July 2004 Monthly Operating Report for Turkey Point Units 3 and 4
ML042370427
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/11/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-183
Download: ML042370427 (3)


Text

FPL AUG 11. 2004 L-2004-183 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

f aA an FPL Group company

fA 7 -

1 

I DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period July, 2004 50-250 Turkey Point Unit 3

,08/14/2004 Ronald Everett (305) 246-6190 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 5111 207644.2 No. of hours generator was on line (service hours) 744 5038.6 205179.1 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 516398 3529136 134333781 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A-Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TraininglUcense Examination F -Administrative G -Operational Error (Explain)

H -Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power the month of July, 2004

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4

. 08/14/2004

.Ronald Everett (305) 246-6190 Reporting Period July, 2004 Design Electrical Rating (MWe-Net) 720

__,__r,,

Maximum Dependable Capacity (MWe-Net) 693 I-___________-v Month Year-to-date Cumulative No. of hours reactor was critical 744 5069.9 204489.7 No. of hours generator was on line (service hours) 744 5016.5 199994.9 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 512164 3514623 132036191 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A-Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of July, 2004, with the exception of a reduction to 90%

power due to secondary side swings July 20'h. The unit returned to 100% power on July 2 1".