ML042160117

From kanterella
Jump to navigation Jump to search
Registration Information for the Storage of Spent Fuel from Unit 1 at the Independent Spent Fuel Storage Installation
ML042160117
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/30/2004
From: Nunn D
Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR
Download: ML042160117 (2)


Text

J\\

SOUTHERN CALIFORNIA EEDISON An EDISON INTERNATIONALS Company Dwight E. Nunn Vice President July 30, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk, Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 1, 2 and 3 Gentlemen:

In accordance with the registration requirements given in 10 CFR § 72.212(b)(1)(ii),

Southern California Edison (SCE) hereby submits the following registration information for the storage of spent fuel from Unit 1 at the Independent Spent Fuel Storage Installation of the San Onofre Nuclear Generating Station (SONGS).

Licensees' Names:

Licensee's Address:

Reactor License Number:

Docket Numbers:

Cask Certificate Number:

Cask Model Number:

Southern California Edison Company San Diego Gas & Electric Company City of Anaheim, California City of Riverside, California 5000 Pacific Coast Highway San Clemente, CA 92672 DPR-13 NPF-10 NPF-15 50-206 50-361 50-362 72-41 (SONGS-1)

(SONGS-2)

(SONGS-3)

(SONGS-1)

(SONGS-2)

(SONGS-3)

(SONGS ISFSI)

CoC 1029, Amendment 0, February 5, 2003 Standardized Advanced NUHOMS8 System Cask Identification Nos:

Canister Number:

Module Number:

S12208MVDSC014 S1232208AHSM010 P.O. Box 128 San Clemente. CA 92674-0128 949-368-1480 Fax 949-368-1490 JVm5s6

Document Control Desk July 30, 2004 For additional information concerning the storage of spent fuel under this general license, please contact Mr. D. F. Pilmer, Licensing Manager, at 949-368-1486.

Sincerely, cc: B. S. Mallett, NRC Regional Administrator, Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 W. C. Huffman, NRC Project Manager, San Onofre Unit 1 S. C. O'Connor, NRC Project Manager, San Onofre ISFSI C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3