MONTHYEARML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam ML22213A0502022-08-0101 August 2022 2022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments ML19218A3792019-08-0606 August 2019 Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 ML19099A2872019-04-0909 April 2019 2019 Schedule Confirmation for Hatch ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18057B0452018-02-26026 February 2018 NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0512018-02-26026 February 2018 NRC SRO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18057B0802017-10-17017 October 2017 Operating Post Examination Comments NL-17-1767, Hatch 2017 301 Operating Post Examination Comments2017-10-17017 October 2017 Hatch 2017 301 Operating Post Examination Comments ML17187A2272017-07-0606 July 2017 Hat 2016-301 Exam Final Items - Delay Release 2 Yrs ML17187A2252017-07-0606 July 2017 Hat 2016-301 Exam Draft Items - Delay Release 2 Yrs ML17187A2292017-07-0606 July 2017 Hat 2016-301 Exam Administrative Items - Delay Release 2 Yrs ML17052A6842017-02-15015 February 2017 Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000321/20163012016-09-0707 September 2016 NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301 ML16214A1802016-08-0101 August 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release ML16214A1942016-08-0101 August 2016 Initial Exam 2016-301 Post Exam Comments - Delay Release ML16214A1892016-08-0101 August 2016 Initial Exam 2016-301 Final SRO Written - Delay Release ML16166A4392016-06-13013 June 2016 E.I. Hatch - Operator Licensing Written Examination Approval 05000321/2016301 and 05000366/2016301 ML15176A5702015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator in Plant JPMs ML15176A5802015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative JPMs ML15176A5432015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15176A5412015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative Documents ML15175A4632015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15175A4622015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator In-plant JPMs ML15175A4582015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15175A4492015-06-22022 June 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15175A4432015-06-22022 June 2015 Initial Exam 2015-301 Draft RO Written Exam ML15175A4292015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrave Documents ML15223B3212015-05-21021 May 2015 Initial Exam 2011-301 Draft Simulator Scenarios ML15105A2902015-04-0909 April 2015 Initial Exam 2015-301 Final SRO Written Exam ML15105A2842015-04-0909 April 2015 Initial Exam 2015-301 Final RO Written Exam ML14344A3712014-12-0808 December 2014 Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 2024-01-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments ML19218A3792019-08-0606 August 2019 Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 ML19099A2872019-04-0909 April 2019 2019 Schedule Confirmation for Hatch NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18057B0452018-02-26026 February 2018 NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0512018-02-26026 February 2018 NRC SRO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0802017-10-17017 October 2017 Operating Post Examination Comments NL-17-1767, Hatch 2017 301 Operating Post Examination Comments2017-10-17017 October 2017 Hatch 2017 301 Operating Post Examination Comments ML17187A2272017-07-0606 July 2017 Hat 2016-301 Exam Final Items - Delay Release 2 Yrs ML17187A2292017-07-0606 July 2017 Hat 2016-301 Exam Administrative Items - Delay Release 2 Yrs ML17187A2252017-07-0606 July 2017 Hat 2016-301 Exam Draft Items - Delay Release 2 Yrs ML17052A6842017-02-15015 February 2017 Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000321/20163012016-09-0707 September 2016 NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301 ML16214A1802016-08-0101 August 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release ML16214A1942016-08-0101 August 2016 Initial Exam 2016-301 Post Exam Comments - Delay Release ML16214A1892016-08-0101 August 2016 Initial Exam 2016-301 Final SRO Written - Delay Release ML15175A4622015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator In-plant JPMs ML15176A5802015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative JPMs ML15176A5702015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator in Plant JPMs ML15176A5432015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15176A5412015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative Documents ML15175A4632015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15175A4582015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15175A4432015-06-22022 June 2015 Initial Exam 2015-301 Draft RO Written Exam ML15175A4492015-06-22022 June 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15175A4292015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrave Documents ML15223B3212015-05-21021 May 2015 Initial Exam 2011-301 Draft Simulator Scenarios ML15105A2842015-04-0909 April 2015 Initial Exam 2015-301 Final RO Written Exam ML14344A3712014-12-0808 December 2014 Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 IR 05000321/20050002014-12-0808 December 2014 Edwin I. Hatch - Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 ML13324A6022013-11-18018 November 2013 Initial Exam 2013-301 Final Simulator Scenarios ML13324A5982013-11-18018 November 2013 Initial Exam 2013-301 Final Sim IN-plant JPMs ML13324A2102013-11-18018 November 2013 Initial Exam 2013-301 Draft Administrative Documents ML13324A2282013-11-18018 November 2013 Initial Exam 2013-301 Draft RO Written Exams ML13324A5902013-11-18018 November 2013 Initial Exam 2013-301 Final Administrative JPMs 2024-01-05
[Table view] |
Text
August 5, 2004 Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner, Jr.
Vice President P. O. Box 1295 Birmingham, AL 35201-1295
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - EDWIN I. HATCH NUCLEAR PLANT
Dear Mr. Sumner:
In a telephone conversation on August 4, 2004, Mr. Timothy Kolb, Operations Examiner, and Mr. Steve Grantham, Operations Training Superintendent, made arrangements for the NRC to inspect the licensed operator requalification program at the Hatch Nuclear Power Plant. The inspection is planned for the week of September 20, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI Standard 3.5-1985.
In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (one week prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRCs inspection program needs. Mr. Grantham has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
SNC 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Timothy Kolb at (404) 562-4665 or myself at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5
Enclosure:
Materials Request List cc w/encl: (See page 3)
SNC 3 cc w/encl contd:
J. B. Beasley, Jr. Resident Manager Executive Vice President Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution George R. Frederick Senior Engineer - Power Supply General Manager, Plant Hatch Municipal Electric Authority Southern Nuclear Operating Company, Inc. of Georgia Electronic Mail Distribution Electronic Mail Distribution Raymond D. Baker Reece McAlister Manager Licensing - Hatch Executive Secretary Southern Nuclear Operating Company, Inc. Georgia Public Service Commission Electronic Mail Distribution 244 Washington Street, SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders John C. Lewis Electronic Mail Distribution Training Manager E. I. Hatch Nuclear Plant Laurence Bergen U. S. Highway 1 North Oglethorpe Power Corporatioln P. O. Box 2010 Electronic Mail Distribution Baxley, GA 31513 Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse Baxley, GA 31513
SNC 4 Distribution w/encl:
C. Gratton, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA By J. Munday for/
NAME M Bates:pmd T Kolb MErnstes BBonser DATE 8/ 5 /2004 8/ 5 /2004 8/ 5 /2004 8/ 5 /2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML042180350.wpd
Materials Request List The items listed below are being requested per telephone conversation on August 4, 2004, to support the upcoming IP-71111.11 B inspection in September 2004 at Hatch Nuclear Power Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by September 13, 2004. Please have the items listed in paragraph "B" ready for our review upon arrival on September 20, 2004.
A. In-office inspection material:
- 1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
- 2. A copy of the last biennial requal written examination. (2RO/SRO exams)
- 3. List of personnel scheduled for requal testing the week of 09/22/03.
- 4. Copies of simulator scenarios for this exam.
- 5. Program evaluation for the previous 2 years training cycle (This could also be any Self Assessments performed during the previous 2 years).
- 6. A list of all personnel that reactivated their licenses since the last requal inspection.
- 7. Simulator:
List of all open simulator discrepancies (DRs).
Copy of the Simulator Management and Configuration Procedures.
List of all closed simulator DRs for last 12 months.
List of Simulator Performance tests.
B. On-site inspection material:
- 1. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
- 2. All training feedback forms since the last requal inspection.
- 3. All remedial training packages since the last requal inspection.
- 4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.
Enclosure
2
- 5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
- 6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
- 7. All Medical Exam Records with a copy of the individuals licence available. A list for review will be presented during the inspection week.
- 8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
- 9. Copy of an Organizational Chart for the training department including the simulator group.
- 10. Complete list of all licensed individuals complete with license restrictions.
- 11. Security procedures for the simulator.
Enclosure