CPSES-200401767, Submittal of Unit 1 Tenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1986 Edition of ASME Code Section XI, No Addenda, Interval Start Date - August 13, 2000, Second Interval.)

From kanterella
(Redirected from ML042180202)
Jump to navigation Jump to search
Submittal of Unit 1 Tenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1986 Edition of ASME Code Section XI, No Addenda, Interval Start Date - August 13, 2000, Second Interval.)
ML042180202
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/26/2004
From: Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200401767, IWA-6230, TXX-04130
Download: ML042180202 (95)


Text

{{#Wiki_filter:Qt9VAVT'-- "V44001-7 TXU Power TXU Power Comanche Peak Steam Electric Station P. O. Box 1002 (E01) Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com Mike Blevins Senior Vice President & Chief Nuclear Officer Ref: 10 CFR 50.55a(g) CPSES-200401767 Log # TXX-04130 July 26, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) DOCKET NO. 50-445 SUBMITTAL OF UNIT I TENTH REFUELING OUTAGE (IRFIO) INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 1: 1986 EDITION OF ASME CODE SECTION XI, NO ADDENDA, INTERVAL START DATE - AUGUST 13, 2000, SECOND INTERVAL) Gentlemen: This letter forwards the Inservice Inspection Summary Report for the tenth refueling outage of CPSES Unit 1. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code, Section XI, paragraph IWA-6230. A copy of this report is also forwarded to Mr. T. Parks in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4. This communication contains no new licensing basis commitments regarding CPSES Unit 1. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peaks Diablo Canyon
  • Palo Verde
  • South Texas Project
  • Wolf Creek

TXX-041 30 Page 2 of 2 If you have any questions or need additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725. Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC, Its General Partner Mike Blevins By: A le Fred W. Madden Regulatory Affairs Manager JCH/jch Enclosure c - B. S. Mallett, Region IV (clo) W. D. Johnson, Region IV (clo) M. C. Thadani, NRR (clo) Resident Inspectors, CPSES (clo) T. Parks, Chief Inspector, TDLR

ENCLOSURE to TXX-04130

1RF10 INSERVICE INSPECTION

SUMMARY

REPORT SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE TXU Power 6322 North FM 56 Glen Rose, Texas 76043 Comanche Peak Steam Electric Station Glen Rose, Texas 76043 Unit 1 Commercial Operating Date August 13, 1990 pl:6 t4 t. )' l P Y+ S i n ns14I-Prepared by: Reviewed by: -7/9/0+? t;/ Approved by:

Table of Contents 1.0 Introduction 1.1 Purpose 1.2 Scope 1.3 Outage, Period and Interval Start and End Dates 1.4 Authorized Nuclear Inservice Inspector 2.0 Summary of Examinations and Tests 2.1 Piping and Components 2.2 Pressure Tests 2.3 Corrosion Monitoring 2.4 Eddy Current Appendix A NIS-1 Owner's Report for Inservice Inspections Appendix B Summary of Examinations Appendix C Relief Requests Appendix D NIS-2 Owner's Report for Repairs or Replacements

IRF10 INSERVICE INSPECTION

SUMMARY

REPORT SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE 1.0 INTRODUCUTON 1.1 PURPOSE The purpose of this summary report is to provide information relating to the inservice inspection (ISI) activities performed during the tenth refueling outage at the Comanche Peak Steam Electric Station (CPSES) Unit 1. This report documents compliance with I 0CFR50.55(a), Technical Specifications, and ASME Section XI, 1986 Edition, no Addenda (the Code), for examinations and tests. This report also documents compliance with the Texas Department of Licensing and Regulation, Boiler Division, Boiler Law & Rules and Regulations. 1.2 SCOPE This summary report addresses those examinations and tests of Code Class 1, 2 and 3 systems as stipulated in the CPSES Unit I - Second Interval - ISI Program Plan, Revision 2 (the Plan). The NIS-1 Form is included in Appendix A. A list of the NIS-2 Forms documenting Code Repairs/Replacement activities that have occurred since issuing the previous NIS-1 Form for lRF09 are contained in Appendix D. The period of time covered for the Code Repairs/Replacement activities is from February 1, 2003 to July 31, 2004. 1.3 OUTAGE, PERIOD AND INTERVAL START AND END DATES This refueling outage was the first outage in the second inspection period of the second inservice inspection interval. The ISI examinations for this Report were performed between March 10, 2004 and June 24, 2004. IRF10 outage ISI exams were performed between March 29,2004 and April 27, 2004. The Inspection Period began in August 2003 and will end in August 2007, after the completion of the twelfth refueling outage. The Interval began on August 13, 2000 and is scheduled to end on or about August 13, 2010. 1.4 AUTHORIZED NUCLEAR INSERVICE INSPECTOR Tests, examinations, repairs and/or replacements were witnessed or verified by Mr. Joe C. Hair, Authorized Nuclear Inservice Inspector for Hartford Steam Boiler-Connecticut (HSB-CT), as indicated by his signature on the examination data sheets. The HSB Regional Office is located at 200 Ashford Center North, Suite 300, Atlanta, Georgia 30338.

2.0

SUMMARY

OF EXAMINATIONS AND TESTS 2.1 PIPING AND COMPONENTS Examinations were conducted utilizing volumetric, surface and visual techniques in accordance with the requirements of the Code. Appendix B provides a summary of the examinations performed during this outage. Where a particular examination requirement of the Code is determined to be impractical, a request for relief from the requirement is submitted in accordance with the provisions of 1 OCFR50.55a(g)(6)(I). As permitted by Code Case N-460, relief is not requested when a reduction in examination coverage on a Code Class 1 or 2 weld is less than 10%. The relief request number is identified in the remarks column of the summary for each examination area requiring relief. Appendix C is blank as no relief requests were generated as a result of this outage.

a.

Volumetric Examinations Thirteen (13) ultrasonic examinations were completed. There were no unacceptable indications identified.

b.

Surface Examinations Eleven (11) liquid penetrant examinations and four (4) magnetic particle examinations were completed. There were no unacceptable indications identified.

c.

Visual Examinations One hundred four (104) visual examinations of components and their supports were completed. One recordable indication was identified for a loose clamp on a pipe support and was documented as part of the corrective action process in Smart Form (SMF) -2004-001225. Work Order (W.O.) 4-04-154320-00 resolved the condition, with the clamp assembly satisfactorily re-examined. Another recordable indication involved an apparent loose strut on each of two pipe supports and was documented in SMF-2004-001135. It was reviewed and later evaluated as acceptable in the SMF. White residue was identified on 3 of 8 threads at a flange connection and was documented in SMF 2004-001243. The threads were cleaned under W.O. 4-04-1543345-00, with a satisfactory re-examination performed. Non-recordable indications (NRI) are found on pages 10, 22, and 24 of Appendix B. There were no conditions identified that adversely affected the ability of a component or support to perform its intended function. There were no other unacceptable conditions identified.

2.2 PRESSURE TESTS System leakage, functional and inservice tests were performed during the period covered by this report. These tests were conducted under the following pressure test packages: l-AF-2-2-1 I -MS-2-2-la I -RH-2-2-1 I-RC-2-2-l a I -AF-2-2-2 I-MS-2-2-lb 1-RH-2-2-2 I-RC-2-2-lb I -AF-2-2-3 I -MS-2-2-2 I -RH-2-2-3 I -RC-2-2-1 c 1 -AF-2-2-4 1 -RC-2-2-1 d l-AF-2-2-5 1 -RC-2-2-1 e All areas of leakage, if any, were evaluated for corrective measures as described in IWA-5250. SMF2004-001052 documents where small leakage of 15 drops/min was observed at manway cover 2B of Steam Generator, TBX-RCPCSG-02, during the system pressure test of package I -MS-2-2-2. The gasket seating surface of the manway was repaired and a subsequent VT-2 test was performed satisfactorily. All of the other, above identified pressure test packages, have been successfully completed. 2.3 CORROSION MONITORING The Corrosion Monitoring Program examined 116 individual components in accordance with STA-730 during IRFIO. These components consisted of piping elbows, tees, reducers and expanders, straight pipe (primarily downstream of valves and orifices), and nozzles. The following provides a listing of the components per system that were examined during IRFIO: 4 - Component Cooling Water 1 - Condensate 5 - Extraction Steam 44 - Feedwater 43 - Heater Drain 10 - Main Steam 2 - Steam Generator Blowdown 4 - Service Water 3 - Auxiliary Steam Initial screening of the ultrasonic thickness measurement data indicated that there was no evidence of significant wear (Flow Accelerated Corrosion) in any of the components inspected during 1RF 10. The results of the ultrasonic thickness examinations and subsequent analyses of the data wvill be found in the IRFI 0 Corrosion Monitoring Report.

2.4 EDDY CURRENT Tested Scope H ot Leg Cold Leg Expanded Row I - 21 Row 22

  1. of TIG
  2. of Tubes
  3. of Tubes Steam Bobbin TTS Plus TTS Plus Baffle U-Bend U-Bend Sleeves
  4. of Tubes De-plugged Sleeved Generator Scope Point Point Plus Point' Plus Point Plus Point Plugged nd (includes Soe Soe Point Soe cpe cpeReturned those de-Soe Soe Soe Soe SoeScope to Service plugged) 100%

(Except I Row I&2 100% 40% 25% 100% 20% N/A 14 32 78 U-Bend region) 100% (Except 2 Row M&2 100% 20% 25% 100% 20% 213 33 100 180 U-Bend region) 100% (Except 3 Row 1&2 100% 20% 25% 100% 20% 250 47 66 145 U-Bend region) 100% (Except 4 Row I&2 100% 20% 25% 100% 20% 273 43 72 144 U-Bend reg io n )

Appendix A

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTION As required by the Provisions of the ASME Code Rules I - Ownpr TY1 I Pnwpr A199 IMnrth FM '9;R M~In Pn~cbr Taoyn 7AnA', w (Name and Address of Owner)

2.

Plant Comanche Peak Steam Electric Station - Glen Rose. Texas 76043 3. 5. 7. (Name and Address of Plant) Plant Unit No. 1

4. Owner Certificate of Authorization (if required)

N/A Commercial Service Date 8112/90

6. National Board Number for Unit N/A Components Inspected Manufacturer State or Component or Manufacturer or Installer Province No.

National Appurtenance or Installer Serial No. (Comp Tag No.) Board No. Steam Gen. 4 Westinghouse Electric Corp. 2194 TBX-RCPCSG-04 W1 8508 RHR Pump Ingersoll Rand 06746 TBX-RHAPRH-01 227 12" Valve Borg Warner Corp. 14156 1CT-0084 N/A AF Piping System Brown & Root, Inc. N-5 SIN AF-1 -1 616 N/A N/A MS Piping System Brown & Root, Inc. N-5 SIN MS-1-1648 N/A N/A RC Piping System Brown & Root, Inc. N-5 S/N RC-1 -1 645 N/A N/A RHR Piping System Brown & Root, Inc. N-S S/N RH-I -1 632 N/A N/A Si Piping System Brown & Root, Inc. N-5 S/N S1-I -1 644 N/A N/A CS Piping System Brown & Root, Inc. N-5 S/N CS-1-1633 N/A N/A CT Piping System Brown & Root, Inc. N-5 S/N CT-1 -1 642 N/A N/A FW Piping System Brown & Root, Inc. N-5 S/N FW-1 -1 650 N/A N/A CCW Piping System Brown & Root, Inc. N-5 S/N CC-1-1649 N/A N/A SW Piping System Brown & Root, Inc. N-5 S/N SW-1 -1 634 N/A N/A Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 2 in. X 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form. (12/88) This form (E00029) may be obtained from the Order Dept.. ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300.

FORM NIS-1 (Back)

8. Examination Dates 3/10/04 To 6/24/04
9. Inspection Period Identification Auaust 2003 to August 2007
10. Inspection Interval Identification August 2000 to August 2010
11. Applicable Edition of Section Xi 1986 Addenda None
12. Date/Revision of Inspection Plan March 24. 2004 / Revision 2
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan.

Reference CPSES Unit 1 Inservice Inspection Summary Report for the second interval, second period, first outage. All required exams are completed, with four exams rescheduled to 1 RF1 1.

14. Abstract of Results of Examinations and Tests.

Reference CPSES Unit 1 Inservice Inspection Summary Report for the second interval, second period, first outage.

15. Abstract of Corrective Measures.

Reference CPSES Unit 1 Inservice Inspection Summary Report for the second interval, second period, first outage We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section Xi. Certificate of Authorization No. (If applicable) N/A Expiration Date N/A Date July 14 20 04 Signed TXU Power By S. V. Lakdawala Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed b Hartford Steam Boiler of Connecticut have inspected the components described in this Owner's Report during the period _-;J11 3 to 731 1 Z60 , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section Xi. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss any kind arising from or connected with this inspection. J-g e 4* Q'e Commissions Te en )ogs /l Inspector's Signature National board, State, Province, and Endorsements Date I It - a / 1-f 20 QA I

Appendix B

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 1 ASME SEC. XI CATGY ITEM NO G N E N R R 0 I I I M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD REMARLBS

  • -CALIBRATION 8LOCF-PROCEDURE REACTOR COOLANT TBX-RCPCSG-04 012000 TBX-1-3100-4B1-16 SG4 HOTLEG MANWAY BOLTING (4-B1/4-B16)

R154L812RB 012100 TBX-1-3100-4B17-32 SG4 COLDLEG MANWAY BOLTING (4-B17/4-B32) R154L812RB B-G-2 B7.30 B-0-2 B7.30 VT-1 VT-1 TX-ISI-8 TX-ISI-B X X 021800 021900 023900 REACTOR COOLANT 1.5-RC-l-020-2501R-l TBX-1-4107-4 B-J PIPE TO ELBOW B9.40 R1541828RB TBX-1-4107-5 T-J ELBOW TO PIPE B9.40 R1541828RB SAFETY INJECTION I.S-ST-1-025-2SOIR-l TBX-1-4107-FLW 1 B-G-2 FLANGE BOLTING B7.50 R154 822RB SAFETY INJECTION 2-ST-1-059-2501R-1 PT TX-ISI-ll PT TX-ISI-ll X X K VT-i TX-ISI-8 026000 TBX-1-4108-FLG 1 FLANGE BOLTING R154 82ORB B-G-2 VT-1 B7.50 TX-ISI-8 X X RI-WHITE RESIDUE IDENTIFIED ON THREADS OF 3 OF 8 STUDS AT FLANGE JOINT. REFERENCE SMF-2004-001243. THREADS OF THE AFFECTED STUDS WERE CLEANED UNDER WO 4-04-154345-00. RE-EXAMINED. AND DETERMINED TO BE ACCEPTABLE.

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 2 ASME SEC. XI CATGY EXAM ITEM NO METHOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION G N E N R R 0 REMARKS I I I M

  • "CALIBRATION BLOCK--

PROCEDURE 026600 TBX-1-4109-6 PIPE TO ELBOW R154I813R3 B-J B9.40 PT TX-ISI-11 X CHEMICAL & VOLUME CONTROL 2-CS-1-103-2501R-1 029100 TBX-1-4111-FLG 1 FLANGE BOLTING A23 830RB B-G-2 B7.50 VT-i TX-ISI-8 X SAFETY INJECTION 1.S-ST-1-026-2501R-1 041400 TBX-1-4205-FLG 1 FLANGE BOLTING R1S4B831R3 B-G-2 B7.50 VT-1 TX-ISI-s X REACTOR CCO-ANT 3-RC-1-111-2501R-1 086200 TBX-1-4502-12 VALVE TO PIPE R161E907R9 B-J UT TX-ISI-302 B9.21 PT TX-ISI-11 PT DONE DURING lRF10. UT DONE DURING X lRF09. RISK INFORMED IS1 EXAM, CAT R1.10 TBX-3/PDI-03-' REACTOR COOLAINT _3-RC-1-146-2SOlR-1 087800 TBX-1-4502-28 PIPE TO VALVE R161E907RB B-J UT B9.21 PT TX-ISI-302 TX-ISI-1l PT DONE DURING IRF10. UT DONE DURING X lRF09. RISK INFORMED ISI EXAM, CAT R1.10.

  • -TBX-3/PDI-03-^

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 3 ASME SEC. Xi CATGY ITEM NO 0 N E N R R 0 1 1 1 M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD REMARKS '^CALIBRATION BLOCK-PROCEDURE SAFETY INJECTION 3-ST-1-303-2501R-1 097700 TBX-1-4600-4 PIPE TO ELBOW R154A823RB B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM.

    • PDI-03--

097800 TBX-1-4600-S ELBOW TO PIPE R154A823RB B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM.

  • -PDI-03--

SAFETY INJECTION 3-S5-1-033-2SO1R-1 098000 TSX-1-4600-7 REDUCER TO PIPE R154D819RB B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM. ^-PDI-03-- 098200 TBX-1-4600-9 TEE TO PIPZ R154D819R3 B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM. PDI-03-- 098300 TBX-1-4600-10 PIPE TO TEE R154D819R3 B-3 B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM. '-PDI-03-- SAFETY lNJECTION 3-S-1-339-2501R-1 098700 TBX-1-4600-14 PIPE TO ELBOW R154D822R8 B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM. '-PDI DATE: 04/28/04 COMANCHE PEAR UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 4 ASME SEC. Xi CATOY EXAM ITEM NO METHOD G N E N R R O REMARKS I I I M -*CALIBRTION BLOCK'

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PROCEDURE SArETY INJECTION 3-ST-1-339-2501R-1 098800 TBX-1-4600-IS ELBOW TO PIPE R1S4D822R.D B-J B9.21 UT TX-ISI-302 X RISK INFORMED ISI EXAM. '-PDI-03'

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 5 ASME SEC. XI CATSY EXAM ITEM NO METHOD G N E R 0 I M

SUMMARY

EXAMINATION AREA NUMEER IDENTIFICATION N R PROCEDURE I I REMARKS ^-CALIBRATION BLOCX*K SAFETY INJECTION 16-ST-1-076-601R-2 177600 TBX-2-2500-42 PIPE TO ELBOW R65 788SB C-F-1 UT CS.11 TX-ISI-302 X RISK INFORMED ISI EXAM.

  • -TBX-1S, PDI-03--

SAFETY INJECTION 16-SI-1-075-601R-2 182300 TBX-2-2501-38 ELBOW TO PIPE R66 7885B C-F-1 CS.11 UT TX-ISI-302 X RISK INFORMED ISI EXAM.

  • -TBX-1S, PDI-03--

1,4700 RESIDUAL MEAT REMOVAL 10-RH-1-015-601R-2 TBX-2-2520-8 C-F-1 UT PIPE TO TEE CS.ll R62F 789SB RESIDUAL HEAT REMOVAL 8-RH-1-020-601R-2 TX-ISI-302 X RISK INFORMED ISI EXAM.

    • TBX-10, PDI-04--

186100 TBX-2-2520-22 ELBOW TO PIPE R62H 789SB C-F-1 UT CS.11 TX-ISI-302 X RISK INFORMED ISI EXAM.

  • -TBX-7, PDI-03-*

186200 TBX-2-2520-23 PIPE TO TEE R62H 7875B C-F-1 UT C5.11 TX-ISI-302 X RISK INFORMED ISI EXAM.

  • -TBX-7, PDI-03--

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 6 ASME SEC. XI CATGY EXAM ITEM NO METHOD G N E N R R II N1

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REMARKS _CALIBRATION BLOCK" PROCEDURE RESIDUAL HEAT REMOVAL 8-RH-1-009-601R-2 187200 TBX-2-2S20-33 PIPE TO REDUCER R62H 787SB C-F-1 UT TX-ISI-302 CS.11 X RISK INFORMED ISI EXAM. '-TBX-7, PDI-03^- CONTAINMENT SPRAY 12-CT-1-005-1S1R-2 323160 TBX-2-2576-lCT-084 VALVE BODY WELD R54 787SB C-G C6.20 PT TX-ISI-ll X RESIDUAL HEAT REMOVAL TBX-RHAPRH-01 400000 TBX-2-3100-1-lWS RRR PUMP 21 WELDED SUPPORT R53 77353 400010 TBX-2-3100-1-2WS RHR PUMP 21 WELDED SUPPORT R53 773S3 400020 TEX-2-3100-1-3WS RRR PUMP 31 WELDED SUPPORT R53 773SB C-C C3.30 C-C C3.30 PT TX-ISI-ll PT TX-ISI-ll X X X C-C C3.30 TX-ISI-ll

DATE: 04/28/04 COMANCHE PEAX UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS I COMPLETED COMPONENTS PAGE: 7 ASME SEC. XI CATGY EXAM ITEM NO METHOD a N E N RR 0 REMARKS I I I M I -CALIBRATION BLOCK

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PROCEDURE REACTOR COOLANT 12-RC-1-007-2501R-1 655400 TBX-1-4101-H2 RC-1-007-001-C41R R1541819RB F-C VT-3 NOTE 1 TX-ISIS-8 X REACTOR COOLANT 6-RC-1-OOS-2501R-1 655600 TBX-1-4104-H1 RC-1-008-002-C41S R1541826RB F-C VT-3 NOTE 1 TX-ISSS-X RESIDUAL HEAT REMOVAL 12-RH-1-001-2501R-1 670100 TBX-1-4101-H3 F-C RH-1-001-004-C41S NOTE R23 817RD SAFETY SNJECTION 3-ST-1-033-2501R-1 1 VT-3 TX-ISi-8 X 678100 TBX-1-4600-H4 SI-1-033-001-C41R R154B819RB F-C VT-3 NOTE 1 TX-ISI-s X 678200 TBX-1-4600-H6 SI-1-033-003-C41K R154D819RB 678400 TBX-1-4600-H3 SI-1-033-005-C415 R31 819RB F-C NOTE 1 VT-3 TX-IS I - TX -IS I-X X F-C VT-3 NOTE 1

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERViCE INSPECTION ShUMMARY SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 8 ASME SEC. XI

SUMMARY

EXAMINATION AREA CATGY NUMBER IDENTIFICATION ITEM NO EXAM METHOD G N E N R R 0 I 1 I M PROCEDURE REMARKS -CALIBRATION BLOCK" SAFETY INJECTION 10-S-1-179-2501R-1 683800 TBX-1-4102-H3 SI-1-179-008-C415 R23 828RB F-C NOTE 1 VT-3 TX-ISI-8 X 683850 TBX-1-4102-H3 SI-1-179-008-C41S R23 828RB B-K-1 B1O.10 PT TX-ISI-ll X SAFETY IN.TECTION 3-SI-1-339-2501R-1 689400 TBX-1-46C0-H7 SI-1-339-301-C41A R154D822R3 F-B VT-3 NOTE 1 TX-ISI-8 X REACTOR C^CLANT TBX-RCPCSG-04 690600 TBX-1-3100-4CS1 TBX-RCESSG-04-S1 A29 812R3 690625 TBX-1-310C-4CS2 TBX-RCESSG-04-S2 A29 812R3 690650 TBX-1-310C-4CS3 TBX-RCESSG-04-S3 A29 812RB 690675 TBX-1-3100-4CS4 TBX-RCESSG-04-S4 A29 812RB F-C NOTE 1 F-C NOTE 1 VT-3 TX-ISI-8 TX-1SI-8 TX-ISI-8 TX-ISI-8 X X X F-C NOTE 1 VT-3 VT-3 F-C NOTE 1

DATE: 04t28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL. SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 9 ASME SEC. XI CATGY EXAM ITEM NO METHOD G N E N R R 0 2 I 1 M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REMARXS .*CALIBRATION BLOCK-- PROCEDURE REACTOR COOLANT TBX-RCPCSG-04 690700 TBX-1-3100-4LS1 TBX-RCESSG-04-L1 A29 835RB 690725 TBX-1-3100-4LS2 TBX-RCESSG-04-L2 A29 835RB 690750 TBX-1-3100-4LS3 TBX-RCESSG-04-L3 A29 83SRB 690800 TBX-1-3100-4US1 TBX-RCESSG-04-Ul R154L812R2 690820 TBX-1-3100-4US2 TBX-RCESSG-04-U2 R154L812RB 690840 TBX-1-3100-4US3 TBX-RCESSG-04-U3 R154L812RB F-B NOTE 1 F-B NOTE 1 F-B NOTE 1 F-B NOTE 1 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 TX-IS1-S TX-155-8 TX-IS1-8 TX-151-8 TX-ISI-8 TX-ISI-8 TX-ISI-8 F-B NOTE 1 II F-B NOTE 1 690880 TBX-1-3100-4SN1 TBX-RCESHS-17 R154L812RB F-C NOTE 1

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTiON

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 10 SUMMlARY NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC. XI CATSY ITEM NO EXAM METHOD 0 N E N RR 0 I I I REMARXS 'CALIBRASSON BLOCX-- PROCEDURE 690890 REACTOR COOLANT T8X-RCPCSG-04 TBX-1-3100-4SN2 TBX-RCESHS-19 R1S4L812RB REACTOR COOLANT TBX-RCPCPC-04 F-C VT-3 NOTE 1 TX-ISI-s X X NRI-WORK ORDER 4-04-154316-00 WRITTEN TO REPLACE THE DENTED HYDRAULIC TUBING. 691500 TBX-1-5100-4P1 TBX-RCESPC-04-P1 A29 812RB 691530 TBX-1-5100-4P2 TBX-RCESPC-04-P2 A29 812R3 i .1560 TBX-1-5100-4P3 TBX-RCESPC-04-P3 A29 812RB 691600 TBX-1-5100-4T1 TBX-RCESPC-04-T1 A29 830RB 691630 TBX-1-5100-4T2 TBX-RCESPC-04-T2 A29 83ORB 691660 TBX-1-5100-4T3 TBX-RCESPC-04-T3 A29 830R3 F-C NOTE 1 F-C NOTE 1 VT-3 VT-3 VT-3 VT-3 TX-ISI-8 TX-ISI-s TX-ISI-8 TX-ISI-8 x X X F-C NOTE 1 F-C NOTE 1 I F-C NOTE 1 F-C NOTE 1 VT-3 VT-3 TX-ISI-8 TX-ISI-8 x X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION SUMMAiY SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 1 COMPLETED COMPONENTS PAGE: 11 ASME SEC. XI CATGY EXAM ITEM NO METHOD G N E N R R 0 REMARKS I I I M

  • CALIBRATION BLOCK--

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PROCEDURE SAFETY INJECTION 3-ST-1-303-2501R-1 692700 TBX-1-4600-MR9 CP1-SISSMR-09 R154B823RB F-B VT-3 NOTE 1 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 12 ASE SEC. Xi CATGY ITEM NO 0 N E N RR 0 1 1 1

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD REMARXS '-CALlBRATlON BLOCX-- PROCEDURE 704800 705200 CONTAINMENT SPRAY 16-CT-1-004-151R-2 TBX-2-2577-H2 F-C CT-1-004-012-S32S NOTE 1 R66 803SB CONTAINMENT SPRAY 12-CT-1-005-ISlR-2 TBX-2-2576-H1 F-C CT-1-005-004-S22K NOTE 1 R67 787SB CONTAINMENT SPRAY 12-CT-1-006-lS1R-2 TX-ISI-8 x X VT-3 TX-ISI-8 705700 TBX-2-2576-H10 CT-1-006-003-S22K R67 787SB 706000 TBX-2-2576-H13 CT-1-006-701-S22R R54 780SB FEEDWATER 18-FW-1-020-1303-2 F-C NOTE 1 VT-3 VT-3 TX-ISI-8 TX-1SI-8 x X F-C NOTE 1 725800 TBX-2-2401-H2 FW-1-020-700-C42X R154L828R3 F-C NOTE 1 VT-3 TX-ISI-8 X 725850 TBX-2-2401-H2 FW-1-020-700-C42K R154L828RB C-C C3.20 Mr TX-ISI-70 X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 13 ASME SEC. XI CAT7Y ITEM NO

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD G N E N R R 0 REMARKS I I I M "*CALIBRATION BLOCK-' PROCEDURE FEEDWATER 18-FW-1-020-1303-2 726100 TBX-2-2401-H6 FW-1-020-703-CS2K R1S4L>38RB F-C NOTE 1 VT-3 TX-ISI-8 X 726150 T8X-2-2401-Hg FW-1-020-703-CS2K R154L838RB C-C C3.20 MT TX-ISI-70 X FEEDWATER 6-FW-1-098-1303-2 741500 TBX-2-2402-H38 FW-1-098-017-C62S R1SSK869RD F-C NOTE 1 VT-3 TX-ISI-8 X 744550 TBX-2-2402-H38 FW-1-09B -017-C62S R155K869R.S C-C C3.20 Kr TX-ISI-70 X 741600 TBX-2-2402-H34 FW-1-098-700-C62K R1SSK86SRB F-C NOTE 1 VT-3 TX-ISI-8 X X RI-LOOSE BOLT ON PIPE CLAMP. REFERENCE SMF-2004-001255. RETIGHTENED THE LOOSE BOLT UNDER WORK ORDER 4-04-154320-00 AND RE-EXAMINED. 741650 TBX-2-2402-H34 FW-1-098-700-C62K RlSSK865R' C-C C3.20 MT TX-ISI-70 X RESIDUAL HEAT REMOVAL 16-RH-1-007-601R-2 752800 TBX-2-2500-H1S RH-1-007-002-S22S R53 775SB F-C NOTE 1 VT-3 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAX UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 14 ASME SEC. XI CATGY ITEM NO

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD G N E N R R 0 REMARKS I I I M '-CALIBRATION BLOCX PROCEDURE SAFETY INJECTION 4-SI-1-039-1501R-2 764000 TBX-2-2563-H1 SI-1-039-001-S22S R60 786SB 764300 TBX-2-2563-H2 SI-1-039-012-S22R R60 786SB F-C NOTE 1 VT-3 VT-3 TX-ISI-B TX-Isi-s X X F-C NOTE 1 764350 TBX-2-2563-H2 SI-1-039-012-S22R R60 786SB C-C C3.20 PT TX-ISI-ll X T730SO SAFETY INJECTION 16-Si-1-076-601R-2 TBX-2-2500-H18 F-C SI-1-076-002-S22K NOTE 1 R65 788S3 SAFETY INJECTION 16-SS-1-32S-2501R-2 VT-3 TX-ISI-8 X 792700 TBX-2-2501-H18 SI-1-325-001-S32R I R63 803R3 F-C NOTE 1 VT-3 TX-ISI-8 X 792800 TBX-2-2501-H17 SI-1-325-002-S32R R63 803RB F-C VT-3 NOTE 1 TX-ISI-s X RESIDUAL HEAT REMOVAL TBX-RHAPRH-01 794865 TBX-2-3100-lSl RHR PUMP 01 SUPPORT RS3 773SB F-B NOTE 1 VT-3 TX-ISI-8 X EXAMINATION INCLUDES ISl, 1S2, AND 1S3.

DATE: 04/28/04 COMANCHE PEAX UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL. SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 2 COMPLETED COMPONENTS PAGE: 1s ASME SEC. XI CATCY EXAM ITEM NO METHOD G N E N R R REMARKS I I I M "CALIBRATION BLOCK--

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PROCEDURE CONTAINMENT SPRAY CP1-CTAPCS-01 795070 TBX-2-2S76-1PSI CT PUMP 01 SUPPORT RS4 773SB F-B NOTE 1 VT-3 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAM UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 16 ASME SEC. XI

SUMMARY

EXAMINATION AREA CATOY EXAM NUMBER IDENTIFICATION ITEM NO METHOD G N E N R R 0 REMARXS I I I M

  • "CALIBRATION BLOCK*-

PROCEDURE 815100 815150 815700 AUXILARY FEEDWATER 6-AP-1-003-152-3 AF-1-SB-003-Hl F-B AF-1-003-006-S33A NOTE 1 R72 798SB AF-1-SB-003-Hl-WA D-A AF-1-003-006-S33A D1.20 R72 798S3 AUXILARY FEEDWATER 6-AP-1-004-152-3 AF-1-SB-001-H1 F-B AF-1-004-005-533A NOTE 1 R73 799SB AF-I-SB-001-HI-WA D-A AF-1-004-005-S33A D1.20 R73 799SB AUXILARY FEEDWATER 6-AF-1-007-152-3 AF-1-SB-001-H2 F-C AF-1-007-701-S33R NOTE 1 R73 792SB AF-1-SB-.001-H2-WA D-A AF-1-007-701-S33R D1.20 R73 792SB AUXSLARY FEEDWATER 6-AF-1-008-152-3 Vl-3 VT-3 VS-3 VT-3 VT-3 VT-3 TX-ISI -8 TX-ISI-8 TX-ISI-8 TX-Isl-8 TX-ISI-8 Tx-ISI-8 817700 817750 817800 AF-1-SB-003-H2 AF-1-008-001-S33R R72 792SB F-C NOTE 1 VT-3 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND ENTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 17 ASME SEC. XI CATGY ITEM NO

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD G N E N R R 0 REMARKS I I I M '^CALIBRATION BLOCX-- PROCEDURE 817850 820600 820650 AUXILARY FEEDWATER 6-AF-1-008-152-3 AF-1-SB-003-H2-WA D-A AF-1-008-001-S33R D1.20 R72 792SB AUXILARY FEEDWATER 6-AF-1-012-152-3 AF-1-SB-001-H3 F-C AF-1-012-001-533S NOTE 1 R73 795SB AF-1-SB-001-H3-WA D-A AF-1-012-001-533S D1.40 R73 795S3 AUX'ILARY FEEDWATER 6-AF-1-058-152-3 VT-3 VT-3 VT-3 TX-ISI-8 TX-ISI-8 TX-ISI-8 X x x 828400 AF-1-SB-003-H3 F-C VI AF-1-058-001-533R NOTE I R72 801S3 828450 AF-1-SE-003-H3-WA D-A VI AF-1-058-001-533R D1.20 R72 80153 COMPONEN7 COOLING WATER 6-CC-1-007-152-3 ,-3 U-3 TX-ISI-8 TX-151-8 X X 865300 CC-1-AB-046-H1 CC-1-007-031-AS35 R226 843A3 F-C NOTE 1 VT-3 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION SUsMMARY SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 18 ASME SEC. xi CATOY EXAM ITEM NO METHOD G N E N R R 0 1 I1 M SUM4ARY EXAMINATION AREA NUMBER IDENTIFICATION REMARKS ^CALIBRATION B0LCK** PROCEDURE OOYOmN-NT eOnTNrG WT--Rv 6-CC-1-00nn7-152r-3% 865350 CC-1-AB-046-Hl-WA CC-1-007-031-AS3S PR226 843A3 D-A D1.40 VT-3 TX-ISI-8 X rnMDnNow-onnsTNn wT.r t.rr.. _nl 1_152_ 872500 CC-1-AB-045-Hl CC-1-011-032-A63R R241 866AB 872650 CC-1-A8-045-Hl-WA CC-1-011-032-A63R R241 866AB 728 DO CC-1-AB-045-H2 CC-1-011-034-A63K R241 867AB 872850 CC-1-AB-045-H2-WA CC-1-011-034-A63K R241 867A8 873000 CC-1-AB-045-H3 CC-1-011-036-A63R R241 869A3 873050 CC-1-AB-045-H3-WA CC-1-011-036-A63R R241 869A3 F-C NOTE 1 D-A D1.20 VT-3 VT-3 VT-3 VT-3 TX-151-e TX-151-TX-ISI-8 TX-ISI-8 X X x X F-C NOTE 1 D-A D1.3o F-C NOTE 1 VT-3 VT-3 TX-151-TX-ISI-8 X X D-A D1.20

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 19 ASME SEC. Xi

SUMMARY

EXAMINATION AREA CATGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD C N E N R R 0 1 I 1 M PROCEDURE REMARKS 'CALIBRATION BLOCK' COMPONENT COOLING WATER 24-CC-1-043-152-3 887000 CC-1-AB-043-Hl CC-1-043-024-A33K R180 800AB 887050 CC-1-A8-043-Hl-WA CC-1-043-024-A33K R180 800AB 887200 CC-1-A'-043-H2 CC-1-043-026-A33R R180 800AB 887250 CC-1-AB-043-H2-WA CC-1-043-026-A33R R180 800AB 887500 CC-1-AB-043-H3 CC-1-043-030-A33K R180 800AB 887550 CC-1-AB-043-H3-WA CC-1-043-030-A33K R180 800A8 887570 CC-1-A8-043-H5 CC-1-043-700-A33R R180 800AB F-C NOTE 1 D-A D1.30 F-C NOTE 1 D-A D1.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 TX-ISI-6 TX-IS I-s TX-ISI-8 TX-ISI-8 TX-ISI-s TX-IS I-s TX-ISI-8 F-C NOTE 1 D-A D1.30 F-C NOTE 1

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 20 ASME SEC. XI CATGY EXAM ITEM NO METHOD G N E N R R 0 I T I M

SUMMARY

EXAMINATION AREA NUMEER IDENTIFICATION REMARKS

  • CALIBRATION BLOCK--

PROCEDURE COMPONENT COOLING WATER 24-CC-1-043-152-3 887580 CC-1-AB-043-HS-WA CC-1-043-700-A33R R180 800A3 D-A D1.20 VT-3 TX-TSI-8 X COMPONENT COOLING WATER 18-CC-1-066-152-3 894000 CC-1-A3-043-H4 CC-1-066-001-A33R R180 803AS F-C NOTE 1 VT-3 TX-SI-S8 X COMPONENT COOLTNG WATER 6-CC-1-106-152-3 899800 CC-1-A3-044-Hl CC-1-106-001-A43R R207E820A3 F-C VT-3 NOTE 1 TX-IST-8 X RI-ONE OF THE DUAL STRT.S FOR THE SUPPORT APPEARS TO BE LOOSE. REFERENCE SMF-2004-001135. EVALUATED AS ACCEPTABLE. NO FURTHER ACTION REQUIRED. 899850 CC-1-AB-044-Hl-WA D-A VT-CC-1-106-001-A43R D1.20 R207E820A3 COMPONENS COOLING WASER 16-CC-1-110-152-3 .3 TX-ISI-8 X 901000 CC-1-AB-040-Hl CC-1-110-002-A43R R207E825A3 901400 CC-1-AS-040-H2 CC-1-110-007-A435 R207E826A3 F-C NOT E 1 VT-3 VT-3 TX-ISI-8 TX-ISI-8 X X F-C NOTE 1

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 21 ASME SEC. XI

SUMMARY

EXAMINATION AREA CATCY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE G N E R 0 I M N R 2 I REMARKS -^CALIBRATION BLOCK-- COMPONENT COOLING WATER 6-CC-1-120-152-3 903500 CC-1-AB-044-H2 CC-1-120-001-A43R R207E818AB F-B NOTE 1 VT-3 VT-3 TX-ISI-8 TX-ISI-8 X X 903550 CC-1-AB-044-H2-WA CC-1-120-001-A43R R207E818AB D-A D1.20 COMPONENT COOLING WATER 6-CC-1-123-152-3 903700 CC-1-AB-044-H3 CC-1-123-001-A43R R207E820AB F-C NOTE 1 VT-3 VT-3 TX-ISI-s TX-ISI-s X RI-ONE OF THE DUAL STRUTS FOR THE SUPPORT APPEARS TO BE LOOSE. REFERENCE SMF-2004-001135. EVALUATED AS ACCEPTABLE. NO FURTHER ACTION REQUIRED. 903750 CC-1-AB-044-H3-WA CC-1-123-001-A43R R207E820AB D-A D1.20 X COMPONENT COOLING WATER 16-CC-1-1S8-152-3 911800 CC-1-AB-041-Hl CC-1-158-705-A43K R207E823AB 911850 CC-1-AB-041-Hl-WA CC-1-158-705-A43K R207E823A3 F-C NOTE 1 VT-3 VT-3 TX-ISI-8 TX-ISI-8 X X D-A D1.30

DATE: 04/28/04 COMANCHE PEAX UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL. SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 22 ASME SEC. Xi CATGY EXAM ITEM NO METHOD G N E N R R 0 1 1 1 M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REMARKS

  • .CALIBRATION BLOCX-PROCEDURE COMPONENT COOLING WATER 6-CC-1-948-152-3 919100 CC-1-AB-046-H2 CC-1-948-700-A73R R245 883AB 919150 CC-1-A8-046-H2-WA CC-1-948-700-A73R R245 883AB F-C NOTE 1 VT-3 VT-3 TX -IS I-e TX-IS I -8 x

x D-A D1.20 COMPONENT COOLING WATER 6-CC-1-949-1S2-3 919600 CC-1-AO-045-H4 CC-1-949-704-A73R R245 882A3 5 19650 CC-1-AB-045-H4-WA CC-1-949-704-A73R R245 882AB F-C NOTE 1 VT-3 VT-3 TX-151-8 TX-ISI-8 X X D-A D1.20 SERVICE WATER 30-SW-1-012-150-3 932700 SW-1-AB-002-H1 SW-1-012-026-F33K RSWT 793AB F-C NOTE 1 VT-3 VT-3 TX-ISI-8 TX-ISI-B X NRI-UNA9LE TO READ SNUBBER SETTINGS. PIN TO PIN MEASUREMENTS; RIGHT-30-1/4-. LEFT-30-1/8-. 932750 SW-1-AB-002-Hl-WA SW-1-012-026-F33K RSWT 793A3 D-A D1.30 x SERVICE WATER 24-SW-1-013-150-3 933400 SW-1-AB-002-H2 SW-1-013-005-A33X R175 788AL F-C VT-3 NOTE 1 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAX UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD, FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PACE: 23 ASME SEC. XI CATGY ITEM NO G N E N R R 0 I I I M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD REMARXS

  • CALSBRATION BLOCK-PROCEDURE SERVICE WATER 24-SW-1-013-150-3 933450 SW-1-AB-002-H2-WA SW-1-013-005-A33K R175 788AB D-A D1.30 V`T-3 VT-3 TX-ISI-B TX-ISI-B X

x 933470 SW-1-AB-002-H44 SW-1-013-701-A33S R1'75 788AB F-C NOTE 1 SERVICE WATER 10-SW-1-129-150-3 941000 SW-1-AB-003-Hl SW-1-129-001-A33R R175 804AB 5 +1050 SW-1-AB-003-Hl-WA SW-1-129-001-A33R R207EB04AB F-C NOTE 1 D-A D1.20 F-C NOTE 1 VT-3 VT-3 VT-3 VT-3 TX-ISI-B TX-ISI-8 TX-ISI-8 TX-ISI-8 x X X X 941700 SW-1-AB-005-Hl SW-1-129-045-A43R R207EB20AB 941750 SW-1-AB-005-Hl-WA SW-1-129-045-A43R R207EB2OAB D-A D1.20 SERVICE WATER 10-SW-1-132-150-3 953200 SW-1-AB-002-H3 SW-1-132-723-A33R R175 800A3 F-C VT-3 NOTE 1 TX-ISI-8 X

DATE: 04/28/04 COMANCHE PEAK UNIT 1 INSERVICE INSPECTION

SUMMARY

SECOND INTERVAL, SECOND PERIOD. FIRST OUTAGE (04RF) CLASS 3 COMPLETED COMPONENTS PAGE: 24 ASME SEC. Xi CATSY ITEM NO G N E N R R 0 1 1 I M

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION EXAM METHOD REMARKS -CALIBRATION BLOCK" PROCEDURE SERVICE WATER 20-SW-1-132-1SO-3 953250 SW-1-AB-002-H3-WA SW-1-132-723-A33R R175 800AB D-A D1.20 VT-3 TX-ISI-8 X COMPONENT COOLING WATER CPl-CCAHHX-02 962275 CC-1-AB-010-2HXSl CCW HX SUPPORT R175 790AB F-B NOTE 1 VT-3 TX-ISI-8 X NR1-SMALL GAPS IDENTIFIED AT FOUR LOCATIONS BETWEEN THE SADDLE AND PEDESTAL AFTER REGROUTING PER WORK ORDER 4-03-147941-00. EVALUATED AS ACCEPTABLE IN EVAL 02 TO SMF-2002-00361S.

ISI - IRF10 The following changes were made to the schedule for the ISI exams and will be reflected in revision 3 of the Unit I ISI Program Plan for the second interval. Summary No. Identification Description Code Cat. Change 011700 TBX-1-3100-4-1 SG4 Head to Tubesheet Weld B-B Reschedule to IRFII 011800 TBX-1-3100-4A SG4 Inlet Nozzle InnerRadius B-D Reschedule to IRFI 011900 TBX-1-3 1004B SG4 Outlet Nozzle Inner Radius B-D Reschedule to lRFl l 063500 TBX-1-44004 Reducing Elbow to SG Nozzle B-F Reschedule to IRFI I I RI-ISI

Appendix C

There were no specific relief requests generated as a result of I RFI O.

Appendix D

Comanche Peak Steam Electr-ic Station NIS-2 List for Unit 1 February 1CB04-001 1CC04-001 ICC04-002 ICC04-003 ICC04-004 1CC04-005 1CC04-006 1CC04-007 ICC04-008 1CS04-001 1CS04-002 1CS04-003 1CS04-004 1CS04-005 iRFlO 1, 2003 to July 1CS04-006 1CT04-001 1FW04-001 1FW04-002 1MS04-001 1MS04-002 lMS04-003 IRC04-001 IRC04-002 1RC04-003 1RC04-004 1RC04-005 IRC04-006 IRC04-007 31, 2004 1RC04-008 1RC04-009 lRC04-0010 lRC04-011 lSI-04-001 15W04-001 15W04-002 1sWO4-003 1sWO4-004 15W04-005 lVA04-001 lVA04-002 1VA04-003 NIS2LIST.WK4

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56. 5 Miles North of Glen Rose. Texas 76043 Date: 06/24/04 Sheet 1 of 1 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CBO4-0O1 Repair Organization P.O. No., Job No., etc.: TXU identification of System: CB Type Code Symbol Stamp: N/A N-5 No.: CB-1-1000 Authorization No.: N/A Applicable Construction Code: N/A Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: CONT AIRLOCK CP1 -MEMEPA-01 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: N/A Replacement Yes 4-02-140274-00 CB&I Company N/A Applicable Nlanuracturer's Data Reports to he attached: 2 Weld support to door, safeguard side Tests Conducted: Ilydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg r) as applicable: N/A CERTIFICA TE OF COMllPLIANCE JWe certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASASE Code, Section YI. Repair or Replacement Type Code Symbol Stamp: NA Signed EngineerinigProgramsManager Date Ac- . G od Certifncate ofAuthorization Number: NA m.,ineA.r or Orler's designee, dyle F-rpianDt:N 5 9 s-/ I"-'eT-CERTIFICA TE OF INSER VICE INSPECTION ExpirationDate: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXYAS and employed by lIAR TFORD STE,1it BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owvner s Report during the period of Februaryl, 2003 to Juy 31, 2004 atd state tait to tie best of mn knowledge auid belief tte Owner has performted eraminations atd taken corrective measures described in this Owner's Report in accordance with the requirements of the ASASE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kkin~ddrivingjrom or connected with this inspection. Commissions Texas 1080 Date Inspector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: ICC04-001 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CC Type Code Symbol Stamp: NIA N-5 No.: CC-1-1649 Authorization No.: N/A Applicable Construction Code: 1974 Ed., W74 Add. Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: VALVE National Board No.: N/A Year Built: 1977 Component Identification: 1CC-0049 Repaired / Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Posi-Seal Authorizing Document: 4-03-151796-00 Serial Number: 11861-13G Remarks: ASME Code Class: 3 Applicable Manuracturer's Data Reports to be attached: Description of work: Replaced bonnet bolting Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMUPLIANCE We certify' that the statements nrade in the report are correct and this Replacement conforms to the rules of the ASHME Code, Section YI. Repair or Replacement Type Code Symbol Stamp: NA Signed Engineering Programs Manager Date o c:Z s.- o Certifcate of Authtorization Number: NA !neror Owter's designee, ralt ExpirationDate: NA v L '*A-~-( ~ CERTIFICATE OF INSER VICE INSPECTION 1 the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEYAS and employed by 11ARTFORD STEA'Mf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of __er 1, 2003 to July 31, 2004 , and state that to the best of my knowledge and belief the Owner has perforated examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASAIE Code, Section YX. By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of anyar kind arn *ngfront or connected with this inspection. Commissions Texas 1080 Date _/,Z fd Inspector's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A Appili Expiration date: NIA Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Date: 06/24/04 Sheet 1 of I Unit: I NIS-2 Report number: 1CC04-002 Identification of System: CC N-5 No.: CC-1-1649 cable Construction Code: 1974 Ed., W74 Add. Code Case(s): N/A Code Cases: NIA Name of Component: Component Identification: Other Identification: Name of Manufacturer: VALVE National Board No.: N/A Year Built: 1979 1 CC-0253 Repaired / Replaced I Replacement: ASME Code Stamped: Authorizing Document: Replacement Yes 4-04-152628-00 Posi-Seal Serial Number: ASME Code Class: 11862-11-A 3 Remarks: Applicable Manufacturer's Data Reports to be attached: Description of work: Tack weld pins to disc Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICA TE OF COAIPLIANCE We certify that the statements mtade in the report are correct and this Replacement conforms to the rules of the ASASE Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed Jaz%~.~z~b JL.........-.. Engineering Programs Manager Date o £ -*. a;_> Certmicate ofutuhorization Number: NA &nner or Orner's designee, Tde_ ericateonate. N b I

5.

v; .C/'"t-CERTIFICATE OF INSER VICE INSPECTION pi Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIARTFORD STEAM1 BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February, 12003 to ul' 31, 2004 , and state that to the best of my knovledge and belief the Oivner has performted e-aminatiots and taken corrective measures .t -~~ described in this Owner's Report in accordance 'ith the requirements of the SASE Code, Section YI. By signing this certificate neither the Inspector nor his employer makes anry warrant,, expressed or implied, concerning the examinations and corrective measures described in this Owneer's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind ari itgfrom or connected with this inspection. o misi/ Te De l I Commissions Texas I 080 Na'tional Board, State, Provinow, and Endorsements Date

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A ^. Appil Expiration date: N/A Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xi Date: 06/24104 Sheet 1 of I Unit: 1 NIS-2 Report number: ii Identification of System: C N-5 No.: C cable Construction Code: 1! Code Case(s): 1! Code Cases: N/A -C04-003 C C-1 -1649 974 Ed., W74 Add. 555 Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: VALVE 1 CC-1 024 J.E. Lonergan Co. 7703704-1-4 National Board No.: N/A Repaired / Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1979 Replacement Yes 2-03-146787-00 Applicable Mianufacturer's Data Reports to be attached: 3 Installed valve, new SN 7703704-1-1, rerated on W.O. 2-03-150644-00 Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. A.. --- -t n A, A,, Repair or Replacement ype Lodeaymooi aramp: Na Signed £ EngineeringPrograms fanager Date of Cr oy certificate ofAuthorization Number. NA SE V. e/. (¢~i-CERTIFICATE OF INSER VICE INSPECTION xpiration Date: NA I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by hARTFORD STEAMl BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to July 31, 2004 attd state that to the best of my knofwledge and belief, thte Oter has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described it this Owvner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injuty or property damage or a los of any kind artW'#gfrom or connected with this inspection. ~If P. Commissions Texas 1080 Date ( 12F/0 a Inspector's Aynature National Board, State, Pros-Ince, and Endorsements

414' Evluij frebt sIty l &$M..64VI!.4IUO "Ia SUC.'..NI&. P.Uptl £.jius. j* lmu~itiarg 1~.J. E. Lonerr;'.i Cc'. Red Lit-it 1(d., U1. of Verree, hi_~~hjhidre ~ 1a dla ms Moe -u locrN.B2/7 No._______ . re! C.V. I. Ccr~twjrjtinn, Coltr..bus, Ohioa 4321& 77-ICS3.. C________ Corporntzion, ColumnhucOio~2G______________

3.

C-n%:t tC.V.I. 43216. N&~a msa Ad46hpb& Cmu-c. e-.tci Electric Stati1on, CGlen Rose, Tex-ps 5.Valve-JSf* s-5 ria1 No 77X0-- -2370, Rev. Norm Saitnc Safety Retiff: I&al: Pwer Artwse,. Sq4. inll

  • fc Inch C.Se.50 suc450 Rated Toftr"0awv Stmapej
Th.0CTvcprcaUtc-ralo'ecn (rS1G)r Oiztlr~r425 7

he mU.-L!ar, desirs"rin. ",asmtm =J ws~L-:nmmxap eompli wilith M I.SME ,St.ion !T, Winter Alde-ndz. 3719747 1 Adiend I 76 I___ 75 ! Y Class Juc~,Dt C.ame N-. Pressuic Ccs.%ca:in-.; oePtess;.c-1ietia~siz Cocivacnca Setial No. cer Miagerial Specificu.ion a.- Cazaittr.j-JdcuuacC&dnnlclinrTp orCrd 33~Jy 967~-1ASME SA-216/t11CI non ~cD45i44-1 AS?197. SA-2lA/wC

b. Blar S'cckcL and Foctng:s S1p1o

~cd /A N/A B 3231-1 ~SZ SA-351 (CF-S), Type 30!. C29~I4 AS l*;: SA-479_Ty~0! s~~~scs

  • 03910 ASI-2: SA-4,79 Type 30!4 AJC.1sSerwGId A SHE. SA-4~79 Typjcj3.4C Sr~dc92961 ASIM !SA-47 9_Typc/.L0 Sur.,a.

I...gSr.'o aq~e .u,.I*...,. 1 S. 1*(t sI~A~la~~y jt.Z II he* v--

  • ()..

-A-* la-lormn

a--... en s£lfell J. I&OW44P$ llenIt 6:1.1 Studs - Cert. of -otr'o N;uts - Cart n~fConrur;7ncce-ASILESA-19W, crm. 2it

  • -Z=

% Othser Parts sue-I mm 1'llue Coesin.to t-V I-R4nT, Pin

  • 7C1.2'..$;

As',Irv SA-479 rvner 316 Bonnet MI Cert. of Con~fnrsi-nnec 'A-S SA-105 7C134 ASMS SA-479 Tyie 316 C.-If serr".y

  • Can4-1 AS1JE SA-716f1:9cn Bl 3ow.down not specified b~y code..

cenlr.U that the sacr~acurat.8made;n tshx fcpod% sMcCwcicrm.- Date ~ 1'Z. S -ne J Ea UNERfGAN C..PX Dy Ccrtdficasc of Aushcarizatien ~J. A3~Aur.- 9, 1 979 I CERIFIfVCATE OF' SlID I INSPEICTION 1, dir unictsrZ.nrd, hllittiiet,ualrl commse sion is~.uesI by site nJatiov,aul foat.! of rlc'ik: anl. Pr-tse Vcxs4c; lnsg.ov.ems aned thucState. or Irsenne ,zi.c. The Th rtfordlStni. Bol -:.C 'at_____forbaronnin.~j-r:cfd chv. equi;-avc-nt Jescri1.ed in this Data Report rm ___- E.; 1 ' Ia2.. statr tlant to the 6ess ur my Lsiowledg 'ard bl*1icf. dii Manufacturer has, Lcdi ssutecd this c~uipment in accewtdancr-with the al-plicable Subsections of A!-,Nl-' Suction 111. JeC By sigitin. this csertifcate. ncishrr ilt. Insprcimr not Isis emplaye, makes any warranty, expressed or impi icJ, concern. ing she equiptrnvre ide:.edhed! in. this Mzzz: Reponi. Fitcmac nete she rtltijeetr a-it his c-inricy~cr crizl, be liable in zny niznoer for any rersmeocal iriju~y ic-prorcry da~jeor a loin of any kind acizinr. Iroort at immected %wtie cIsix in3,lcctionl. V I ' eIt t

1 I

( 2-~. t t primel 1.. U.S.A. 1/7J PPIA ea i. U..A. thJThis Saspu (?.421 Is *j.. L...Ie ".' flip A VS '.. 143 L. 471h U.. N r-York. X.V. 110OtI -:"V

7-

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: NIA Appli Expiration date: N/A Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xi Date: 06/24/04 Sheet I of I Unit: I NIS-2 Report number: 1CC04-004 Identification of System: CC N-5 No.: CC-1-1649 cable Construction Code: 1974 Ed., W76 Add. Code Case(s): 1555 Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: VALVE 1CC-1025 J.E. Lonergan Co. 7703704-1-3 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1980 Replacement Yes 2-03-146794-00 Applicable Mianuratuirer's Data Reports to be attached: 3 Installed valve, new SN 131846-1-1, rerated setpoint on W.O. 2-03-149475-00, rerated temperature on W.O. 2-03-150009-00 Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICATE OF COMPLIANCE IWe certifyJ that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. y Ji npuir Ortrinapramcni Type CodeSymbol Stamp: NA Signed Ha. Engineering Programs Aanager Date c0C - o2 q-a Certificate ofAuthorization Number: NA Owner or Owner's designeeItle Erpiration Date: NA .s v. t, Jc g CERTIFICATE OFINSERVICEINSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TFXAS and employed by IARrTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUThave inspected the components described in this Owner's Report during the period of February 1 2003 to Jul' 31, 2004 aid state that to the best of my kinoledge and belief the Owner has performted examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASASE Code, Section Xl. B)' signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of an)' kind a isingfrom or connected 'ith this inspection. iA-Commissions Texas 1080 Date ;/L7 ((° Insaectorssignature Naionat Board, State, Province, and Endorsements

tz 530&~ IccoqC'pcc FORM NV-1 CERTIFICATE HOLDERS' DATA REPORT FOR PRESSURE OR VACUUM RELIEF VALVES* As Required by the Provisions of the ASME Code, Section IlIl, Division 1 Pg. 1 of 2 [inkle Indistries Inc.

1. Minufactured and certified by 19919=

Valvp Divisio. 8222 Blufft Rd., Fot N=. in M6809 tnm. Ord O'dioss of NV Certificate HOdeorl Manufactured for Texas Utilities ELet. Co., PO Boac 20, Dallas, TX 75221 (na" an F* ofe PrCh"oI

DLas, IX 76043
3. Location of installation Wi Eier=c, tmh Peak SES, 5 Mi, NJ/Glien Rose TX off FM 56 (76043) Oper. Whse, nrtrm"t nd adress1
4. Valve ND1_ _

Orifice size 1.34 Nom. inlet size 2" Outlet size 3 1iff M no.. series no.)

t.

Bn.1 1.n.1

5. ASME Code. Section Ill. Division 1:

i974 IR 147f 3 N/A lednwornl ladderda dot.) IelS ) ICood Cosa no.l

6. Type SRM1 F=lO 135 F 22 at 33 MIN.

OF Isprnrg. 00l of Po-ofwer oerod) I: el DreSw1. pov) tilowdown. psi) (ratld temp.) (hydrO. ltt. 05V. ff40)

7. Identification 131846-1-1 N/A A920187 Rev. -

N/A 1993 tCnr. Holadrrs serial no.) ICRNI Itdawig nO.) (Nati'. BD. no.) 4iver builtI

8. Control ring settings 2 notches down
9. Pressure retaining items:

Serial No. or Mat'l. Spec., Tensile Identification Including Type or Grade Strength Body S4260-3 SA-216 WCB 70 ksi BonnetXXMW6 T2547-8 SA-216 W:E! 70 ksi xop mm Cap H7069-1 SA-216 WCB 70 ksi Nozzle S4114 -41 SA-351 CF8M 70 ksi Disk 98400 Spring Washers Adjusting Screws (Rfi Pin Screw) 30091 sao= Gag Plug.'*.-e 30091 .8peog1 Stud 8097943 >oxxmo Hex Nut 6014914 mmom=mPipe Puig 73028 SA-479 WIY 316 S "479 1Y 316 SA-.479 TY 316 SA-193 GR E-7 SA-194 GT 3H SA-479 TY 316 75 ksi 75 kqi 75; ksi 175; ksf N/A 75 1eqi

10. Relieving capacity 125,185 lb/hr (250 GPM) 10%

overpressureascertifiedbytheNationalBoard 4-16-85 (steam or fluid. WMi tlad x)lst,

11. Remarks:

None CERTIFICATION OF DESIGN Design Specification certified by Robert K. RMt P.E. State OH Reg. no. E-{041016 Design Report certified by N/A P.E. State N/A Reg. no. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules for construction of the ASME Code. Section Ill, Division 1. NV Certificate of Authorization No. N-2853 Expires Novernber 18. 1994 [7tinkle Industries Inc. u-i p t Date ? it 23 Name LOnferan Valve Division Signe_ (NV Ceolieate Holder) muorizea Supplemental information in form of lists, sketches. or drawings may be used provided lli size is 8Y, X 11 (21 information in items 1 through 4 on this Data Report ^.luded on each sheet, 13) each sheet is numbered and the number of sheets is recorded at the too of this form This form (E000421 may be obtained from the Order Dept.. ASME. 22 Law Drive. Box 2300. Fairfield. NJ 07007-2300.

FORM NV-1 (Back - Pg. 2 of 2 ) IV? IS-3 0(o /CCOl' -CCILI Certificate Holder's Serial No. 131846&-1-1 I CERTMFICATE OF INSPECTION e undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province Michigm and employed by HiBI & I CO. of

nartcrL, IA have inspected the valve described en this Data Report on C)& 7e6 Em 6

/9 ! and state that to the best of my knowledge and belief, the Certificate Holder has constructed this valve in accordance with the ASME Code. Section Ill. Division 1. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the component described in this Data Report. Furthermore neither t pector nor his employer shal Ibe liable in any manner for any personal injury or propert damage or a loss of any kind arising from or conPdfdvhthis _ate /Commissions 1G13 7WV g1 ttar rq _F Date Signed IAsh'L Sd. I.ACJCC@pIwm Cd g Ond naef a. E nd re.1

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report o Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: NIA Applicable Constructio Expiration date: NIA Code Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: NIA Date: 06/24/04 Sheet I of 1 Unit: I iumber: I CC04-005 System: CC 1-5 No.: CC-1-1649 n Code: 1974 Ed., W76 Add. Case(s): 1555 Name of Component: Component Identification: Other Identification: VALVE 1CC-1026 National Board No.: N/A Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1979 Replacement Yes Name of Manufacturer: Serial Number: ASME Code Class: J.E. Lonergan Co. 7703704-1-2 3 2-03-146795-00 Applicable Manuracturer's Data Reports to be atIscbed: Description of work: Installed valve, new SN 7703704-1-3, rerated on W.O. 4-03-149859-00 Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICA TE OF COMPLIANCE Wie certify' that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Tjpe Code Symbol Stamp: NA Signed Engineering Programs Alanager Date (; -2$- oS ' Certf-cate ofuthorizationNumber: NA 0aretFor O0wner's designee, Title ExpirationDate: N

5. L Z'r t

CERTIFICATE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by HARTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner Report during the period of Februaryl, 2003 to July 31, 2004 and state ttat to the best of my kitoledge and belief the Ovner has performted examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the AS,15fE Code, Section YI. B) signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of an), kind arfsingfrom or connected with this inspection. k e y Commissions Texas 1080 Date afinspecr's sistgnature Natdenal Board, State, Prlroince, and Endorsements

.ccof -c05-rlO'UI NV-1 FORl s.%F.lr AND 5;TE'rY ;I;LIr:r tLVESo As required by ihe l.rovisionr laf dicASME Cu'e Rules 1 .J. E. Lonerga eo., Red Lion Rd., ;. of Verree, Philadelphia, Pa. 19115 Model1& N.D-1OJ OrdetSo. 7703704 Conclact Dace 8/25/77 _Ntsrocal losd No. N/A ^ ganurgredI-ofC-.V.I. Corporation, Columbus, Ohio 43216 _Order Nu. 77-1883

4a0w sad Add1rese C.V.I. Corporation, Columbus, Ohio 43216
3. Ownr

'^* ameo and Add&sss . L'oaioc of Plan: Comanche Peak. Steam Electric Staticn, Glen Rose, Texas

5. Valve identication PSV-53 Serhi No.

7703704-1-3 Drawitg No. A-2370, Rev. None Type Safety Relief' Valve 1 287 iz N/A nlet 2_ Outlet 3'0 safsty; safety Relief: Plo:tPe..tr Astvuted Inch Lee IIs %D.., F.ca.s ICU% 150 450 or RaI oel Temperature Stamped Capaci 257. G.P.M. eM 0#1J 0%7.Overpres'use Dlowdown(PSIG). Outlet Hydrostatic Tcnt (PStG) Inlet 225 1tDCYValve 425

7. The mf:frisl, design, constructio and workmanship comply with ASME Code, Sertion lit, Winter Addenda Class

, E3don 1974 ,dndaDutc 12/31/76 C X 1553. Pressure Containing or'Pressure Retaining Cormpoients t Cvi

a. Castings Dody Bonnet C£4X4cM
b. Bar Stock and lForgings Suppont Rods Nozzle Setial No. or Idcntification D6208-1 D8682-1 Material Specificauion Including Type or Grade AS1SE SA-216/WCB
  • ASME SA-216/WCB N/A

- 3231-3 N/A ASME SA-351 Gr. Cf8 ° -^ 1-"^ -11. Disc ZA -'$I Lypc

  • J '4 Spring 'ahr
03910, ASME SA-479 Type 304 Adjusting Screw G1410 ASME SA-479 Type 304 Spindle 92961 ASME SA-479 Type 410 "S.s~pprcental fie la.ain I(nn of II. I*. a I're~es at drawjny, mar b~e ur-ed provlerel C I) a las i
0. 5'
  • Ii".

(23 into. m:'uion it, itonii 1.2 on tthde data ,re"t I. inc Iudcd on etCCh shawl, and (.1) ~...h short is n.mL.r.I n.inn.,r of.1.t~.s Is iree.l.) of e1

  • of athi*s U.5l.

4 FMIJMI NV- (bacl W*Vat Ne. or4 s Ritffies." Heat No. 04P637 Studs - Cert. of Conformance - Nuts nat^f rnn fnnrTrmc-a / C.C0Y -0057 Kilivetia Specificleai3. Inadluilg Ty" tGae o

c. Spring

-`d. Dolting ASTI4 A-229 ASME SA4t93 GIL. B7 Ag?4! qA-194 Mr-Z?

e. Othet Paris such as Pilot Components Ring Pin 7G1348 ASME SA-479 Type 316 Bonnet Plug Certificate of Conformance -

ASME SA-105 Gag Screw 7G1348 ASME SA-479 Type 316 .Cap B2968-3 ASME SA-216/WCB ~*Blowdown not specified by. code'._ I We certify that the statements made in this report are correct. Date 19 7 Srned J. E. Lonergan Compan a. -*b-ysameturer w-a sRu. 1 Certificate of Authorization No. N-2359 expires Se t. 10 8. CERTITICATE OF SHOP INSPECTION 1, the undersigned, holdinS n valid cou.mission issued by the National lo trd of Boiler ard Pressur^ VesseLlrsreetors Pen. eHrti'olrg 'Ltin. Bsir2. VesI&I oe.i sad the State or Ptovince of Penaan d employed by__The Ha of Hartford, Conn. hsveinsrected the equipment desctibed in this Data Report on _ 4 A.14 t4 ZO 19. snd state that to the best of my knowledge and belief, the Xi3nufascturer has con-structed this equipment in accordance with the applicable Subsections of ASME Section Ill. By signing this certificate, neither the Inspeetor nor his employer makes. ally wRtnty, expressed or in plicd. coneera-ing the equipment described in this Data Report. Furthermore, neither the Inspector nor his employer she1ll Ibe liable in any manner for any persos al injury or property dasnage or a loss of any kind arising from or connected with this inspection. comnissps S Zta OInspector) (Natlonal Doard. State. Province and 210. P tnted 1n u U..A s1/ PaintedI,~ U.SA. 3/73This fo~i M M42 Is abtainabic from the ASME. 34S C. 47th VA.. lNew Yolk. N.Y. 10217

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: ICC04-006 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CC Type Code Symbol Stamp: NIA N-5 No.: CC-1-1649 Authorization No.: N/A Applicable Construction Code: 1974 Ed., W76 Add. Expiration date: NIA Code Case(s): 1555 Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: NIA Name of Component: VALVE National Board No.: N/A Year Built: 1979 Component Identification: 1CC-1027 Repalred / Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: J.E. Lonergan Co. Authorizing Document: 2-03-146796-00 Serial Number: 7703704-1-1 Remarks: ASME Code Class: 3 Applicable Manufacturer's Data Reports to be attached: Description of work: Installed valve, new SN 7703704-1-2, rerated on W.O. 2-03-150439-00 Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP Pressure: NOP, Temp.: NOT CERTIFICA TE OF COMWLIANCE W'e certify that it e statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section YI. Z Repair or Replarement Type Code Symbol Stamp: NA Signed EngineeringPrograms Manager Date c -2¢ - c.5 Certificate ofAuthorization Number: NA u,,e rOwner s designee, Title Eprto ae V s: or O% CERTIFICATE OF INSERV'ICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by AIIRTFORD STEA1M BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February, l2003 to Juj3),2004 a nd state that to the best of my knowledge antd belief the Owner has performted eraminations atd taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMV!E Code, Section,r. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owneer's Report. Futthermore, neither the In.spector nor his employer shall be liable in ai) mannerfor any personal injury or property damage or a lovs of any kind arisingfronm or connected with this inspection.

e.

Commissions Texas 1080 Date _I/ iot_ a Inspeeror's signature National Board, State, Prorinee, and Endorsements

GN - X z (; C J. E. Loncig3n Co., Rc-4 Lion R'd.

11. of X'crree, rkzi.1;aelphic, a191
1cj~.

b-Pa 1 E11500 Jc :oD-1 0-T-770 73704t c~xzxtl 8125;J77 a;w1lodo. / 2,,ewso-C.Y.I. Cro~nrctionz, Colut-bus. Ohio 43216 7rcs 7-:1883 C.V.I.- Corporation, Coli-bus, Chio 43216 ~*;Z L_-cm;oQ ofP;=s Comanche ?e--k Stcz-Eilectric Stations Glen Rose, Texas 5 aPS cc;rio-c 553 _5; O 7703704-1-2

12n,

.A-2370, Rev. iDolwe

  • T Safef-y Relie~ Valve

-I. ozifcc 1z.i287 NI¢~z

A Ie 2X' 0

311 6 cPrs e 150 -;-450 ° S-p< >;t 257. C~... 10,,ocpsuc Blo-doqvn (PSIG) JIT~ro5t:Cc jtcS1 CPG) Inlct. . 22.5 ^^ ~ Outle~t

7. Tbe =avetla:, &p cocstmeccilm and r--oxsk-n1.r.%p ccnp>l% -iith ASNIP. Co03c, Srnct;oh tll, Winter Addenda

-3 ,1974,, ~dcd Dt 12/31/76 Cs O_ 5_ Presswer Ccr.:,-,1= e'rr-ss~c R;cialning Comp-onents v sxias deslifiedoaIncludiz; Type or Grasdc Bc<

  • 9°i0-lASHE SA-216MlCB

'B;;: 1)544-2-* ASEZ SA-216/t70MB

b. Bw tkc z=Z~ Fo-Siczs z'B-*

3231-2 A IEE SA-351 (CF-8) Type 304 -) Ci G994_ ASMf SA-479 TYPe 304

  • .;fi $.Lets03I ASIX SA-479 TYPe 304 Adju~stin.; Screw 1410 A

Z~ SA-A79 Ty~pe 304 Spinzlc. 92961 ASHIE SA-479_~p~e 41-0 twrr~t,^tS f,;l,. #fE¢XF e @;@;D 2< J~fFrS^%;afe a).,, 0,.;. 2-in, Item.s I.1:It on 1-

-C..
  • et
  • ic-;t_

-rb Wft-el, wl J aL Vhfet i4 1 I¢eP t^*;fv -E t*, e

  • (

I CTi .D~ V~ ,w *wiwsawm

  • o c-o

h 4-Al/ ~ARSJ6 ..C. smint VC

t.

1:. I Hc.. !:o. 04P637

  • ~.¶.t.3

~j~ATi4AcEw.TP1 - A.SC3TU-4.229 fA6E.1 634S-MOI 2. ASMe A-229 04 ,1l 0 }72. Studs - Cerc. of Conformancc

d.
  • ,:dng Iuzs Ccrt. of o
  • AsY;E S1I-193,- CM. B-7 ICC c"-Cf.

_.Sr-; SA-3 *1t { C-. 2-14 7 C. odhcv PRtts 51tct as P;ios Comp;onents, .I R~n-Pin 7Gi348 ASNE SA-479 Type 316 Bonnet Plug Ccrt. of Confoorznce AS.-! SA-105 I ~*.. s, ,*...*..t................... s2 C-oO

c.

1, J.: --'r. i 144 ASctr SZA-L79 lr--- % C i .B2974-2 .-ASMZ SA-216/c1rc B x VI o':ao-nno~t aecified by code. * .1 Vc ccrJ?*!,. %ha ZC 1'13CSme::_ ne ifn this xcpofc 2rc co.nem D-e -'/ 1 / - 19 71 Ss;ncd J-

w. LO:xRGCAŽ" CC,';MAtY By I-.

CCft;fc2:e of Aiwv:;zatioz \\o.- '-1443 cxp.res 'Aug. 9. 1979 CERTIFICATIE OF SHOP l.INSP'EC1J0N 1, J. s:c zicrsiisee. v, n lid col=%lssion ;rsucd by the Notionn1 30o:;d of floi!cr and Pressure V'essel Inspccto s and A ~ )sbweF<t_ Psm-2. and Ptnlovied The licy tford S;n-- ?olr

1.

._Co.'- 0 S.E2

PtC-',

Cr., save'ansrcled te!e equipment drstibcd; Rrss Qn_ - _1 '5._ td stz:c ti%=t to th.e Lcst of zmy knowledre -ind b.lief, the NII:nuf acrurer )-&s co'- Stu-.cted :!.s cc -.;:oezt i: Accovdtn:e with txFc app!icabic Subseeonls of AS..:E Section til. I By this evZt;Ucatc, no.gtl.cf the lnspcctor nor Ms e.-ployct mLe5s Any ':1tinsy, e)prcssed vw implicd, cqnCCei I it.: the cqi;pm-enr ecscz;bcd in :his Dsa IteplortL Furtl.ccr.owt. neiter tl c lnspvctot riot his efrnployer sihll be Nialie in anj m:n::c: for r.-y p ar:n. ijusy or ptoecrty danagc or a loss of zr.y Lind srmunp from or connected 'Wit1 this inspcction. -te J 1 e: f - -,n  : ---- -. -  Z--- 3 6 C" I I  2 .co.=;s)iT c 821 _w. Zyaza_ (N#'"*nftt blcerfd, Stele. Itewblic mpta No:.) I r.X^, W

- r I.t. -.o M.'3 I

I Tht. It..s C'42)Is II ti.-..t f..'rn thv A.;: :. 345 1. 4.71 HI. Z N..-Yoe 00VrTcLL189CI s93a dNtf 3W0LVMdcld'SO-Dd 'Ss0I c0-60-so 1nr C t/I It 3Dvd

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CC04-007 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CC Type Code Symbol Stamp: N/A N-5 No.: CC-1-1649 Authorization No.: N/A Applicable Construction Code: 1974 Ed., S74 Add. Expiration date: NIA Code Case(s): N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: VALVE National Board No.: 4031 Year Built: 1979 Component Identification: 1-LV-4500 Repaired I Replaced I Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Fisher Controls Co. Authorizing Document: 4-02-140435-00 Serial Number: 6432565 Remarks: ASME Code Class: 3 Applicable Manuracturer's Data Reports to be attached: Description of work: Replaced plug Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg r) as applicable: N/A CERTIFICA TE OF COMIPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. S e E g terRepair or Replacement Type Code Symbol Stamp: NA Signed ! EngineeringPrograms Alanager Date.c> -_25-c Certifcate ofAuthorization Number: NA -owner or Owner's designee, Thas

5.

a Le4A CERTIFICATE OF INSERVICEINSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIAR TFORD STEAI BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owvner's Report during the period of February I, 2003 to Juit 31, 2004 and state that to the best of my knowledge and belief, the Ovner has performed examinations ard taken corrective measures described in this Owner's Report in accordance with the requirements of the SASE Code, Section I. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a lo.s of any kind arising rom or connected with this inspection. l Commissions Texas 1080 Date f2/Z In ector's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CC04-008 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CC Type Code Symbol Stamp: NIA N-5 No.: CC-1-1649 Authorization No.: NIA Applicable Construction Code: 1974 Ed., S74 Add. Expiration date: NIA Code Case(s): N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: VALVE National Board No.: 4032 Year Built: 1979 Component Identification: 1-LV-4501 Repaired I Replaced I Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Fisher Controls Co. Authorizing Document: 4-02-140437-00 Serial Number: 6432566 Remarks: Applicable Manufacturer's Data Reports to be attached: ASME Code Class: 3 Description of work: Replaced plug Tests Conducted: Hydrostatic, Pneumatic, Nonminal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICA TE OF COPLIA NCE W e certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed f EngineeringProgramsAfanager Date 0<><-a P Certificate ofAuthorization Number: NA 0w71Wor Owner's designee, Title Expiration Date: NA 5-. .4 E s>e CERTIFICATE OF INSER V'ICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEYAS and employed by hA RTFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of

Februyl, 2003 to Jui' 31, 2004 atd state that to the best ofmy knowl ledge and belief tle Onvter has performed examinations and taken corrective measures

-!!o -described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor atty personal injury or property damage or a los. of any kind arising rom or connected with this inspection. f Commissions Texas 1080 Date G y in ector's signature National Board, State, Prov ince, and Endorsements (J

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A Appili Expiration date: N/A Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Date: 06/24(04 Sheet I of 1 Unit: 1 NIS-2 Report number: ICS04-001 Identification of System: CS N-5 No.: CS-1-1633 cable Construction Code: 1974 Ed., S75 Add. Code Case(s): N/A Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: HEAT EXCH TBX-CS HXLC-01 National Board No.: 31001 Year Built: 1977 Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Replacement Yes 3-03-343858-02 American Standard Heat Transfer 9-20007-01-3 Applicable Manufacturer's Data Reports to be attached: 3 Replaced bolting Tests Conducted: Hlydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NIA CERTJFJCA TE OF COMPLIANCE WVe certify that the statements made in the report are correct and this eplacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed LEngineeringPrograms Manager Date Sac fi' Certificate of Authorization Number: NA wu er or Owner's designee ljtle

f.

C CERTIFIC'ATE OFINSERVICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 1IA R TFORD STEIM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owvner's Report during the period of February 1, 2003 to Jtl' 31, 2004

  • and state that to the best ofmy kntowledge and belief the Otner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owrner's Report. Furthermore, either the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arisi, ronm or connected with this inspection. -Yf (1t Commissions Texas 1050 Date ISpector s signature National Board, State, Prorince, and Endorsements

FORM NiS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXIJ Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CS04-002 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CS Type Code Symbol Stamp: NIA N-5 No.: CS-1-1633 Authorization No.: NIA Applicable Construction Code: 1974 Ed., S75 Add. Expiration date: NIA Code Case(s): NIA Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: HEAT EXCH TBX-CSHXLC-02 American Standard Heat Transfer 9-20007-01-4 National Board No.: 31002 Repaired / Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1977 Replacement Yes 4-03-149766-00 Applicable Manuracturer's Data Reports to be attached: 3 Replaced stud on cooler, also replaced bolting by W.O. 3-03-343859-00 Tests Conducted: Hydrostatic, Pneunmatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed _ Engineering Programs Manager Date o e c ertifcate ofAuthorization Number: NA .s..desigeeT CERiTtleFCTEOFINSERV'CEINSPECTlON Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by hARTFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner s Report during the period of February 1, 2003 to July 31, 2004 , and state that to tte best of my knwloedge and belief thte Ovner has performted examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthtermore, neither the Inspector nor his employer shall be liable in aymanier forany personal injury orproperty damage or a loss of any kind arisingf, n or connected with this inspection. Commissions Texas 1080 Date G /in Insctor's signaAS tre National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06124104 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CS04-003 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CS Type Code Symbol Stamp: N/A N-5 No.: CS-1-1633 Authorization No.: N/A Applicable Construction Code: 1974 Ed., W75 Add. Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: HEATEXCH National Board No.: 19013 Year Built: 1978 Component Identification: TBX-CSFLSI-02 Repaired I Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Pall Trinity Micro Corporaton Authorizing Document: 4-04-153859-00 Serial Number: 35355 Remarks: ASME Code Class: 2 Applicable Manufacturer's Data Reports to be attached: Description of work: Replaced trunnion and closure bolting Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COAfPLIANCE FWe certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed Engineering Programs Manager Date c I - -2 o 5,Z L Certificate of Authorization Number: NA 0w.ner or Ow ner's designee, Title Expiration Date: NA 5V. _£ {Ge (,f-Z CERTIFICATE OFINSERV'ICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by IIAR TFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to Jui 31, 2004, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in tlis Owntter's Report. Firthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arisin rom or connected with this inspection. WI Commissions Texas 1080 Date _ G/; tY-sJcetor's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1CS04-004 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CS Type Code Symbol Stamp: NIA N-5 No.: CS-1-1633 Authorization No.: N/A is Applicable Construction Code: 1977 Ed., W79 Add. Expiration date: N/A Code Case(s): 1644-6 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: SNUBBER CS-1-1 12-716-C41K Pacific Scientific 19296 National Board No.: N/A Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1981 Replacement Yes 1-03-150447-00 Applicable Manufacturer's Data Reports to be attached: I Replaced snubber Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg r) as applicable: N/A CERTIFICA TE OF COM1PLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair orRe>placement Type Code Symbol Stamp: NA Signed On o Engineering Programs lManager Date c, C "ertifcate of uthorizaion Number: N Ow ner or OHwner's designee, T~ite Expiration Date: NA 56: V o { CERTIFICA TE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by MARTFORD STEA,1M BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to July31, 2004. and state ttat to the best of my knovledge and belief the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warrantyr expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore, neither the Inspector nor his employjer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind ari" gfromi or connected vith this in.spection. Commissions Texas 1080 Date ' /2 dy spector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: ICS04-005 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: CS Type Code Symbol Stamp: NIA N 5 No.: CS-1-1633 Authorization No.: N/A Applicable Construction Code: 1977 Ed., W78 Add. Expiration date: N/A Code Case(s): 1644-6 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: SNUBBER National Board No.: N/A Year Built: 1980 Component Identification: CS-1-104-024-S52K Repaired I Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Pacific Scientific Authorizing Document: 4-04-154452-00 Serial Number: 12039 Remarks: ASME Code Class: 2 Applicable Manufacturer's Data Reports to be attaclied: Description of work: Replaced snubber Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COAIPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. 'f Repair or Replacement Type Code Symbol Stamp: NA Signed Engineering Programs Manager Date o 6-l -H i' CertifJcate ofAuthorization Number: NA Owner or Owner's designee, Title Erpiration Date: NA 5 C ,,e CERTJFIC'ATE OFINSERJVICE INSPECTION 1, the undersigned, Itolding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIAR TFORD STEAM1 BOILER INSP. A ND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to.ula 31, 2004 , and state that to tle best of my ktotle(ge and belief the Owvner has performed examinations and taken corrective measures described in this Owvner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employ er shall be liable in any mannerfor any personal injumr or property damage or a losM of any kind arisin fronm or connected wvith this inspection. Commissions Texas 1080 Date g/261 Y d spector's signature National Board, State, Prorinee, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm-Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A Ad AppIli Expiration date: NIA Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Date: 06/24/04 Sheet I of I Unit: X NIS-2 Report number: 1CS04-006 Identification of System: CS N-5 No.: CS-1-1633 cable Construction Code: 1974 Ed., W75 Add. Code Case(s): NIA Code Cases: N-416-1 Name of Component: Component Identification: Other Identification: TANK CPX-CSATBA-02 National Board No.: 4228 Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Replacement Yes 2-02-145210-00 Name of Manufacturer: Serial Number: ASME Code Class: Chicago Bridge & Iron Co. G-1 579 Applicable Mlanufacturer's Data Reports to he attached: 3 Added piping and supports to tank Description of work: Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CER TIFICAI TE OF COAfPIANCE iJ'e certify that the statements made in the report are correct and this Replacement Repair or Replacement Engineering Programs Aanager Date c) ..- S-c-conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp: NA Certificate of Authorization Number: NA Signed Owner or Owner's designee, Title J: L- /C r__. CER TIFICA TE OF INSER VIcE INSPECTION Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIARrTFORD STELAM BOILER INSP. AND INS. CO. ofCONNECTICUThave inspected the components described in this Oivner's Report dtring the period of February 1, 2003 to Juli' 31, 2004 , and state ttat to tie best of my kitonledge and belief, the Owsner has performed examinations and takei corrective measures described in this Owner's Report in accordance with the requirements of the ASMVE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any, mannerfor any personal injury or property damage or a loss of any kind aris g ifron or connected with this inspection. Commissions Texas 1080 Date _/2 1;1 Inspector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A Appilh Expiration date: N/A Date: 06/24/04 Sheet I of I Unit: 1 NIS-2 Report number: ICT04-001 Identification of System: CT N-5 No.: CT-1-1642 Cable Construction Code: 1974 Ed., W74 Add. Code Case(s): N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: PUMP National Board No.: NB-608 CP1 -CTAPCS-01 Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Year Built: 1979 Replacement Yes 4-04-153313-00 Serial Number: ASME Code Class: Description of work: Bingham-Willamette 15210085 2 Remarks: Applicable Manufacturer's Data Reports to be attached: Replaced bolting on mechanical seal Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICI TE OF COAMPLIANCE lVe certifyj that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xi. Signed _,Z' Repair or Replacement Type Code Symbol Stamp: NA n r gt icao t tn Number:h NA CEngineeringrrograntsAfanager Date 06:- s-04, Certificate ofAuthorization~me~ Uwner or Owner's designee, Tie Expiration Date: NA S. ;,. CERTIFICATE OF INSER VICE INSPFCTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 1ARTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of

ebriur I, 2003 to Jiej 31, 2004. and state that to the best of my knowledge and belief the Ovner has performed examitnations atd taken corrective measures described in this Otvner's Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Oiter's Report. Furthermore, neither the Inspector nor his employer shall be liable in aty mannerfor any personal injury or propert damage or a loss of any kind arisin from or connected with this inspection. Commissions Texas 1080 Date Ik14 6frspector's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06124/04 Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1FW04.001 Repair Organization P.O. No., Job No., etc.: TXU identification of System: FW Type Code Symbol Stamp: N/A N-5 No.: FW-1-1650 Authorization No.: NIA Applicable Construction Code: 1974 Ed. S74 Add. Expiration date: NIA Code Case(s): N/A Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xi Code Cases: N/A Name of Component: VALVE National Board No.: 6169 Year Built: 1981 Component Identification: 1-HV-2188 Repaired / Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Fisher Controls Co. Authorizing Document: 4-03-146448-00 Serial Number: 7509006 Remarks: ASME Code Class: 2 Applicable Manuracturer's Data Reports to be attached: Description of work: Replaced primary plug, pilot plug Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, sith Test Pressure (psi) and Temperature (deg r) as applicable: N/A CERTIFICA TE OF COAMPLIANCE We certify that the statements made itt the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xi. Repair or Replacement Type Code Symbol Stamp: NA Signed __ Engineering Programs Aanager Date O . 0 / Certificate of Authorization Number: NA Owner or Own ter's designee, Title Lxpiration Date. NA 5 A. Le CERTIFICA TE OF INSER VICEE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TE-XAS and employed by HlAR TEORD STEAM BOILER INSP. IND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to ld 31 2004 and state tat to the best ofmy knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warrante, expressed or implied, concerning the examinations and corrective measures de.vcribed in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or atloss. of any kind arisin rom or connected with this inspection. ? A Commissions Texas 1080 Date luspecbssighature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: NIA Appli Expiration date: N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME SectIon Xl Date: 06/24104 Sheet I of I Unit: 1 NIS-2 Report number: IFW04-002 Identification of System: FW N-5 No.: FW-1-1650 cable Construction Code: 1974 Ed. W74 Add. Code Case(s): NIA Code Cases: N/A Name of Component: Component Identification: Other Identification: VALVE National Board No.: N/A 1FW-0199 Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1981 Replacement Yes 4-04-154292-00 Name of Manufacturer: Serial Number: ASME Code Class: Borg-Warner 66222 2 Applicable Mianufacturer's Data Reports to be attached: Description of work: Replaced disc. Stud seal welded to disc by Flowserve Corp. Williamsport, Pa. R-523R-1 NR-44 expires 07/10/04. Ground excessive metal in body. Tests Conducted: Hlydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTFICJA TE OF COMPLIANCE Ie certify that the statements made in the report are correct and this Replacement Repair or Replacement EngineeringProgramsAManager Date o-;2s vy conforms to the rules of the ASME Code, Section KI. Type Code Symbol Stamp: NA Certificate ofAuthorization Number: NA Signed R Owner or Owner's designee, Title S-l'. GA.C. CERTIFICATE OFINSERVICEINSPECTION ExpiratonDate: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEYAS and employed by 11,1RTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februay 1 2003 to July 31, 2004 a atd state that to the best of my knowledge and belief the Owvner has performed eraminations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASM1E Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a lo.s of any kind arisin front or connected with this inspection. Commissions Texas 1080 Date Sptor'S signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Date: 06/24/04 Sheet I of I Unit: 1 NIS-2 Report number: 1MS04-001 EUUIIA"+X~lIIdIU aI< Repair Organization P.O. No., Job No., etc.: TXU JUIRMUMI1n 011 Type Code Symbol Stamp: N/A I Authorization No.: N/A Applicable Constructio Expiration date: N/A Code Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A 1-5 No.: MS-1-1648 in Code: 1974 Ed. W74 Add. Case(s): N/A Name of Component: Component Identification: Other Identification: VALVE l MS-0144 National Board No.: N/A Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Replacement Yes 1-02-145882-00 Name of Manufacturer: Borg-Warner 28332 Serial Number: ASME Code Class: Description of work: Applicable Manufracturer's Data Reports to be attached: 3 Replaced gate Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICA TE OF COMPLIANCE IWe certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section YX. Repair or Replacement Type Code Symbol Stamp: NA Sig.d o -Engineering Programs Manager Date 0 6 -dc). o 5t Certificate of Authorization Number: NA Sigred - ~ e' Ieinr Ti-Expraio -ae 5 e vs ak Title CERTIFICATE OF INSER 'ICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued bj' the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIAR TFORD STEIAf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Opvner s Report during the period of February 1, 2003 to July 31, 2004 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance wit/h the requirements of the ASASE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes anya warranty, expressed or implied, concerning the examinations and corrective measures described in this Oivniter's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or alov of any, kind arising ont or connected with this inspection. Commissions Texas 1080 Date v I etor's signature National Board, State, Prorinee, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A I Appli Expiration date: NIA Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Date: 06/24104 Sheet 1 of I Unit: 1 NIS-2 Report number: 1MS04-002 Identification of System: MS N-5 No.: MS-1-1648 cable Construction Code: 1974 Ed., S74 Add. Code Case(s): NIA Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: VALVE 1 -HV-2336A National Board No.: 349 Repaired / Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1979 Replacement Yes Rockwell 1-02-145589-00 Serial Number: ASME Code Class: Description of work: NM-94 2 Applicable M~anutacturer's Data Reports to be attached: Replaced disc and bolting, drilled bolt holes deeper and rethreaded. Tests Conducted: Hydrostatic, Pneumatic, Nontinal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMIPLIANCE We certify that the statements made in the report at Signed re correct and this Replacement conforms to the rules of the ASME Code, Section YI. Repair or Replacement Type Code Symbol Stamp: NA EngineeringPrograms Manager Date 6-C o ( Certirfcate ofAuthorization Number:.NA - Oiner or Owner's designee, Title x D 5* V Gus o CERTIFICATE OFINSERVICE INSPECTION Expiration Date: NA I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors arnd the state or province of TEXAS and employed by lIARt TFORD STEAM1 BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Ovner's Report during the period of February)1, 2003 to Judy 31, 2004 , and state that to the best of my ktoiledge and belief, the Ovter has performted eraminations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASM11E Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in an) mannerfor any personal injury or property damage or a loss of any kind arisingfjone or connected with this inspection. Commissions Texas 1080 Date C.f 'ector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: NIA Applil Expiration date: N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl l Date: 06/24/04 Sheet I of I Unit: NIS-2 Report number: Identification of System: N-5 No.: -able Construction Code: Code Case(s): Code Cases: N/A 1 1 MS04-003 MS MS-1 -1648 1974 Ed. W74 Add. N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: VALVE 1MS-0134 Borg-Warner 35782 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Repair Yes 4-02-145754-00 Applicable Manufacturer's Data Reports to be attached: 2 Restored slots on retaining ring by welding Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A We certify that tire statentents made it the report ar Signed CERTIFICA TE OF COAMPLIANCE

  • e correct and this Repair conforms to the rules of the ASME Code, Section XI.

Repair or Replacement Type Code Symbol Stantp: NA Enrtginteering ProgramsAfantager Date c) . Aj!- o Certirfcate ofAutihorization Number: NA neror Owner's designee, Title 5: t/. A< CERTIFICATE OF INSER J'ICE INSPECTION . piratin ate: 1 the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and tie state or province of TFXAS and employed by IAR TFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februaw, ',2003 to July31, 2004 atd state that to tie best ofmy knowledge and belief thie tOner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes anyi warranty, expressed or implied, concerning the examinations and corrective measures described in this Ownrter's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of ant) kind arising ront or connected with this inspection. _Commissions Texas 1080 Date 412 bt I pector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Sheet 1 ofil Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1RC04-001 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: RC Type Code Symbol Stamp: N/A N-5 No.: RC-1-1645 Authorization No.: N/A Applicable Construction Code: 1971 Ed., S73 Add. Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: PUMP National Board No.: W26283 Year Built: 1982 Component Identification: TBX-RCPCPC-01 Repaired I Replaced I Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Westinghouse Authorizing Document: 3-01-310210-01 Serial Number: 5-115E641G01 Remarks: ASME Code Class: I Applicable Manufacturer's Data Reports to be attached: Description of work: Replace cartridge seal assembly Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICATE OF COWPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed rEgineeringPrograms lfanager Date o6.S <Z Certificate of Authorization Number: NA Owner or Owner's designee, Title Expiration Date-NA I/ 1 H 1, /_ CERTIFICA TE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 1H1ARTFORD STE-1A1 f BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februa,' 1 2003 to Jtil' 3), 2004 , aid state that to the best of my knowledge and belief tte Ovnter has performed examinations and taken corrective measures described in this Owner's Report in accordance with lthe requirements of the ASASME Code, Section Xl. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Ow ner's Report. Furthermore, reither the Inspector nor his employer shall be liable in any mannerfor anty personal intjury or property damage or a loss of an), kind ari mgfrom or connected with this inspection. g Commissions Texas 1080 Date /Z7 < nspemor's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS.2 Report number: IRC04-002 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: RC Type Code Symbol Stamp: N/A N-5 No.: RC-1-1645 Authorization No.: N/A Applicable Construction Code: 1971 Ed. S73 Add. Expiration date: NIA Code Case(s): N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: PUMP National Board No.: W26285 Year Built: 1982 Component Identification: TBX-RCPCPC-03 Repaired / Replaced I Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Westinghouse Authorizing Document: 3-99-304372-01 Serial Number: 3-115E641G01 Remarks: Applicable NManufactirer's Data Reports to be attached: ASME Code Class: I Description of work: Replace cartridge seal assembly Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature ('deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFIC'ATE OF COMPLIANCE )J'e certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASMilE Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed E ngineering Programs Malnager Date c) c Certifcate ofAuthorization Number: NA Owner or Owner's designee, Title Erpiraton Date: NA _s / CERTIFICA TE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by hARTFORD STEAMlf BOILER INSP. A ND INS. CO. of CONNECTICUT have inspected the components described in this Owvner s Report during the period of FebruaroL 2003 to July 3i, 2004 and state that to the best of my knowledge and belief the Oiner has performted examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employjer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owv ner's Report. Furthermore, neither the Inspector nor his emplo)yer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arising rom or connected with this inspection. 71j".40' Commissions Texas 1080 Date _ A l Inaecor's signarure National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet 1 of 1 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1RC04-003 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: RC Type Code Symbol Stamp: NIA N-5 No.: RC-1-1645 Authorization No.: NIA Applicable Construction Code: 1971 Ed. W72 Add. Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: REACTOR VESSEL TBX-RCPCRV-01 Westinghouse 10773 1 National Board No.: 22187 Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1977 Replacement Yes 2-04-154013-00 Applicable Manuracturer's Data Reports to be attached: Description of work: Install CETNA clamp on 4 instrument columns Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICA TE OF COMPLIANCE J'e certify that the statements made in the report are correct and this Replacement Signed Repair or Replacement E ngineering Programs Afanager Date O j _- v 4 conforms to the rules of the ASME Code, Section XI. Type Code Symbol Stamp: NA Certificate ofAuthorization Number: NA Owner or Owner's designee, Tile ./ CER TI F ILC TE OF INSER [ICE INSPECTION Erp at: Date: NA I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TFXAIS and employed by lIAR TFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februay 1, 2003 to Jtj 31, 2004 and state that to the best of my knowtledge and belief the Otwner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMIE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Onqter's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury orproperty damage or a loss of any kind arisingfrt or connected,vith this inspection. 1It

e..

I9Lt j.. Commissions Texas 1080 Date to.y InTior's si;r-na-Pure National Board, State, ProrInce, and Endorsements - I

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Rhpnft I of I Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1RC04-004 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: RC Type Code Symbol Stamp: NIA N-5 No.: RC-1-1645 Authorization No.: NIA Applicable Construction Code: 1971 Ed. S73 Add. Expiration date: NIA Code Case(s): 1484, 1528, 1493-1, 1355 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: STEAM GEN TBX-RCPCSG-01 Westinghouse 2191 1 National Board No.: W18585 Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Repair Yes 3-02-318222-01 Applicable Manufacturer's Data Reports to be attached: Installed mechanical plugs and expanded tube sleeves Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICA TE OF COMPLIANCE Wle certify that the statements made in the report are correct and this Repair conforms to the rules of the ASH V, Code, Section Xl Signed Repair or Replacement Type Code Symbol Stamp: NA EngineeringProgramsAfanager Date c: C.S~o.. CertificateofAuthorization Number:.Nil Owner or Owner's designee, Title s:, t CER TIFICA TE OF INSER VICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by IIARTFORD STEA11M BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februanry), 2003 to Ji' 31, 2004 t and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures 0 3described in this Owner's Report in accordance with the requirements of the ASAGE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concerning the examinations and corrective measures described it this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in arty mannerfor any persotal intjury or property damage or a loss of an)y kind arisinwfrom or connected wvith this inspection. AA.1h 4 - Commissions Texas 1080 Date j12-

  • to 6_

.pctr' sinaur Naioa Bord Ste Prvne an Endorement - -I IF - I spector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24104 Owner. TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1RC04-005 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: RC Type Code Symbol Stamp: NIA N-5 No.: RC-1-1645 Authorization No.: NIA Applicable Construction Code: 1971 Ed. S73 Add. Expiration date: NIA Code Case(s): 1484, 1528,1493-1, 1355 Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xi Code Cases: N/A Name of Component: STEAM GEN National Board No.: W18585 Year Built: 1978 Component Identification: TBX-RCPCSG-01 Repaired I Replaced I Replacement: Repair Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Westinghouse Authorizing Document: 4-04-152841-00 Serial Number: 2191 Remarks: ASME Code Class: 1 Applicable Manufacturer's Data Reports to he attached: Description of work: Removed plugs Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICA TE OF COMlPLIANCE l'e certify that the statements made in the report are correct and this _Repair conforms to the rules of tile ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed i 24" Engineering ProgramsfManager Date c-X6. aS. Certrflcate ofAuthorization Number. NA Owner or Owner's designee, Title ExpirationDate: NA _Cq _ bf zr CERTiFC'a TE OF INSER VICE INSPECTION p 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and (lie state or province of TEXAS and employed by l4AR TFORD STEAJ f BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this O wnter's Report during the period of February,1 2003 to Jut 31 204l and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASASE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owtner's Report. Furthtermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or propert damage or a los of an) kind aris gfrom or connected wiith this inspection. em Commissions Texas 1080 Dale _ 6 (. 9 nwetotr'ssignature VNational Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A Appili Expiration date: NIA Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Date: 06/24/04 Sheet I of 1 Unit: 1 NIS-2 Report number: IRC04-006 Identification of System: RC N-5 No.: RC-1-1645 cable Construction Code: 1971 Ed. S73 Add. Code Case(s): 1484, 1528, 1493-1, 1355, Code Cases: N/A NB-4643 Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: STEAM GEN TBX-RCPCSG-02 Westinghouse 2192 1 National Board No.: W18586 Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Repair Yes 3-02-318223-01 Applicable Manufacturer's Data Reports to be attached: Description of work: Installed mechanical plugs and expanded tube sleeves Tests Conducted: Hlydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CER TIFICA lTEi OF COAIPLANCE 1e certain that the statements made in the report are correct and this _epair conforms to the rules of the ASMJ!? Code, Section XI. Signed Repair or Replacenent Tjpe Code Symbol Stamp: NA Engineering Programs Manager Date o 6 -_2 1 -. c !;c, Certificate of Authorization Number: NA Expiration Date: NA Ow"er or Owners designee, v te -5 V. ot-CERTIFICA TE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIAR TFORD STEA41, BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February), 2003 to July31, 2004 and state that to the best of my knowledge and belief the Ottter has performed examinations aid taken corrective measures described in this Owner's Report in accordance with the requirements of the ASHME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury orpropert' damage or a loss of an.y kind arisifffrom or connected w'ith this inspection. t_ Commissions Texas 1080 Date I (OY lnspectors signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: NIA Appil4 Expiration date: N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Date: 06/24/04 Sheet I of 1 Unit: I NIS-2 Report number: IRC04-007 identification of System: RC N-5 No.: RC-1-1645 cable Construction Code: 1971 Ed. S73 Add. Code Case(s): 1484, 1528, 1493-1, 1355, Code Cases: NMA NB-4643 Name of Component: Component Identification: Other Identification: STEAM GEN TBX-RCPCSG-02 National Board No.: W18586 Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Repair Yes Name of Manufacturer: Serial Number: ASME Code Class: Westinghouse 2192 1 4-04-152842-00 Applicable Manuracturer's Data Reports to be attached: Description of work: Removed plugs Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure ipsi) and Temperature (deg F) as applicable: N/A CERTIFICA TB OF COMPLIANCE We certify that the statements made in the report are correct and this Repair conforms to the rules of the ASME Code, Section Xl. Repair or Replacement Type Code Synbol Stamp: NA Signed -Engineering Programs Mfanager Date 0 I/S-o Z Certificate ofAuthorization Number: NA owneror Owner's designee TitleExiaonDt:N s.' CERTIFICATE OFINSER'ICE INSPECTION ExpirationDate: NA I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 1IAR TFORD STECAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to Jiul 31, 2004 and state that to the best of my knowfledge and belief the Owner has performted eraminations and taken corrective measure. described in this Owner's Report in accordance with the requirements of the AS1ME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Ownetr's Report. Furthermore ieither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arisingfrom or connected with this inspection. Commissions Texas 1080 Date 12.3 ( Insp r's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N(A v Appili Expiration date: NIA Date: 06/24/04 Sheet I of I Unit: 1 NIS-2 Report number: IRC04-008 Identification of System: RC N-5 No.: RC-1-1645 cable Construction Code: 1971 Ed. S73 Add. Code Case(s): 1484, 1528, 1493-1, 1355 Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: STEAM GEN National Board No.: W18587 Year Built: 1978 TBX-RCPCSG-03 Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Repair Yes 3-02-31 8224-01 Westinghouse 2193 1 Applicable Manufacturer's Data Reports to be attached: Installed mechanical plugs and expanded tube sleeves Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMIPLIANCE 1We certifi' that the statements made in the report are correct and this Repair conforms to the rules of the ASME Code, Section YI. Repair or Replacement Type Code Symbol Stamp: NA EnginteeringProgramsAfanager Date o C-s.2,s-u Certificate ofAuthorization Number: NA Signed Owner or Owner's designee, Tie Title__ion Date. 1_1 V. ZV 4, CERTI F CATE OF INSER VICE INSPECTION Expiration Date: NA I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIAR TFORD STE-filf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februar 1, 2003 to Jtil 31, 2004 , and state that to the best of m) kitovledge and belief thte Ovner has performted examinations ant taken corrective measures described in this Owner's Report in accordance with the requirements of the ASAIE Code, Section XI. By signing this certificate neither the Inspector nor his employ er makes anry warrant, expressed or implied, concerning the examinations and corrective measures described in this Ownier's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arisingfront or connected with this inspection. Commissions Texas 1080 Date

41.

I9Joe. inspecor'ssignature NYational Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A Applii Expiration date: N(A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Date: 06/24/04 Sheet I of I Unit: I NIS-2 Report number: 1RC04-009 Identification of System: RC N-5 No.: RC-1-1645 Iable Construction Code: 1971 Ed. S73 Add. Code Case(s): 1484, 1528, 1493-1, 1355 Code Cases: N/A Name of Component: Component Identification: Other Identification: STEAM GEN National Board No.: W18587 Year Built: 1978 TBX-RCPCSG-03 Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Repair Yes 4-04-1 52843-00 Name of Manufacturer: Serial Number: ASME Code Class: Description of work: Westinghouse 2193 I Applicable Manuracturer's Data Reports to be attached: Removed plugs Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A We certif3 that the statements made in the report at CER TIFICA TE OF COMPLIANCE

  • e correct and this Repair conforms to the rules of the ASAE Code, Section XI.

Repair or Replacement Type Code Symbol Stamp: NA Engineering Programs Manager Date 06 - J HA Certificate ofAuthorization Number: NA Signed Owner or Owner's designee, Title a ' ha 4,/f, & CERTIFICATE OF INSERRVIcE INSPECTION pir Date: NA 1, the undersigned, holding a valid commission issued by the Nationtal Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 11ARTFORD STEA1M BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Februaa.1, 2003 to Jull 31, 2004 , aid state that to the best of my kitotledge and belief the Owtner has perfornmed eraminatiots and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signintg this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owniter's Report. Furthermore, neither the Inspector nor his employer shall be liable in ant mannerfor ante personal injury or property dantage or a loss of any kind arisin from or connected with this inspection. u-Commissions Texas 1080 Date G 121 U°Y. S pector's signature National Hoard, State, Prorinee, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: NIA Appio Expiration date: N/A Date: 06/24104 Sheet 1 of 1 Unit: I NIS-2 Report number: 1RC04-010 Identification of System: RC N-5 No.: RC-1-1645 -able Construction Code: 1971 Ed. S73 Add. Code Case(s): 1484,1528, 1493-1, 1355 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: STEAM GEN TBX-RCPCSG-04 National Board No.: W18588 Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Year Built: 1978 Repair Yes 3-02-318225-01 Westinghouse 2194 1 Remarks: Applicable Nianuracturer's Data Reports to be attached: Installed mechanical plugs and expanded tube sleeves Tests Conducted: Hydrostatic, Pneumnatic, Nominal Operating Pressure, Other,,ith Test Pressure (psi) and Temperature (deg F) as applicable: NMA CERTIFICATE OF COMlPLIANCE We certify that the statements made in the report are correct and this Repair conforms to the rules of the ASMI ' Code, Section YX. Signed Repair or Replacement Type Code Symbol Stamp: NA Engineering Programs AManager Date 0 C J`-n S Certificate ofAuthorization Number: NA Owner or Owner's designee, Title -piration Date. NA If *' _8£t> CElRTIFICATE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEYAS and employed by HIAR TFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to Juli' 31, 2004 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMfE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Or,,er's Report. Furthermore neither the Invpector nor his employer shall be liable in any mannerfor any persotual injury or property damage or a loss of any kind arging from or connected with this inspection. C_ commissions Texas 1080 Date _ k9 Inspector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report Repair Organization P.O. No., Job No., etc.: TXU Identification of Type Code Symbol Stamp: N/A Authorization No.: N/A Applicable Constructio Expiration date: NIA Code Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Date: 06/24/04 Sheet I of I Unit: I number: 1RC04-011 System: RC N-5 No.: RC-1-1645 on Code: 1971 Ed. S73 Add. Case(s): 1484,1528, 1493-1, 1355 Name of Component: Component Identification: Other Identification: STEAM GEN TBX-RCPCSG-04 National Board No.: W18588 Year Built: 1978 Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Remarks: Repair Yes 4-04-152844-00 Name of Manufacturer: Serial Number: ASME Code Class: Description of work: Westinghouse 2194 1 Applicable Nlanuracturer's Data Reports to he attached: Removed plugs Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMPLIANCE 'e correct and this Repair conforms to the rules of the ASME Code, Section XI. D,:- A ^~" 1We certify that the statements made in the report ar SgdEgr VT n Ieirrjrrocm g Dt Type Code SymbolStamp: NA Signed H _Engineering Programs Manager Date - > S-5 Certirfcate ofAuthorization Number: NA Owner or Owner's designee, Title xp*rt Dat NA S V' Zl-e ,-a CERTIFIlCATE OF INSERVICE INSPECTION piraton ae: I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by HIARTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February, 12003 to Jiej 31, 2004 atd state that to tie best of my krosledge and belief thie Owner has performed exraminations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMIE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes art), warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in aty mannerfor any personal injurer or property damage or a loss of any kind arisin ront or connected with this inspection. e Commissions Texas 1080 __ Date fZ, O'f C ector's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet 1 of 1 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1SI04-001 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: St Type Code Symbol Stamp: N/A N-5 No.: SI-1-1644 Authorization No.: N/A Applicable Construction Code: 1977 Ed., W79 Add. Expiration date: N/A Code Case(s): 1644-6 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: SNUBBER SI-1-067-701 -C41 K Pacific Scientific 12338 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1981 Replacement Yes 1-03-150447-00 Applicable Manuracturer's Data Reports to be attached: 1 Replaced snubber pin Tests Conducted: HIydrostatic, Pneuintatic, Nominal Operating Pressure, Other, uith Test Pressure (psi) and Temperature (deg r) as applicable: N/A CERTIFICATEr COF IPlA N CE

  • e certijj that the statements made in the report are correct and this Replacement contforms to the rules of the ASM4E Code, Section YI.

""Aw Repair or Replacement Type Code Symbol Stamp: NA Signed Etngineering Programs Afanager Date o 6-t-. c 9 CertflNateofAuthorizationNumber:NA Owner or Owiter's designee, Title ExiainDt:N Os neorO~erser nil CERTIFICIATE OF INSER VICE INSPECTION ExpirationDate: NA A, the undersigned, holding a valid commission issued by the National Board of Reiler and Pressure Vessel Inspectors and the state or province of TFXAS and employed by 11HARTFORD STEAM BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of Febr r', 2003 to July' 31, 2004 a0nd state that to the best of my knowledge and belief, the Oivner has performed examinations and taken corrective measures described in this On'ner's Report in accordance with the requirements of the ASAME Code, Section XI By signing this certificate neither the Inspector nor his employer makes any w'arranty, expressed or implied, concerning the examinations and corrective measures described in this Ownver's Report. Furthermore neither the Inspector nor his employer.shal be liable in any mannerfor any personal injury or property damage or a loss of arty kind asin r or connected wvith this inspection. I t Commissions Teas 1080 Date Endrseent Intctor's signature National Board, State, Province, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06124/04 Sheet 1 of I Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1SW04-001 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: SW Type Code Symbol Stamp: N/A N-5 No.: SW-1-1634 Authorization No.: N/A Applicable Construction Code: 1974 Ed. S74 Add. Expiration date: NIA Code Case(s): N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N-597 Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: PIPING National Board No.: N/A Year Built: 1984 BRP SW-1-AB-003 Brown & Root Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Repair/Replacement Yes 4-02-144934-00 N/A 3 Applicable Manufacturer's Data Reports to be attached: Weld repaired wall thinning on Class 3 pipe. Evaluation per Code Case N-597, Replaced elbow. Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICATE OF COMPLIANCE lVe certify that the statements made in the report are correct and this Repair/Replacement zM,.,/ /-, Repair or Replacement Signed G EngineeringPrograms fanager Date oaC - J S -- 0,44I conforms to the rules of the ASAME Code, Section XI. Type Code Symbol Stamp: NA Certif cate ofAuthorization Number: NA Owner or Owrner's designee, 77tle -at, V d

  1. -of~. 4 CERTIFICATE OFINSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by 1IARTFORD STEAM1 BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1', 2003 to Jui' 31, 2004, and state that to the best of my knowledge and belief the Owner has performed examinations and taken corrective measures described in this Owvner's Report in accordance with the requirements of the ASAIE Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Ownver's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any per.sonal injury or property damage or a lo.s of any kind arisiiffront or connected with this inspection. Commissions Texas 1080 Date _ tspetor's signature National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A Appli Expiration date: N/A Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Date: 06/24/04 Sheet I of I Unit: 1 NIS-2 Report number: 1SW04-002 Identification of System: SW N-5 No.: SW-1-1634 cable Construction Code: 1974 Ed. S74 Add. Code Case(s): NIA Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: PIPING BRP SW-1-DG-004 National Board No.: N/A Repaired I Replaced / Replacement: ASME Code Stamped: Authorizing Document: Year Built: 1984 Repair Yes 4-04-154182-00 Brown & Root Serial Number: ASME Code Class: Description of work: N/A 3 Weld build up wastage on Class 3 pipe Remarks: Applicable Mstanutacturer's Data Reports to be attached: Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICATE OF COAPLIANCE 1'e certif f/tat the statements made in the report are correct and this Repair conforms to the rules of the ASME Code, Section XI. Signed Repair or Replacement Type Code Symbol Stamp: NA E.ngineering Programs Manager Date o 6, -b-e 4.6 Certificate ofAuthorization Number: NA s oO e rdegne CERTIFICATE OFINSER VICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by hMARTFORD STEIl BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of rebruar 1, 2003 to July31, 2004 and state that to the best of m) knowledge and belief the Otvner has performed examinatiots and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind a *singfrom or connected with this inspection. Ccommissions Texas 1080 Date ( Inspector's signature National Board, State, Provlnce, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet I of 1 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: ISW04-003 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: SW Type Code Symbol Stamp: N/A N-5 No.: SW-1-1634 Authorization No.: N/A Applicable Construction Code: 1977 Ed. S77 Add. Expiration date: N/A Code Case(s): N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: VALVE National Board No.: N/A Year Built: 1978 Component Identification: 1SW-0373 Repaired / Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: TRW Mission Authorizing Document: 3-02-321550-01 Serial Number: 1-4302 Remarks: ASME Code Class: 3 Applicable Manturacturer's Data Reports to be attached: Description of work: Replaced bolted valve. New SN D2829, RR 30219. Replaced bolting. Tests Conducted: Hf) drostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CF.RTIFClcf TE OF C'OMPLIANCE We certif)y that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed E ngineering Programs Mfanager Date 0 CH_- c ot Certificate ofA uthorization Number: NA X VP.z*c, /k-o erdged CERTIFICATE OF INSER VICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by HIA R TFORD STE1,1 ¶ BOILER INSP. A ND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February q , 2003 to Jide' 31, 2004. and state that to the best ofmy kniowtledge and belief, the Owner has performed examinations atd taken corrective measures described in this Owner's Report in accordance with the requirements of the ASAIE Code, Section YI. By signing this certificate neither the Inspector nor his employer makes any warrant), expressed or implied, concerning the examinations and corrective measures described it this Og'ner's Report. Furthermrore, neither the in.spector nor his ettploy er shall be liable in an) mannerfor any personal injury or property damage or a loss of any kind arisrngfronm or connected with this inspection. C Commissions Texas 1080 Date VIZ! Lo Inspector's signature National Board, State, Pror-nee, and Endorsements

RI 30215 FORM NPV-1 CERTFICATE HOLDERS' DATA REPORT FOR NUCLEAR PUMPS OR VALVES-As Required by the Provisions of the ASME Code, Section III, Division I Pg.1 of 2

1.

Manufactured and certified by CRANE Nuclear. Inc.. 860 Remington Boulevard. Bolingbrook. IL 60440 00" OM e0ess f NP T CrW t't tr)

2.

Manufactured for TXU Generation Company LP PO Box 20 Daflas. TX 75221-0020 Iflane at at r VraUw)

3.

Location of installation TXU Generation Company IP Comanche Peak SES 6322 N. FM-56 Glen Rose, TX 76043 (rt"am wO ans)

4. Model No.. Series No.. or Type G15 BAF-SPL Drawing CB03293 Rev.

B CRN N/A S. ASME Code. Section 1I1. Division 1: 1977 Summer 1977 3 4acnI(0OO cats) (emu) N/A (cooIt C.& M.j

6.

Pump or valve Duo-Chek Valve Nominal inlet size 24 t'W) Outlet size 24 (EL)

7.

Material: (a) valve Body 58148 C9s200 (b) pump Casting N/A (a) Cert. Holder's Serial No. (b) Natl Board No. Bonnet WA Cover N/A (C) Body/Casing Serial No. Disk 58148 C95200 Bolting N/A (d) Bonnet/Cover Serial No. Bolting SS 164 N04400 (e) Disk Serial No. 02829 NMA D32831 N/A 'I-,' lo, "I" I'll D2833 L 02834 .I.. ,1

  • Supplemental information in trie form of hsts. sketches. or drawings may be used provided (1) size is 8 h x 11. (2) information in items 1 through 4 on thIs Data Report is incluoed on eachi sheet. (3) each sneet is numbered and the number of sheets is recoroeo at the top of this form.

This form (E00037) may be obtained from the Order Dept. ASME. 22 Law Dnve. Box 2300. Fairfield. NJ 07007.2300.

e2 S C 3 -t 9' /61vcY '-0Q3 FORM NPV-1 (Back) - Pg. 2 of 2 Certificate Holders Serial No. 02829 8 Design conditions ISO (pressure Psi 170 (temperature)

  • F or valve pressure class (1)
9.

Cold working pressure 190 Psi at 100'F

10.

Hydrostatic test 300 Psi. Disk differential test pressure 215 Psi

11.

Remarks: SO 22889-01 CERTIFICATION OF DESIGN Design Specifications certified by C. E. Beckett P.E. State TX Reg. No. 61793 Design Report certified by NIA P.E. State N/A Reg. No. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this pump or valve conforms to the rules for construction of the ASME Code, Section 1II, Division 1. N Certificate of Authorization No. N.2899 Expires Sectember 24. 2005 Date 04/06104 Name CRANE Nuclear. Inc Signed G faA (N Cendcate Moerw) (autnoraeo reasenta(NeI Garrett Petrovicn CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois and employed by HSBCT of Hartford. CT Have inspected the pump. or valve. described in this Data Report on 04/06104 and state that to the best of my knowledge and belief, the Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code. Section IlIl. Division 1. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the Component described in this Data Report Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection. Date 04/06/04 Signed Commissions R nonzbr Nuar i sonea Robert Rainey IL 932 (Nart. Ba {#-I on orswnentsi ana seat. or vreo And no I (1) For manually operated valves only.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company IP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: NIA Authorization No.: N/A AppIli Expiration date: N/A Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section Xi Date: 06/24/04 Sheet I of 1 Unit: 1 NIS-2 Report number: 1SW04-004 Identification of System: SW N-S No.: SW-1-1634 cable Construction Code: 1977 Ed. S77 Add. Code Case(s): N/A Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: VALVE National Board No.: N/A 1 SW-0374 TRW Mission 14650 Repaired / Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Replacement Yes 3-02-321551-01 Applicable Manufacturer's Data Reports to be attached: 3 Description of work: Replaced bolted valve. New SN D2830, RR 30232. Replaced bolting. Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICA TE OF COMIIPLIANCE 11'e certify that the statements made in the report are correct and this _ Replacement conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed a& i Enginteeritg Programs Maniager Date 0.( -_, (-. , y, Certificate ofAuthorization Number: NA vwreFor Owner'sdesignee,Tite CERT CATEOFNSERVCENSPECTON Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by lIARTFORDSTEtI AfBOILER INSP. AIND INS. CO. of CONNECTICUThave inspected the components described in this Owter's Reportdu ring theperiodof February), 2003 to Juli' 31, 2004 , aid state tlat to tie best of my kntoledge and belief, the Ovter has performed eramitatiots atd taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Onier's Report. Frrtilermore, neither the Inspector nor his employer shall be liable in any mannerfor aty personal injury orproperty damage or a lo.s of aeykindy a ingfront or connected with this inspection.

A

(.A Z Commissions Texas lO80 Date 4 /Zn'O Ipco' sint.eNtoal.ad.Sa...olc, n noreet signature National Board, State, Province, and Endorsements 9.-

I<Z fs 1 c q FORM NPV-1 CERTIFICATE HOLDERS' DATA REPORT FOR NUCLEAR PUMPS OR VALVES* As Required by the Provisions of the ASME Code, Section 111, Division 1 Pg. 1 of 2

1.

Manufactured and certified by CRANE Nuclear. Inc., 860 Remington Boulevard. Bolingbrook. IL 60440 (nfwm amd acorns of NOT Conificaa dmco)

2.

Manufactured for TXU Generation Comoany LP PO Box 20 Dallas. TX 75221.0020 (na ne ado acdrns at DIurraser)

3.

Location of installation TXU Generation Comoany LP Comanche Peak SES 6322 N. FM.56 Glen Rose. TX 76043 (nami amnd acotns)

4.

Model No.. Series No.. or Type G15 BAF.SPL Drawing C803293 Rev. B CRN N/A N/A

4)

(Coae Case no.)

5.

ASME Code. Section IlIl. Division 1: 1977 Summer 1977 3 (eotdon) (addfida oate) (am

6.

Pump or valve Duo-Chek Valve Nominal inlet size 24 (in.) Outlet size 24 (In.)

7.

Material: (a) valve Body S8148 C95200 (b) pump Casting N/A (a) (b) Cert. Natl Holder's Board Serial No. No. Bonnet WA Cover N/A (c) Body/Casing Serial No. Disk SB148 C95200 Bolting N/A (d) BonneflCover Serial No. Bolting S8164 N04400 (e) Disk Serial No. D2830 N/A D2B32 N/A D2B35 & D2836 I-,' ,-11 11-1 I'll

  • Supc~emental information in the form of lists. sketches. or crawings may be used provided (1) size is ft 3 X t11. (21 information in items I through 4 on this Data Report is inciuced on each sneet. (3) each sheet is numbered and the number of sheets is recorded at the top of this form This form (E00037) may be obtained from the Order Dept. ASME. 22 Law Drive. Box 2300. Fairfield. NJ 07007-2300

1S1v0- O-1-f FORM NPV-1 (Back) - Pg. 2 of 2 Certificate Holders Serial No. 02830 8 Design conditions 150 (pressure PsI 170 'F or valve pressure class -____ (1) (temperature)

9.

Cold working pressure 190 Psi at 100*F

10.

Hydrostatic test 300 Psi. Disk differential test pressure 215 Psi 1 1. Remarks: SO 22889-01 CERTIFICATION OF DESIGN Design Specifications certified by C. E. Beckett P.E. State TX Reg. No. 61793 Design Report certified by N/A P.E. State N/A Reg. No. N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this pump or valve conforms to the rules for construction of the ASME Code, Section 1ii. Division 1. N Certificate of Authorization No. Date 04108104 Name N-2899 Expires September 24. 2005 Signed -t.7 CRANE Nuclear, Inc. (N t eebcate Hrolcer) (N C M ~ !e acer), ."Tautnon $(rre vrese tuatve) Jerome A. Kurowski. P.E. CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Illinois and employed by HSBCT of Hartford. CT Have inspected the pump, or valve, described in this Data Report on 04/08104 and state that to the best of my knowledge and belief, the Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code, Section 1II, Division 1. By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied. concerning the Component described in this Data Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection. Date 04108104 Signed 6 11 7 Commissions (Authoned Nudear t ofr) Robert Rainev IL 932 (Nall. So. (nd. endorsemlents) and state or oro~ Anil no.) (1) For manually operated valves only.

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A Applie Expiration date: NIA Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Date: 06/24/04 Sheet I of 1 Unit: 1 NIS-2 Report number: 1SW04-005 Identification of System: SW N-5 No.: SW-1-1634 cable Construction Code: 1974 Ed. S76 Add. Code Case(s): N/A Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: STRAINER CP1 -SWSRPL-01 Leslie Company 76-4819-2-1 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1977 Repair Yes 4-03-1 50058-00 Applicable Manufacturer's Data Reports to be attached: 3 Weld built up strainer body and bonnet on 3/4"1ine Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: NOP, Pressure: NOP, Temp.: NOT CERTIFICA TE OF COAMPLIANCE We certify that the statements made in the report are correct and this Repair conforms to the rules of the ASME Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA Signed d -Z _Engineering Programs Manager Date 0 6; -2 , e Certifrcate ofAuthorization Number: NA Owner or Owner's designee, Title Erpiration Date: NA 5-: g/ f CER TIF1c'A TE OF INSER VICE INSPECTION D 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by HIARTFORD STEAMl BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February I, 2003 to dt' 31, 2004

  • andstate that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMfE Code, Section YI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described ii this Ow'ner's Report. Furthermore neither the Inspector nor his employer shall be liable in an)' mannerfor any personal injury or property damage or a loss of any kind arisiefroin or connected with this inspection. .MAtL r Commissions TexaslO80 Date _1/ loqV 6 Spector's sign a-ture National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06124/04 Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Sheet 1 of I Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: 1 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: IVA04-001 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: VA Type Code Symbol Stamp: NIA N-5 No.: VA-1-1605 Authorization No.: N/A Applicable Construction Code: 1974 Ed. W75 Add. Expiration date: N/A Code Case(s): 1621-1 Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: VALVE National Board No.: N/A Year Built: 1978 Component Identification: 1-HV-5540 Repaired / Replaced / Replacement: Replacement Other Identification: ASME Code Stamped: Yes Name of Manufacturer: Posi-Seal International Authorizing Document: 3-02-339449-01 Serial Number: 14758-1-C Remarks: ASME Code Class: 2 Applicable Manuracturer's Data Reports to be attached: Description of work: Tack weld pins to disc Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COAMPLIANCE We certify that the statements made in the report are correct and this Replacement conforms to the rules of the ASME Code, Section Xl. .9 Repair or Replacement Type Code Symbol Stamp: NA Signed b Engineering Programs Afanager Date a 6--Z-Certificate ofAuthorization Number: NA (JuH'ner or Ow ner's designee, TitleE or e-dsgeTt CERTIFICATE OF INSER VICE INSPECTION Expiration Date: NA 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by IARTFORD STEAMf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February)1, 2003 to Jui' 31, 2004 and state that to the best of my knowledge and belief the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASM1fE Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arisingfione or connected with this inspection. P'f (if CA Commissions Texas 1080 Date _ LIoi6._ National Board, State, Prorince, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Date: 06/24/04 Qhfta I of I Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Unit: I Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 NIS-2 Report number: 1VA04-002 Repair Organization P.O. No., Job No., etc.: TXU Identification of System: VA Type Code Symbol Stamp: N/A N-5 No.: VA-1-1605 Authorization No.: N/A Applicable Construction Code: 1974 Ed. W75 Add. Expiration date: N/A Code Case(s): 1621-1 Applicable Edition of ASME Section Xl Utilized for Repairs or Replacements: 1986 Edition ASME Section XI Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: VALVE 1-HV-5541 National Board No.: N/A Repaired / Replaced / Replacement: ASME Code Stamped: Authorizing Document: Year Built: 1978 Replacement Yes 3-02-339450-01 Posi-Seal International 14758-1-A 2 Remarks: Applicable Manufacturer's Data Reports to be attached: Tack weld pins to disc, replaced flange fasteners on BRP-VA-1-RB-002 Tests Conducted: Hydrostatic, Pneumatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg F) as applicable: N/A CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement Signed ,gt;Z Repair or Replacement Engineering Programs Manager Date o C-j.. o &- conforms to the rules of the ASME Code, Section YI. Type Code Symbol Stamp: NA Certificate of Authorization Number: NA Onwner or Owner's designee. Title Expiration Date: NA vCERTIFICATE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by IfA RTFORD STEAMlf BOILER INSP. AND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to Jul.i 31, 2004 , and state that to tie best of my knowledge and belief the Ownier has performed examinations and taken corrective measures described in this Owner's Report in accordance vith the requirements of the AS/fE Code, Section YI. By signing this certificate neither the Inspector nor his employer makes any warrants expressed or implied, concerning the examinations and corrective measures described in this Owiner's Report. Firthermore, neither the Inspector nor his employer shall be liable in atn mannerfor any personal injitry or property damage or a toss of any kind arising ft or connected with this inspection. Commissions Texas 1080 Date 4_o n tor's signature National Board, State, Provinee, and Endorsements

FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT Owner: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Plant: Comanche Peak Steam Electric Station (CPSES) Farm Rd. 56, 5 Miles North of Glen Rose, Texas 76043 Work Performed by: TXU Generation Company LP P.O. 1002, Glen Rose, Texas 76043 Repair Organization P.O. No., Job No., etc.: TXU Type Code Symbol Stamp: N/A Authorization No.: N/A X Appilh Expiration date: NIA Date: 06/24104 Sheet 1 of I Unit: 1 NIS-2 Report number: IVA04-003 Identification of System: VA N-5 No.: VA-1-1605 .able Construction Code: 1974 Ed. W75 Add. Code Case(s): 1621-1 Applicable Edition of ASME Section Xi Utilized for Repairs or Replacements: 1986 Edition ASME Section Xl Code Cases: N/A Name of Component: Component Identification: Other Identification: Name of Manufacturer: Serial Number: ASME Code Class: Description of work: VALVE 1-HV-5562 National Board No.: N/A Repaired I Replaced I Replacement: ASME Code Stamped: Authorizing Document: Remarks: Year Built: 1978 Replacement Yes Posi-Seal International 14758-1 -B 3-02-339453-01 Applicable Manuracturer's Data Reports to be attached: 2 Tack weld pins to disc Tests Conducted: Hydrostatic, Pneumnatic, Nominal Operating Pressure, Other, with Test Pressure (psi) and Temperature (deg r) as applicable: N/A CER TIFICA TE OF COMIPLIANCE We certify that the statements made in the report at Signed -e correct and this Replacement conforms to the rules of the ASMIE Code, Section XI. Repair or Replacement Type Code Symbol Stamp: NA .Engineering Programs M4anager Date a 6 -.. (, Certificate ofAuthorization Number: NA On7erorrOwner's designee, Title Expiration Date: NA 5.re ~- 4~'/ 4 CERTIFICA TE OF INSER VICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or province of TEXAS and employed by IHARTFORD STEAMll BOILER INSP. Af ND INS. CO. of CONNECTICUT have inspected the components described in this Owner's Report during the period of February 1, 2003 to July 31, 2004 arid state that to the best of nty knowledge and belief the Ovner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owvner's Report. Furthermore neither the Inspector nor his employer shall be liable in any mannerfor any personal injury or property damage or a loss of any kind arising rom or connected with this inspection. C____ Commissions Tevas 1080 Date -' netor's signature National Board, State, Province, and Endorsements}}