LB Memorandum and Order (Confirming August 10, 2004, Bench Ruling Finding Need to Know and Ordering Provision of Documents Sought by Intervenor in Discovery)
ML042300015
Person / Time
Site: Catawba  
Issue date: 08/13/2004
From: Anthony Baratta, Elleman T, Austin Young
Atomic Safety and Licensing Board Panel
To:
Byrdsong A T
References
50-413-0LA, 50-414-OLA, ASLBP 03-815-03-OLA, RAS 8325
Download: ML042300015 (10)


Text

1This proceeding involves Duke Energy Corporations (Dukes) February 2003 application to amend the operating license for its Catawba Nuclear Station to allow the use of four mixed oxide (MOX) lead test assemblies at the station, as part of the U.S.-Russian Federation nuclear nonproliferation program to dispose of surplus plutonium from nuclear weapons by converting it into MOX fuel, to be used in nuclear reactors. Letter from M.S. Tuckman, Executive Vice President, Duke Power, to NRC (Feb. 27, 2003). By Memoranda and Orders dated March 5 and April 12, 2004 (the latter sealed as Safeguards Information; redacted version issued May 28, 2004), the Licensing Board granted Blue Ridge Environmental Defense League [BREDL]s request for hearing and admitted various non-security-related and security-related contentions. LBP-04-4, 59 NRC 129 (2004); LBP-04-10, 59 NRC 296 (2004). The ruling herein relates to the one admitted security contention of BREDL.

1 UNITED STATES OF AMERICA RAS 8325 NUCLEAR REGULATORY COMMISSION DOCKETED 08/13/04 SERVED 08/13/04 ATOMIC SAFETY AND LICENSING BOARD PANEL Before Administrative Judges:

Ann Marshall Young, Chair Anthony J. Baratta Thomas S. Elleman In the Matter of DUKE ENERGY CORPORATION (Catawba Nuclear Station, Units 1 and 2)

Docket Nos. 50-413-OLA, 50-414-OLA ASLBP No. 03-815-03-OLA August 13, 2004 MEMORANDUM and ORDER (Confirming August 10, 2004, Bench Ruling Finding Need to Know and Ordering Provision of Documents Sought by Intervenor in Discovery)

During a closed session in this proceeding1 held August 10, 2004, this Licensing Board made a verbal bench ruling on BREDLs appeal of an August 6, 2004, determination by Duke, as the holder of two particular documents that are part of its security plan for its Catawba plant, that BREDL has no need to know the contents of the documents. We reversed Dukes determination and concluded that the documents shall be made available to BREDL. See Tr. 2968-69. We made this ruling verbally during the session in order to avoid delay insofar as possible and move this proceeding forward in the most expeditious manner possible, indicating at the time that we would be confirming the ruling in writing, which we now do.

2 The documents in question are listed as items 67 and 68 in an attachment to Dukes response to certain BREDL discovery requests. Letter from Mark J. Wetterhahn to Diane Curran (Aug. 6, 2004), at 5 [hereinafter Wetterhahn 8/6/04 Letter]; [Duke]s Response to

[BREDL]s First Document Production Request on BREDL Security Contention 5, Attachment 1 (July 2, 2004) at 10. Dukes determination was based on the documents not having been developed or changed to support the receipt and storage of MOX fuel and as such not being indispensable to the issue of the adequacy of the incremental measures taken to protect the MOX lead assemblies against theft, and on their represent[ing] particularly sensitive information and [being] subject to the policy considerations of limiting access to safeguards and security information and avoiding inadvertent security breaches. Wetterhahn 8/6/04 Letter at 5; see id. at 4.

During the course of the August 10 closed session, the Board ascertained from Duke counsel that, although the documents were not part of those security-related procedures and measures adopted by Duke to protect the MOX fuel assemblies at issue in this proceeding, they do govern the reaction of the security force to any threat to the facility, including the ability [of any threat] to get into the facility, the details of the defenders, where they are positioned, where they have to go and the details of the response strategy, as well as timelines and details of how a security incident is defined and how defenders are to react to an incident. Tr. 2911-12 see id. at 2964-65. Although Duke argued that the documents were not indispensable to BREDL because it has already been granted access to other relevant documents, Duke was unwilling to forego the possibility of relying on part or parts of the documents in question or of asking the Board to consider these in our ultimate decision in this proceeding, should BREDL posit a scenario in which intruders would get into the plant and into the spent fuel building, get the MOX fuel and escape with it. See Tr. 2927-30. For example, Duke counsel stated at one

2 Although the transcript at 2927 does not indicate counsels name, it is evident from the language and context that it was he who was speaking at this point.

3 point, I cant say, given the state that were in on this hypothetical that Id [never] ever argue that its not something that we wouldnt somehow or partially rely on, both as the timeline or how long it takes. Tr. 2927.2 Counsel further agreed that there exists the possibility that with regard to these two procedures, that if we relied on these two procedures, at some point wed have to give it to [BREDL]. Tr. 2931.

BREDL for its part insists that it has a current need to know with regard to the two disputed documents, in order to postulate scenarios for pointing out vulnerabilities in Dukes security plan. If it is to posit detailed scenarios of successful attempts to divert or steal plutonium MOX fuel from the Catawba nuclear power plant, it argues, then it must be given access to a level of detail regarding Dukes security measures that would allow it to evaluate the number of responders, their weaponry, their positions, and the time it will take them to get to their positions. [BREDL]s Appeal of [Duke]s August 6, 2004 Need-To-Know Determination (Aug. 6, 2004), at 2-3. Speaking through its expert, Edwin Lyman, during the August 10 session, it explained, for example, that a key issue is the amount of time one has to circumvent those fine line measures, and that the time you have available does depend on your strategy to defeat or otherwise contain the onsite response force and what you know about any additional offsite responders and their response times. Tr. 2915. Continuing, Dr. Lyman stated that we need to know, first of all, how many forces to deploy and the strategy for getting onto the site, emphasizing that this, along with the likely response from the armed responders, was a critical bit of information in how you would then go about the successive steps to obtain the fuel and to remove it. Id. at 2915-16; see id. at 2917-18.

Staff counsel indicated that it seems that whether or not BREDL should be found to have a need to know the contents of the documents in question at this point depends on how

4 the Board interprets the Commissions indispensability standard for need-to-know determinations in the discovery phase of a proceeding according to Dukes interpretation or the Staffs. See Tr. 2953-56; 2960-61; see also CLI-04-06, 59 NRC 62, 73 (2004). Duke counsel agreed that the need-to-know determination we are called upon to make appears to hinge on the discovery standard. Tr. 2961.

Duke construes the indispensability standard as being different from and more stringent than the discovery standard of reasonably calculated to lead to the discovery of admissible evidence. See Wetterhahn 8/6/04 Letter at 3. According to Duke:

To be indispensable, a document containing Safeguards Information must be narrowly related to the issues in the proceeding, and the particular information requested must be essential to the development of the case regarding the admitted contention. Put another way, under the indispensability standard, an expert in security would find it impossible to analyze the incremental security measures taken to prevent theft of the MOX lead test assemblies and prepare testimony and assist in cross examinations on the limited issue before the Licensing Board without the document in question.

Id.

The Staff, on the other hand, interprets the indispensability standard as being defined by the reasonably calculated to lead to the discovery of admissible evidence discovery standard during the discovery phase of a proceeding. Letter from Margaret J. Bupp to Diane Curran (Aug. 3, 2004) at 1 [hereinafter Bupp 8/3/04 Letter]; see also Tr. 2951. According to the Staff, during the discovery phase, if there is a safeguards document[ ] involved,... and its reasonably likely, reasonably calculated to lead to admissible evidence at the evidentiary hearing stage of the proceeding, then it should be produced to the party requesting it.

Tr. 2951. In its recent need-to-know determination on various documents requested by BREDL, the Staff stated, inter alia, that

[i]t is the Staffs position that nothing in either CLI-04-19 or CLI-04-21 changes the positions set out by the Commission in CLI-04-06. That decision was limited to a finding that BREDL had a need-to-know in relation only to information [that

5 was] indispensable to BREDLs opportunity to frame [a] litigable contention.

[CLI-04-06, 59 NRC 62, 67 (2004)]. However, CLI-04-06 was limited to the contention stage. At this stage of the hearing, the question becomes what information is indispensable to discovery. In making this determination, the Staff looks to two sources. First the traditional discovery standard, that information is discoverable if it is reasonably calculated to lead to admissible evidence.

Second, the Staff follows the Commissions admonition that access to safeguards documents be as narrow as possible. [Id.]

Bupp 8/3/04 Letter at 1-2. The Staff found a need to know regarding information reasonably calculated to lead to admissible evidence, but provided for redaction so that only those portions of a document related to the exemptions requested by Duke and the additional security measures proposed in support of those exemptions would be disclosed. Id. at 2.

We find the Staffs approach to be a reasonable one, and to be in keeping with the analysis we have implicitly applied previously in this proceeding. See Licensing Board Order (Ruling on Duke Energy Corporation Objection to BREDL Document Production Request No. 2 Regarding BREDL Security Contention) (June 28, 2004) (unpublished). Notwithstanding Dukes argument that the discovery standard and the indispensability standard are two different things, Tr. 2940, the traditional discovery standard of whether information is reasonably calculated to lead to the discovery of admissible evidence, see FRCP 26(b)(1),

which is also contained in the applicable rules in this proceeding, see former 10 C.F.R.

§ 2.740(b)(1), has, as it has developed, come to define what is necessary and indispensable to a party in preparing for litigation on any cause or issue. And, as the Commission has stated and the NRC Staff has recognized, a partys need to know may be different at different stages of an adjudicatory proceeding, depending on the purpose of the request for information.

CLI-04-06, 59 NRC at 72; see Bupp 8/3/04 Letter at 1; Tr. 2951. As stated by Staff counsel, this language means something. Tr. 2951. We thus look to whether the information sought is indispensable to BREDL in preparing for litigation of Contention 5, in the sense of being needed for discovery and reasonably calculated to lead to the discovery of admissible evidence.

6 We find that the material in question is indispensable to BREDL in preparing for the hearing on Contention 5. Clearly, the material is not only reasonably calculated to lead to the discovery of admissible evidence, it may well be admissible evidence itself, as part of the information used in any scenario(s) that BREDL will formulate, as well as in addressing Dukes likely defenses to any BREDL scenarios. With regard to the latter point, we find that the likelihood of Duke relying on information in the documents cannot be said to be so small that we could find the standard for discovery not to have been met at this point. To the contrary, as pointed out by BREDL counsel on August 10, Duke has already in fact stated that it plans to rely on the existing security force at Catawba. Tr. 2958-59; see also [Duke]s Answers to

[BREDL]s First Set of Interrogatories on BREDL Security Contention 5 (July 2, 2004) at 14.

More importantly, we conclude that BREDL has a current need for the information in question, which it requested in discovery, and that the information is indispensable in formulating scenarios to demonstrate any asserted vulnerabilities in Dukes planned security measures for the MOX fuel. Indeed, taking into account, as we have previously noted, the integrated nature of nuclear power plant security, we cannot say that BREDL could prepare an effective scenario whether or not it ultimately successfully points out any vulnerabilities without access to information on timelines and other details relating to security measures and procedures to prevent access to the plant, whether for radiological sabotage or theft. And thus, even under Dukes argued standard of essential to the development of the case regarding the admitted contention, the material is discoverable.

In making our ruling on August 10 and confirming it herein, we are cognizant of, and wish to highlight, Dukes statement, noted above, that there exists the possibility that with regard to these two procedures, that if we relied on these two procedures, at some point wed have to give it to [BREDL]. Tr. 2931. We also note counsels statement that, if at some point

7 Duke relied on the documents in question, then we agree that they would have a right to stop the proceeding, or to some point examine these and take the time necessary to determine how they would respond to that. Tr. 2930. Counsel agreed, moreover, that it might be the case that, should we follow the approach in effect suggested by counsel to delay providing the materials at issue until such time as Duke specifically indicates some reliance on them this would involve further delay in the sense of providing at such point for a time period for BREDL to look at the materials and for additional hearing time to take more evidence on whatever was thereby produced. See Tr. 2931-32. As stated by the Chair at that time, Duke in such instance would have to recognize that it would be giving up any opportunity to complain about the time that it took to go through that procedure, by virtue of urging us to delay provision of the materials at issue until such time as Duke relied on them to defend against any scenario presented by BREDL. Tr. 2932. Counsel agreed that this might present a problem. Tr. 2935.

We find that Dukes proposal in effect that we at the same time rule quickly on the issue now before us, see Tr. 2939, and also leave for a later time any ruling actually providing access to the materials in question, would indeed be problematic were we to take the latter course.

Such a course could very plausibly create significant inefficiencies in the time it would take to make the materials available to BREDL, allow its counsel and expert to prepare a modified scenario or scenarios in response, and then allow time for all parties to present evidence and argument on both a probable defense of Duke and BREDLs new scenario(s). To go through essentially the same process twice the likely impact of such a course would obviously cause delay, in this case in which Duke strongly urges an accelerated schedule. Indeed, Dukes acknowledgment that the materials might well at some point need to be provided supports our ruling herein. As noted at the August 10 session, discovery is designed to get all information that is likely to be relevant in a hearing out on the table prior to a hearing, in order

8 to promote the efficient conduct of a proceeding. To wait, as applicant Duke would have us do, and at a later date go through the process discussed above would, we find, cause undue and unnecessary delay in this proceeding.

We therefore direct Duke to make available the documents in question. The Staff may view the materials to see whether it believes any redactions are necessary, provided this is done in a timely manner, and takes into account Duke counsels own statement that the documents in question are so short and so Catawba-specific that if you removed any portion of it, [ ] in essence, it would counter [the Boards] ruling. Tr. 2971. Absent an appeal and stay of this ruling, the materials shall be made available as soon as possible, and any disputes on redaction issues shall likewise be brought to the attention of the Board at the earliest possible time, and will be considered to the degree necessary at the next scheduled closed session in this proceeding, on September 1, 2004, at 10:00 a.m.

It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

Ann Marshall Young, Chair ADMINISTRATIVE JUDGE

/RA/

Anthony J. Baratta ADMINISTRATIVE JUDGE

/RA/

Thomas S. Elleman ADMINISTRATIVE JUDGE Rockville, Maryland August 13, 2004

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

DUKE ENERGY CORPORATION

)

Docket Nos. 50-413-OLA

)

50-414-OLA (Catawba Nuclear Station, Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB MEMORANDUM AND ORDER (CONFIRMING AUGUST 10, 2004, BENCH RULING FINDING NEED TO KNOW AND ORDERING PROVISION OF DOCUMENTS SOUGHT BY INTERVENOR IN DISCOVERY) have been served upon the following persons by deposit in the U.S. mail, first class, or through NRC internal distribution.

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Thomas S. Elleman Atomic Safety and Licensing Board Panel 5207 Creedmoor Rd., #101 Raleigh, NC 27612 Susan L. Uttal, Esq.

Antonio Fernández, Esq.

Margaret J. Bupp, Esq.

Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Henry B. Barron, Executive Vice President Nuclear Operations Duke Energy Corporation 526 South Church Street P.O. Box 1006 Charlotte, NC 28201-1006 Mary Olson Director of the Southeast Office Nuclear Information and Resource Service 729 Haywood Road, 1-A P.O. Box 7586 Asheville, NC 28802 Diane Curran, Esq.

Harmon, Curran, Spielberg

& Eisenberg, L.L.P.

1726 M Street, NW, Suite 600 Washington, DC 20036

2 Docket Nos. 50-413-OLA and 50-414-OLA LB MEMORANDUM AND ORDER (CONFIRMING AUGUST 10, 2004, BENCH RULING FINDING NEED TO KNOW AND ORDERING PROVISION OF DOCUMENTS SOUGHT BY INTERVENOR IN DISCOVERY)

David A. Repka, Esq.

Anne W. Cottingham, Esq.

Mark J. Wetterhahn, Esq.

Winston & Strawn LLP 1400 L Street, NW Washington, DC 20005 Lisa F. Vaughn, Esq.

Duke Energy Corporation Mail Code - PB05E 422 South Church Street P.O. Box 1244 Charlotte, NC 28201-1244 Paul Gunter Nuclear Information and Resource Service 1424 16th St., NW, Suite 404 Washington, DC 20036 Timika Shafeek-Horton, Esq.

Duke Energy Corporation Mail Code - PB05E 422 South Church Street Charlotte, NC 28242

[Original signed by Evangeline S. Ngbea]

Office of the Secretary of the Commission Dated at Rockville, Maryland, this 13th day of August 2004