plkRuke D.M. JAMIL dPowere SAFEGUARDS INFORMATION Vice President A Duke Energy Company Duke Power Catawba Nuclear Station 4800 Concord Rd. / CNOI VP York, SC 29745-9635 803 831 4251 803 831 3221 fax August 9, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50-414 Response to NRC Request For Additional Information, Letter Dated July 23, 2004 The U.S. Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003, requiring compliance with Revised Design Basis Threat ("Order EA-03-086") and other security related Orders (collectively "Orders") in Docket Nos. 50-269, 50-270, 50-287, Oconee Nuclear Station, 50-369, 50-370, McGuire Nuclear Station, and 50-413, 50-414, Catawba Nuclear Station.

On June 2, 2003, pursuant to 10 CFR §50.4 and Conditions Ill A.l, B.l and B.2, Duke Energy Corporation ("Duke") submitted its response to Order EA-03-086.

On April 27, 2004 Duke submitted a supplemental response to Order EA-03-086.

On July 23, 2004 the NRC transmitted a Request for Additional Information ("RAI")

containing safeguards informnation in a letter to Mr. Henry B. Barron, Group Vice President, Nuclear Generation and Chief Nuclear Officer, Duke Energy Corporation. The July 23 RAI was based on the NRC endorsed template developed by the Nuclear Energy Institute NEI-03-12, Revision 1, dated April 2004, including the NRC staffs final position on certain issues which was provided by separate correspondence.

SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO TIMS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE www.dukepower.com PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission August 9, 2004 Page 2 Consistent with the requirements of 10 CFR §50.4, attached hereto as Attachment I is Duke's response to the July 23,' 2004 NRC RAI. Upon resolution of this and forthcoming NRC RAI, Duke will submit a revision to the April 27, 2004 submittal. The attached information contains Safeguards Information and is subject to 10 CFR §73.21 restrictions.

Also, the attached information contains licensee physical protection information.

Therefore, Duke requests that it be withheld from public disclosure pursuant to 10 CFR §2.790(d)(1).

If you have any questions regarding this submittal, please contact Randall D. Hart, Catawba Nuclear Station, at (803) 831-3622.

Sincerely, Dhiaa M. Jamil Vice President Catawba Nuclear Station Attachment SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission August 9, 2004 Page 3 Dhiaa M. Jamil affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

Subscribed and sworn to me:

g_-q-Abo V Date Notary P*lic My Commission Expires:

7 l °0 - X I 2 Date SEAL SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission August 9, 2004 Page 4 xc:

Deirdre W. Spaulding, Project Manager, Security Plan Review Team Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852 W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center, Suite 23T85 61 Forsyth St., SW Atlanta, GA 30303-8931 L. N. Olshan (addressee only) (without attachment)

NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J.J. Shea (addressee only) (without attachment)

NRC Senior Project Manager (MNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S. E. Peters (addressee only) (without attachment)

NRC Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop 0-8 G9 Washington, DC 20555-0001 M. C. Shannon (without attachment)

NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady (without attachment)

NRC Senior Resident Inspector McGuire Nuclear Station E. F. Guthrie (without attachment)

NRC Senior Resident Inspector Catawba Nuclear Station SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."