L-2004-183, July 2004 Monthly Operating Report for Turkey Point Units 3 and 4
| ML042370427 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/11/2004 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2004-183 | |
| Download: ML042370427 (3) | |
Text
AUG 11. 2004 FPL L-2004-183 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
f aA an FPL Group company
fA 7- 1 '- -
- . I DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: ,08/14/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period July, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
_ Month Year-to-date Cumulative No. of hours reactor was critical 744 5111 207644.2 No. of hours generator was on line (service hours) 744 5038.6 205179.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 516398 3529136 134333781 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TraininglUcense Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power the month of July, 2004
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: . 08/14/2004 COMPLETED BY: .Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period July, 2004 Design Electrical Rating (MWe-Net) 720 _ __,__r,,
Maximum Dependable Capacity (MWe-Net) 693 I-___________-v Month Year-to-date Cumulative No. of hours reactor was critical 744 5069.9 204489.7 No. of hours generator was on line (service hours) 744 5016.5 199994.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 512164 3514623 132036191 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of July, 2004, with the exception of a reduction to 90%
power due to secondary side swings July 2 0'h. The unit returned to 100% power on July 2 1 ".
Text
AUG 11. 2004 FPL L-2004-183 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
f aA an FPL Group company
fA 7- 1 '- -
- . I DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: ,08/14/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period July, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
_ Month Year-to-date Cumulative No. of hours reactor was critical 744 5111 207644.2 No. of hours generator was on line (service hours) 744 5038.6 205179.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 516398 3529136 134333781 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TraininglUcense Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power the month of July, 2004
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: . 08/14/2004 COMPLETED BY: .Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period July, 2004 Design Electrical Rating (MWe-Net) 720 _ __,__r,,
Maximum Dependable Capacity (MWe-Net) 693 I-___________-v Month Year-to-date Cumulative No. of hours reactor was critical 744 5069.9 204489.7 No. of hours generator was on line (service hours) 744 5016.5 199994.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 512164 3514623 132036191 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of July, 2004, with the exception of a reduction to 90%
power due to secondary side swings July 2 0'h. The unit returned to 100% power on July 2 1 ".