Summary of Meeting with Nuclear Energy Institute Regarding Interim Safety Assessments Concerning Licensees Plant-specific Sump Evaluations
ML042180294
Person / Time
Issue date: 08/05/2004
From: Marshall M
NRC/NRR/DLPM/LPD2
To:
Nuclear Energy Institute
Marshall M NRR/DLPM 415-2734
References
+KBR1SISP20050504, TAC MA6454
Download: ML042180294 (4)


Text

August 5, 2004 STAKEHOLDERS:

Nuclear Energy Institute, Westinghouse Owners Group, and Members of the Public ISSUE:

Generic Safety Issue 191, PWR [Pressurized-Water Reactor] Sump Performance

SUBJECT:

SUMMARY

OF MAY 19, 2004, MEETING WITH NUCLEAR ENERGY INSTITUTE REGARDING INTERIM SAFETY ASSESSMENTS CONCERNING LICENSEES PLANT-SPECIFIC SUMP EVALUATIONS (TAC NO. MA6454)

On May 19, 2004, a Category 2 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Nuclear Energy Institute (NEI) at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for NEI to inform the NRC staff of its proposal for interim safety assessments for licensees that complete a plant-specific evaluation of sump performance. A list of attendees is provided as an Attachment. Neither NEI representatives nor the NRC staff used handouts or other presentation aids during the meeting.

The original purpose of the meeting was for NEI to inform the NRC staff of its planned development of a proposal for interim safety assessments for licensees that complete a plant-specific evaluation of sump performance and discover a nonconformance. However, NEI did not present any such proposal. Instead, NEI asked the NRC staff several questions about the implementation of the proposed Generic Letter (GL) 2004-xx, "Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors," which was issued for public comment. Many of the questions concerned: (1) time needed to implement the actions necessary to respond to the GL, (2) NRC review and inspection of boiling-water reactors resolution of strainer blockage issue, (3) regulatory basis for the GL, (4) whether the GL constituted a backfit, and (5) applicability of PWRs licensing bases. Since the meeting, many of the questions raised by the NEI representatives have been submitted to the NRC by industry representatives as comments on the proposed GL, prior to the end of the public comment period of June 1, 2004, for the GL.

Members of the public were in attendance. Three Public Meeting Feedback forms were received. Comments received included the following: (1) the noticed meeting purpose was not addressed, (2) meeting was similar to a meeting held earlier in the day on the proposed GL, and (3) the availability of a telephone conference line was not publicized. These have been forwarded to the NRR Senior Communications Analyst who will forward them to the Office of the Executive Director for Operations.

2 Please direct any inquiries to me, at 301-425-2734, or mxm2@nrc.gov.

/RA/

Michael L. Marshall, Jr., Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

List of Attendees cc w/atts:

Anthony R. Pietrangelo, Senior Director Risk Regulation Nuclear Generation Nuclear Energy Institute 1776 I Street, NW Suite 400 Washington, DC 20006-3708 Elliot Rosenfeld State of New Jersey Bureau of Nuclear Engineering 33 Arctic Parkway Post Office Box 415 Trenton, New Jersey 08625-0415

2 Please direct any inquiries to Michael L. Marshall, Jr., at 301-425-2734, or mxm2@nrc.gov.

/RA/

Michael L. Marshall, Jr., Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

List of Attendees cc w/atts:

Anthony R. Pietrangelo, Senior Director Risk Regulation Nuclear Generation Nuclear Energy Institute 1776 I Street, NW Suite 400 Washington, DC 20006-3708 Elliot Rosenfeld State of New Jersey Bureau of Nuclear Engineering 33 Arctic Parkway Post Office Box 415 Trenton, New Jersey 08625-0415 DISTRIBUTION:

PUBLIC RArchitzel EMerschoff PDII-2 R/F BPJain JArroyo RidsNrrPM RidsNrrDlpm MMayfield RCaruso RidsOgcRp JBoska JJolicoeur RidsAcrsAcnwMailCenter JHannon JZimmerman RidsNrrOd (JDyer/RBorchardt)

MKowal CJackson RidsNrrDlpm (LMarsh)

WKemper RJasinki RidsNrrDlpmLpdii (EHackett)

AHsia RidsRgn1MailCenter RidsNrrDlpmLpdii-2 (MMarshall)

JBeall RidsRgn2MailCenter RidsNrrLABClayton RidsOpaMail (SBurnell)

RidsRgn3MailCenter TMensah (Comm. Analyst)

DSolorio RidsRgn4MailCenter RHogan (EDO)

TYChang ALarretta RidsEdoMailCenter (LReyes)

RidsNrrDssa (SBlack/MJohnson)

DCullison RElliott ADAMS Accession No.: ML042180294 NRC-001 OFFICE PDII-2/SC PDII-2/LA PDII-2/BC NAME MMarshall BClayton EHackett DATE 8/3/04 8/3/04 8/5/04

3 OFFICIAL RECORD COPY

ATTACHMENT NEI/NRC GSI-191 Meeting May 19, 2004 List of Attendees Name Marcus Dinglor Chuck Feist Gretachew Tesfaye Addison Ricker A. K. Singh John Walker Aaron Smith John Lamb Dave Cullison Jose Arroyo Rob Elliott Angie Larretta Michael Johnson Pedro Salas Tim Andreychek Kazvhiki Kishisku Gordon Hurt Ralph Architzel Bill Kemper Steven Doltey Altheia Wyche Organization WCHDC TXU Energy CEG Proto-Power Sargent & Lundy Framatome ANP Enercon Services NRC NRC NRC NRC NRC NRC TVA Westinghouse JAPC PCI NRC NRC McGraw Hill SERCH Licensing/Bechtel Name Mike Schoppman Johy Meyer Mark Kostelnik Andre Drake John Boska Paul Willoughby Rob Choromokos Bill Reckley Ralph Caruso Wes McGoun Don Eggett David Solorio Tony Pietrangelo John Butler Steven Winter William Rinkals Greg Quitoriano Mark Kowal Dave Lochbaum George Graney Russ Oakley Michael Marshall Organization NEI TXU Power CEG Constellation Energy NRC Dominion Resources Alion Science NRC NRC Progress Energy AES Corp.

NRC NEI NEI NMC Westinghouse PG&E NRC UCS MPR Duke Energy NRC