ML042300347
| ML042300347 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/16/2004 |
| From: | Michelle Honcharik NRC/NRR/DLPM/LPD4 |
| To: | Eddington R Nebraska Public Power District (NPPD) |
| Honcharik M, NRR/DLPM, 301-415-1774 | |
| References | |
| TAC MC3770 | |
| Download: ML042300347 (5) | |
Text
August 16, 2004 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: ONE TIME EXTENSION OF DIESEL GENERATOR ALLOWED OUTAGE TIME (TAC NO. MC3770)
Dear Mr. Edington:
Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staff approve one time extension of diesel generator allowed outage time.
The NRC staff has reviewed the information provided in the July 15, 2004, submittal and determined that additional information is required in order to complete the review of the changes. As agreed upon in telephone call with Ed McCutchen on August 12, 2004, the licensee will respond to the request for additional information (RAI) within 45 days. The RAI is enclosed.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
RAI cc w/encl: See next page
August 16, 2004 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: ONE TIME EXTENSION OF DIESEL GENERATOR ALLOWED OUTAGE TIME (TAC NO. MC3770)
Dear Mr. Edington:
Nebraska Public Power District (the licensee) requested the Nuclear Regulatory Commission (NRC) staff approve one time extension of diesel generator allowed outage time.
The NRC staff has reviewed the information provided in the July 15, 2004, submittal and determined that additional information is required in order to complete the review of the changes. As agreed upon in telephone call with Ed McCutchen on August 12, 2004, the licensee will respond to the request for additional information (RAI) within 45 days. The RAI is enclosed.
Sincerely,
/RA/
Michelle C. Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIV-1 r/f RidsNrrDlpmLpdiv (HBerkow)
RidsNrrDlpmLpdiv1 (RGramm)
RidsNrrPMMHoncharik RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (KKennedy)
RidsNrrDlpmDpr (SWall)
RidsNrrDeDpr Jai Rajan Thomas Koshy David Terao ACCESSION NO: ML042300347
- See Tad Marsh Deferral Memo Nrr-088
- RAI input via e-mail dated OFFICE PDIV-1/PM PDIV-1/LA EMEB/SC PDIV-1/SC NAME MHoncharik DBaxley DTerao WReckley for RGramm DATE 8/16/04 N/A*
8/10/04*
8/16/04 OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042300347.wpd
Cooper Nuclear Station cc:
Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Clay C. Warren Vice President of Strategic Programs Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. John R. McPhail, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Cheryl K. Rogers, Program Manager Nebraska Health & Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Ronald A. Kucera, Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Jerry Uhlmann, Director State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65101 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street Suite D Des Moines, IA 50309 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570
Cooper Nuclear Station Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION ISSUES RELATED TO ONE TIME EXTENSION OF DIESEL GENERATOR ALLOWED OUTAGE TIME COOPER NUCLEAR STATION DOCKET NO. 50-298 (1) In Section 4.3 of the amendment request the licensee states that the temporary equipment required to perform diesel fuel movement will be located on an area of engineered fill, which is resistant to damage caused by seismic events. The licensee is requested to provide the basis for this statement, including a discussion of the level of earthquake ground motion and the load transfer between the tank and the engineered fill. The licensee is also requested to discuss the basis for the statement that the temporary equipment will remain functional during seismic events at this location, including a description of the evaluation of the ability of temporary piping and above-ground tank anchorages to withstand seismic loadings.
(2) The licensee is requested to provide bearing pressure and soil settlement data that might have been taken at the engineered fill location to assure that differential settlement is not occurring at this time and the soil bearing pressure is adequate to support the temporary equipment in a stable manner.