EMEB.wpd MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Size 3819 1400 Date & Time 06/03/04 02:03PM 06/03/04 02:09PM No None Yes Standard No None No Standard Immediate Delivered & Opened
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST LAR-2004-02 ONE-TIME EXTENSION OF DRYWELL BYPASS LEAKAGE TEST INTERVAL RIVER BEND STATION. UNIT 1 TAC NO. MC2071
- 1.
The amendment request states that two drywell bypass leakage tests (DBWTs) have been performed. Provide the results of these tests and describe any remedial actions taken to restore leakage to acceptable limits.
- 2.
Discuss whether significant drywell leakage can be detected during normal operation.
- 3.
The DWBTs and inspections complement each other in ensuring the structural and functional integrity of the drywell and containment. The amendment request does not provide information related to the structural and functional integrity of the drywell.
Describe the inspections (i.e., inservice inspection program or other programs) used to verify the integrity of the drywell boundary, including the drywell head to flange connections and other drywell penetrations. Provide a summary of the acceptance criteria, degradations found during these examinations (including location, size, root cause, etc.), and corrective actions taken.
ATTACHMENT