ML042110310
| ML042110310 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/26/2004 |
| From: | Nunn D Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML042110310 (1) | |
Text
,- 'TUlSOUTHERN CALIFORNIA ED SON Vice President An EDISON IP.TERMATIONAL' Company July 26, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Docket Nos. 50-361 and 50-362 Request For Additional Information San Onofre Nuclear Generating Station Units 2 and 3 Gentlemen:
Southern California Edison (SCE) submitted a request for changes to the Physical Security Plan (PSP) for the San Onofre Nuclear Generating Station (SONGS) on April 28, 2004. Subsequently, the U. S. Nuclear Regulatory Commission (NRC) Staff has begun a review of the SONGS revised PSP that has resulted in a request for additional information (RAI) by letter from Brian Benney (NRC) to Dwight Nunn (SCE) dated June 24, 2004. The RAI covers the Staffs review of chapters 1 through 9 of the SONGS revised PSP. SCE's response to the RAI is given in the enclosure to this letter.
Note that the enclosure to this letter contain safeguards information as defined by 10 CFR § 73.2. This transmittal letter may be decontrolled upon separation from the enclosure.
Very truly yours, Enclosure cc:
B. S. Mallett, Regional Administrator, NRC Region IV G. M. Tracy, Director, Division of Nuclear Security Brian Benney, NRC Project Manager, Security Plan Review Team B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector SAFEGUARDS INFORMATION P.O. Box 128 NOTICE: DECONTROLLED upon separation from the attachments.
San Clemente, CA 92674-0128 949-368-1480 Fax 949-368-1490