Revision to Commitments Related to Generic Letter 2003-01, Control Room Habitability,
ML042310180
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/13/2004
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3056, GL-03-001, TAC MB9796
Download: ML042310180 (2)


Text

A%

FENOC

~~ SS01 North State R~oute 2 FirstEnergy Nuctear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilia 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket No. 50-346 License Number NPF-3 Serial Number 3056 August 13, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Revision to Commitments Related to Generic Letter 2003-01, "Control Room Habitability" (TAC No. MB9796)

Ladies and Gentlemen:

By letter dated August 11, 2003 (Serial Number 2974), the FirstEnergy Nuclear Operating Company (FENOC) submitted a 60-day response to NRC Generic Letter 2003-01 for the Davis-Besse Nuclear Power Station (DBNPS). In its response, FENOC committed to take several actions. FENOC is revising the due dates for completion of some of these commitments. The revised due dates reflect performance of integrated tracer gas testing in 2005 rather than 2004. This change in schedule is based, in part, upon the desire to develop an alternate source term analysis prior to testing. The affected commitments and revised due dates are identified in the enclosure to this letter.

If you have questions or require additional information, please contact Mr. Gregory A.

Dunn, Manager - Regulatory Affairs, at (419) 321-8450.

Very truly yours, MAR Enclosure cc: J. L. Caldwell, Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRR Senior Project Manager C. S. Thomas, NRC Region III, DB-I Senior Resident Inspector Utility Radiological Safety Board 4MoO

Docket Number 50-346 License Number NPF-3 Serial Number 3056 Enclosure COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at the DBNPS of any questions regarding this document or any associated regulatory commitments.

COMMITMENT DUE DATE The requested confirmation that the Within three months after the above Control Room meets the applicable reviews, walkdowns, analyses and tests regulatory requirements and the DBNPS are completed. (No later than March 31, design and licensing basis will be provided 2006) in a final response to this Generic Letter.

The conclusions of the confirmatory Within three months after the above reviews for this item will be provided along reviews, walkdowns, analyses and tests with the overall final response to the are completed. (No later than March 31, generic letter.

2006)

A review of dose calculations for DBAs December 31, 2005 will be conducted.

The need for surveillance requirement December 31, 2005 changes will be evaluated after the completion of analyses and testing.