ML042370363

From kanterella
Jump to navigation Jump to search
Control Room Isolation Radiation Monitoring Instrumentation Administrative Correction
ML042370363
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/2004
From: Grecheck E
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-343A
Download: ML042370363 (7)


Text

b P

Dominion Nuclear Connecticut, Inc.

iLlill<roiic Power Staticin borninion 9 Ihpc t.ci-1.). i i O . l d

'U'.itcrtTird, CI' 06.385 August 23, 2004 U.S. Nuclear Regulatory Commission Serial No. 04-343A Attention: Document Control Desk NL&OS/PRW RO Washington, D.C. 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 CONTROL ROOM ISOLATION RADIATION MONITORING INSTRUMENTATION ADMINISTRATIVE CORRECTION In a letter dated July 15, 2004, Dominion Nuclear Connecticut, Inc. (DNC) requested to amend Operating License DPR-65 for Millstone Power Station Unit 2 to address the resolution of a non-conservative Technical Specification.

During a review of the correspondence, it was determined that additional pages, not part of the requested changes, were inadvertently included as part of Attachment 3 of the letter. Therefore, DNC requests that Attachment 3 of the subject letter be withdrawn and that the enclosure to this letter be inserted in its place.

The substitution of the enclosure to this letter in place of Attachment 3 of the July 15, 2004 letter does not alter the proposed amendment or the Significant Hazards Consideration pursuant to the provisions of 10 CFR 50.92 found in Attachment 1 of the July 15, 2004 letter.

In accordance with 10CFR50.91(b), a copy of this letter is being provided to the State of Connecticut.

If you should have any questions regarding this submittal, please contact Mr. Paul R.

Willoughby at (804) 273-3572.

Very truly yours, U

Eugene S. Grecheck Vice President - Nuclear Support Services

Serial No. 04-343A Page 2

Enclosure:

1. Substitute Attachment 3 to July 15, 2004 letter: Re-typed Pages Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-141 5 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127

Serial No. 04-343A Docket No. 50-336 Control Room Isolation Radiation Monitoring Instrumentation COMMONWEALTH OF VIRGINIA )

1 COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck, who is Vice President -

Nuclear Support Services, of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this day of ,2004.

My Commission Expires:

3/31102 U SEAL

Serial No. 04-343A Control Room Isolation Radiation Monitoring Instrumentation ENCLOSURE LICENSE AMENDMENT REQUEST RELATED TO CONTROL ROOM ISOLATION RADIATION MONITORING INSTRUMENTATION ADMINISTRATIVE CORRECTION SUBSTITUTE ATTACHMENT 3 LETTER SERIAL NO.04-343 MILLSTONE POWER STATION, UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC

Serial No.04-343 Control Room Isolation Radiation Monitoring Instrumentation ATTACHMENT 3 LICENSE AMENDMENT REQUEST RELATED TO CONTROL ROOM ISOLATION RADIATION MONITORING INSTRUMENTATION RE-TYPED PAGES MILLSTONE POWER STATION, UNIT 2 DOMINION NUCLEAR CONNECTICUT, INC

TABLE3.3-6 r DIqTION MONITORING INSTRUMENTATION (A

MINLMLTM 8 CHANNELS APPLICABLE ALARM/TRP MEASUREMENT 5

2 INSTRUMENT

1. AREAMONITORS
a. Spent Fuel Storage OPERABLE 2
  • MODES SETPOINT 100 mR/hr RANGE 10 1 0 4 mR/hr ACTION 13 4

w and Ventilation System Isolation

b. Control Room Isolation 2 ALL MODES 2 m lo- - ldmR/hr 16 I
c. Containment High Range 1 1,2,3,&4 100 R/hr 100 - 108 Rkr 17 y 2. PROCESSMONITORS P
a. Containment 1 ALL the value 10 - 14 x

VI Atmosphere-Particulate MODES** determined in accordance with cpm specification 4.3.3.1.2

b. Containment 1 ALL the value 10 - cpm 14 Atmosphere-Gaseous MODES*
  • determined in accordance with i

0 a

Specification 4.3.3.1.2 a c. Noble Gas Effluent 1 1,2,3,&4 2 10-l uci/cc 1 0 --~lo5 uci/cc 17 2 Monitor (high range) z I .

(Unit 2 stack)

?

  • With fuel in storage building.
    • These radiation monitors are not required to be operable during Type A Integrated Leak Rate testing.

s

TABLE 3.3-6 (Continued)

TABLE NOTATION (a) DELETED ACTION 13 - With the number of area monitors OPERABLE less than required by the MINIMUM CHANNELS OPERABLE requirement, perform area surveys of the monitored area with portable monitoring instrumentation at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ACTION 14 - With the number of process monitors OPERABLE less than required by the MINIMUM CHANNELS OPERABLE requirement either (a) obtain and analyze grab samples of the monitored parameter at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or (b) use a Constant Air Monitor to monitor the parameter.

ACTION 15 - DELETED ACTION 16 - 1. With the number of OPERABLE channels one less than required by the MINIMUM CHANNELS OPERABLE requirement, restore the inoperable channel to OPERABLE status within 7 days or initiate and maintain operation of the control room emergency ventilation system in the recirculation mode of operation.

2. With the number of OPERABLE channels two less than required by the MINIMUM CHANNELS OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the control room emergency ventilation system in the recirculation mode of operation.

ACTION 17 - With the number of OPERABLE channels less than required by the MINIMUM CHANNELS OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter(s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

1. either restore the inoperable channel(s) to OPERABLE status within 7 days of the discovery or
2. prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2within 14 days following discovery outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

MILLSTONE - UNIT 2 314 3-26 Amendment No. 25,W, 4243, M,

=,