August 11, 2004 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
ERRATA LETTER FOR NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 SUPPLEMENTAL INSPECTION
Dear Mr. Gannon:
We have become aware that our letter, dated August 2, 2004, subject Notification of Brunswick Steam Electric Plant Unit 2 Supplemental Inspection - NRC Inspection Report 50-325/2003-08 and 50-324/2003-08", referenced the wrong inspection report number in the Subject line. The number should be 50-325/2004-08 and 50-324/2004-08". Please substitute the enclosed amended page into all copies of the August 2, 2004, Notification of Brunswick Steam Electric Plant Unit 2 Supplemental Inspection letter. The ADAMS Accession Number for that document is ML042160062. We apologize for any inconvenience caused by this error. Should you have any questions concerning this matter, please contact me at (404) 562-4530.
Sincerely,
/RA/
Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-324 License No: DPR-62
Enclosures:
- 1. Errata Sheet
- 2. Notification of Supplemental Inspection Amended Page cc w/encls: (See page 2)
TVA 2
cc w/encls:
W. G. Noll, Director Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution David H. Hinds, Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company Electronic Mail Distribution Edward T. ONeil, Manager Site Support Services Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution Leonard R. Beller, Supervisor Licensing/Regulatory Programs Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution William D. Johnson Vice President & Corporate Secretary Carolina Power & Light Company Electronic Mail Distribution John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street NW Washington, DC 20037-1128 Beverly O. Hall, Section Chief Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Margaret A. Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Jo. A. Sanford, Chair North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 David R. Sandifer, Chairperson Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee, Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402-1525 Distribution w/encl: (See page 3)
TVA 3
Distribution w/encl:
B. Mozafari, NRR L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB R. Hagar, RII PUBLIC OFFICE DRP/RII SIGNATURE PEF NAME PFredrickson:as DATE 08/11/2004 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML042240327.wpd August 2, 2004 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 SUPPLEMENTAL INSPECTION - NRC INSPECTION REPORT 50-325/2003-08 AND 50-324/2003-08
Dear Mr. Gannon:
In a Final Significance Determination letter, dated June 2, 2004, from Mr. Loren Plisco, the Region II Deputy Regional Administrator, you were informed that the NRC had concluded that the final significance determination of a Brunswick Steam Electric Plant Unit 2 finding associated with an emergency diesel generator jacket water cooling system leak, had been characterized as White (i.e., an issue of low to moderate safety significance, which may require additional NRC inspection). Also in this letter you were informed that, because Brunswick Unit 2 plant performance for this issue had been determined to be in the increased regulatory response band, we would use the NRC Action Matrix to determine the most appropriate NRC response for the finding, and notify you by separate correspondence of our determination.
The purpose of this letter is to notify you that we plan to conduct a Supplemental Inspection of Brunswick Unit 2 during the week of August 23, 2004. The inspection will be conducted by Mr.
Bob Hagar, the Senior Resident Inspector at the H. B. Robinson Nuclear Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the inspection will be conducted using NRC Inspection Procedure 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area.
Discussions between Mr. Eugene DiPaolo of my staff and Mr. Steve Tabor of your staff have taken place to allow for scheduling conflicts and personnel availability to be resolved in advance of this inspection. Thank you for your cooperation in this matter. If you have any questions regarding the inspection, please contact Mr. Hagar at (843) 383-4571 or me at (404) 562-4530.
August 2, 2004 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 SUPPLEMENTAL INSPECTION - NRC INSPECTION REPORT 50-325/2004-08 AND 50-324/2004-08
Dear Mr. Gannon:
In a Final Significance Determination letter, dated June 2, 2004, from Mr. Loren Plisco, the Region II Deputy Regional Administrator, you were informed that the NRC had concluded that the final significance determination of a Brunswick Steam Electric Plant Unit 2 finding associated with an emergency diesel generator jacket water cooling system leak, had been characterized as White (i.e., an issue of low to moderate safety significance, which may require additional NRC inspection). Also in this letter you were informed that, because Brunswick Unit 2 plant performance for this issue had been determined to be in the increased regulatory response band, we would use the NRC Action Matrix to determine the most appropriate NRC response for the finding, and notify you by separate correspondence of our determination.
The purpose of this letter is to notify you that we plan to conduct a Supplemental Inspection of Brunswick Unit 2 during the week of August 23, 2004. The inspection will be conducted by Mr.
Bob Hagar, the Senior Resident Inspector at the H. B. Robinson Nuclear Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the inspection will be conducted using NRC Inspection Procedure 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area.
Discussions between Mr. Eugene DiPaolo of my staff and Mr. Steve Tabor of your staff have taken place to allow for scheduling conflicts and personnel availability to be resolved in advance of this inspection. Thank you for your cooperation in this matter. If you have any questions regarding the inspection, please contact Mr. Hagar at (843) 383-4571 or me at (404) 562-4530.