August 27, 2004 Mr. David OBrien, Commissioner State of Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601
Dear Mr. OBrien:
I am responding to your letter to the U.S. Nuclear Regulatory Commission (NRC), dated June 9, 2004, expressing concerns over a proposed modification to the Vermont Yankee Nuclear Power Station (VYNPS) design bases. Your concerns focused on Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.s (Entergy) July 31, 2003, application requesting a revision to the design bases of the VYNPS to support the application of an alternate source term methodology. In particular, you stated that the proposal should not be approved for the following reasons:
1.
The standby liquid control system does not appear to meet the single failure criteria appropriate for a system used to mitigate the consequences of a design basis accident.
2.
The main steam isolation valve (MSIV) alternate leakage treatment pathway does not appear to meet the quality standards appropriate for a system used to mitigate the consequences of a design basis accident; and, 3.
There is no reason to double the amount of allowed leakage from MSIVs.
The NRC staff is continuing to review Entergys request and has not made a final decision on the acceptability of the proposal. We understand your concerns and will consider them in our review of the application. All comments received will be addressed in the safety evaluation documenting the NRC staffs conclusions. We thank you for taking the time to evaluate the application and provide us with your comments.
Sincerely,
/RA by JLyons for/
Ledyard Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271 cc: See next page
August 27, 2004 Mr. David OBrien, Commissioner State of Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601
Dear Mr. OBrien:
I am responding to your letter to the U.S. Nuclear Regulatory Commission (NRC), dated June 9, 2004, expressing concerns over a proposed modification to the Vermont Yankee Nuclear Power Station (VYNPS) design bases. Your concerns focused on Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.s (Entergy) July 31, 2003, application requesting a revision to the design bases of the VYNPS to support the application of an alternate source term methodology. In particular, you stated that the proposal should not be approved for the following reasons:
1.
The standby liquid control system does not appear to meet the single failure criteria appropriate for a system used to mitigate the consequences of a design basis accident.
2.
The main steam isolation valve (MSIV) alternate leakage treatment pathway does not appear to meet the quality standards appropriate for a system used to mitigate the consequences of a design basis accident; and, 3.
There is no reason to double the amount of allowed leakage from MSIVs.
The NRC staff is continuing to review Entergys request and has not made a final decision on the acceptability of the proposal. We understand your concerns and will consider them in our review of the application. All comments received will be addressed in the safety evaluation documenting the NRC staffs conclusions. We thank you for taking the time to evaluate the application and provide us with your comments.
Sincerely,
/RA by JLyons for/
Ledyard Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271 cc: See next page DISTRIBUTION:
PUBLIC REnnis CAnderson, RGN-I NRR Mail Room (YT#020040125 )
PDI-2 R/F DSkay CRaynor GMatakas, RGN-1 BSheron LCox RBorchardt VBucci, OIG CHolden AHowe MCase Accession Numbers: Package: ML042330452, Incoming: ML041620454 Response: ML042330241 OFFICE PDI-2/PM PDI-2/LA PDII-2/SC PDI/D DLPM/D NAME REnnis for DSkay CRaynor AHowe CHolden JLyons for TMarsh DATE 8/26/04 8/23/04 8/25/04 8/26/04 8/27/04 OFFICIAL RECORD COPY
Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037-1128 Ms. Christine S. Salembier, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael H. Dworkin, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Mr. Michael Hamer Operating Experience Coordinator Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.
Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 Mr. Raymond N. McCandless Vermont Department of Health Division of Occupational and Radiological Health 108 Cherry Street Burlington, VT 05402 Manager, Licensing Entergy Nuclear Vermont Yankee, LLC P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.
Framingham, MA 01702-5399 Jonathan M. Block, Esq.
Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. John Kelly Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Gary Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213
Vermont Yankee Nuclear Power Station cc:
Mr. John Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Dan Pace Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Randall Edington Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. Ken L. Graesser BWR SRC Consultant 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Jim Sniezek BWR SRC Consultant 14601 Layhill Road Silver Spring, MD 20906 Mr. Ron Toole BWR SRC Consultant 605 West Horner Street Ebensburg, PA 15931 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue, Mail Stop L-ENT-15E New Orleans, LA 70113 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301