Requalification Program Inspection - Edwin I. Hatch Nuclear Plant
ML042180350
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/05/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Sumner H
Southern Nuclear Operating Co
References
Download: ML042180350 (7)


Text

August 5, 2004 Southern Nuclear Operating Company, Inc.

ATTN: Mr. H. L. Sumner, Jr.

Vice President P. O. Box 1295 Birmingham, AL 35201-1295

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - EDWIN I. HATCH NUCLEAR PLANT

Dear Mr. Sumner:

In a telephone conversation on August 4, 2004, Mr. Timothy Kolb, Operations Examiner, and Mr. Steve Grantham, Operations Training Superintendent, made arrangements for the NRC to inspect the licensed operator requalification program at the Hatch Nuclear Power Plant. The inspection is planned for the week of September 20, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI Standard 3.5-1985.

In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (one week prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRCs inspection program needs. Mr. Grantham has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

SNC 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Timothy Kolb at (404) 562-4665 or myself at (404) 562-4638.

Sincerely,

/RA/

Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5

Enclosure:

Materials Request List cc w/encl: (See page 3)

SNC 3 cc w/encl contd:

J. B. Beasley, Jr. Resident Manager Executive Vice President Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution George R. Frederick Senior Engineer - Power Supply General Manager, Plant Hatch Municipal Electric Authority Southern Nuclear Operating Company, Inc. of Georgia Electronic Mail Distribution Electronic Mail Distribution Raymond D. Baker Reece McAlister Manager Licensing - Hatch Executive Secretary Southern Nuclear Operating Company, Inc. Georgia Public Service Commission Electronic Mail Distribution 244 Washington Street, SW Atlanta, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders John C. Lewis Electronic Mail Distribution Training Manager E. I. Hatch Nuclear Plant Laurence Bergen U. S. Highway 1 North Oglethorpe Power Corporatioln P. O. Box 2010 Electronic Mail Distribution Baxley, GA 31513 Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse Baxley, GA 31513

SNC 4 Distribution w/encl:

C. Gratton, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA By J. Munday for/

NAME M Bates:pmd T Kolb MErnstes BBonser DATE 8/ 5 /2004 8/ 5 /2004 8/ 5 /2004 8/ 5 /2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML042180350.wpd

Materials Request List The items listed below are being requested per telephone conversation on August 4, 2004, to support the upcoming IP-71111.11 B inspection in September 2004 at Hatch Nuclear Power Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by September 13, 2004. Please have the items listed in paragraph "B" ready for our review upon arrival on September 20, 2004.

A. In-office inspection material:

1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2. A copy of the last biennial requal written examination. (2RO/SRO exams)
3. List of personnel scheduled for requal testing the week of 09/22/03.
4. Copies of simulator scenarios for this exam.
5. Program evaluation for the previous 2 years training cycle (This could also be any Self Assessments performed during the previous 2 years).
6. A list of all personnel that reactivated their licenses since the last requal inspection.
7. Simulator:

List of all open simulator discrepancies (DRs).

Copy of the Simulator Management and Configuration Procedures.

List of all closed simulator DRs for last 12 months.

List of Simulator Performance tests.

B. On-site inspection material:

1. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2. All training feedback forms since the last requal inspection.
3. All remedial training packages since the last requal inspection.
4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.

Enclosure

2

5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7. All Medical Exam Records with a copy of the individuals licence available. A list for review will be presented during the inspection week.
8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9. Copy of an Organizational Chart for the training department including the simulator group.
10. Complete list of all licensed individuals complete with license restrictions.
11. Security procedures for the simulator.

Enclosure