ML042430217

From kanterella
Jump to navigation Jump to search
Draft Information for June 2004 - Email from Webb to Brice - 10/03/04
ML042430217
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/03/2004
From: Michael Webb
NRC/NRR/DLPM/LPD4
To: Brice W
Entergy Nuclear
Webb M, NRR/DLPM, 415-1347
Shared Package
ML042450085 List:
References
Download: ML042430217 (3)


Text

Michael Webb - RAI Questions regarding RBS Drywefl Bypass Test Interval Extension - With attachment Page 1 1 From: Michael Webb To: WBrice@entergy.com Date: 6/3/04 2:09PM

Subject:

RAI Questions regarding RBS Drywell Bypass Test Interval Extension - With attachment Bill, I have attached RAI questions that were forwarded to me by the staff of the Civil and Engineering Mechanics Section of the Mechanical and Civil Engineering Branch of the Division of Engineering regarding River Bend Station License Amendment Request (LAR 2004-02) dated February 16, 2004, (NRC TAC MC2071) which seeks a one-time extension of the Drywell Bypass Test Interval.

After you and your colleagues have had a chance to evaluate them, we can set up a call to discuss them further if you desire to do so.

Thanks, Mike Webb NRC Project Manager for Rver Bend Station 301-415-1347

/Q/v&7 /a7 Sr/rno,'

DJoctr T. o p,' J /I Je/b

CAW1ND0WS\TEMP\GW)00001.TMP Paqe 11- 1 TMPPa-C:\WNDOS\TMP\WIOOO1 Mail Envelope Properties (40BF6948.95D: 5 : 21368)

Subject:

RAI Questions regarding RBS Drywell Bypass Test Interval Extension -

With attachment Creation Date: 6/3/04 2:09PM From: Michael Webb Created By: MKWV~nre.gov Recipients Action Date & Time entergy.com Transferred .06/03/04 02:09PM WBrice (WBrice @entergy.com) nrc.gov owf2-po.OWFN~_DO Delivered 06/03/04 02:09PM SNB BC (Stewart Bailey) Opened 06/03/04 03:4 1PM nrc.gov owf4..po.OWFNDO Delivered 06/03/04 02:09PM MKW BC (Michael Webb) Opened 06/03/04 02:26PM Post Office Delivered Route entergy.com owf2_po.OWFNDO 06/03/04 02:09PM nrc.gov owf4_po.OWFNDO 06/03104 02:09PM nrc.gov Files Size Date & Time RBS DWBT RAIs EMEB.wpd 3819 06/03/04 02:03PM MESSAGE 1400 06/03/04 02:09PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST LAR-2004-02 ONE-TIME EXTENSION OF DRYWELL BYPASS LEAKAGE TEST INTERVAL RIVER BEND STATION. UNIT 1 TAC NO. MC2071

1. The amendment request states that two drywell bypass leakage tests (DBWTs) have been performed. Provide the results of these tests and describe any remedial actions taken to restore leakage to acceptable limits.
2. Discuss whether significant drywell leakage can be detected during normal operation.
3. The DWBTs and inspections complement each other in ensuring the structural and functional integrity of the drywell and containment. The amendment request does not provide information related to the structural and functional integrity of the drywell.

Describe the inspections (i.e., inservice inspection program or other programs) used to verify the integrity of the drywell boundary, including the drywell head to flange connections and other drywell penetrations. Provide a summary of the acceptance criteria, degradations found during these examinations (including location, size, root cause, etc.), and corrective actions taken.

ATTACHMENT