PAM Instrumentation 3.3.15 3.3 INSTRUMENTATION 3.3.15 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.15 APPLICABILITY:
The PAM instrumentation for each Function in Table 3.3.15-1 shall be OPERABLE.
MODES 1, 2, and 3.
ACTIONS
,krIvTCrO IN I t a1 -
J I __
- 1. LCO 3.0.4 is not applicable
- 2. Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required channel to 30 days with one required channel OPERABLE status.
B. Required Action and B.1 Initiate action to prepare Immediately associated Completion and submit a Special Time of Condition A not Report.
met.
C. One or more Functions C.1 Restore one channel to 7 days with two required channels OPERABLE status.
D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C not Table 3.3.15-1 for the met.
channel.
I I
I ANO-1 3.3.1 5-1 Amendment No. 21-6, 222
PAM Instrumentation 3.3.15 CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required E.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action D.1 and referenced in Table 3.3.15-1.
AND E.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. As required by Required F.1 Initiate action to prepare Immediately Action D.1 and referenced and submit a Special in Table 3.3.15-1.
Report.
SURVEILLANCE REQUIREMENTS
NOTE-----------------------
These SRs apply to each PAM instrumentation Function in Table 3.3.15-1.
SURVEILLANCE FREQUENCY SR 3.3.15.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
NOTE------------------------------------
Neutron detectors are excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION.
18 months I
I ANO-1 3.3.15-2 Amendment No. 24-5, 222
PAM Instrumentation 3.3.15 Table 3.3.15-1 Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM FUNCTION REQUIRED CHANNELS REQUIRED ACTION D.1 I
- 1. Wide Range Neutron Flux
- 2.
RCS Hot Leg Temperature
- 3.
RCS Hot Leg Level
- 4.
RCS Pressure (Wide Range)
- 5.
- 6.
Reactor Building Water Level (Wide Range)
- 7.
Reactor Building Pressure (Wide Range)
- 8.
Penetration Flow Path Automatic Reactor Building Isolation Valve Position
- 9.
Reactor Building Area Radiation (High Range)
- 10. Deleted
- 11. Pressurizer Level
- 12. a. SG "A" Water Level - Low Range
- b. SG 'B" Water Level - Low Range
- c. SG "A" Water Level - High Range
- d. SG "B" Water Level - High Range
- 13. a. SG 'A" Pressure
- b. SG B" Pressure
- 14. Condensate Storage Tank Level
- 15. Borated Water Storage Tank Level
- 16. Core Exit Temperature (CETs per quadrant)
- 18. High Pressure Injection Flow
- 19. Low Pressure Injection Flow
- 20. Reactor Building Spray Flow 2
2 2
2 2
2 2
2 per penetration flow path(a)(b) 2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
E E
F E
F E
E E
I I
I I
I I
I I
F I
I (a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.