Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 July 26, 2004 A SCANA COMPANY RC-04-0113 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Dear Sir/Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 INTERIM RESPONSE TO NRC BULLETIN 2004-01 INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE CONNECTIONS AT PRESSURIZED-WATER REACTORS
Reference:
Stephen A. Byrne letter to document Control Desk, RC-04-01 00, June 11, 2004 On May 28, 2004, the U.S. Nuclear Regulatory Commission (NRC) issued NRC Bulletin 2004-01 to request that utilities provide information regarding Alloy 82/182/600 materials used in the fabrication of pressurizer penetrations and steam space piping connections at their plants.
Information was requested related to the materials, the methods of inspection and repair, and individual inspection schedules.
Licensees were requested to provide a response within 60 days of issuance of the bulletin. If a licensee could not provide the information or could not meet the requested completion date, they were required to submit a written response indicating this within 15 days of the date of the bulletin.
South Carolina Electric & Gas Company (SCE&G) determined that all necessary actions to provide the requested information for VCSNS could not be achieved within 60 days; therefore, the referenced letter of June 11, 2004 was submitted to address the 15-day response action required by the bulletin.
Subsequent to the referenced submittal during a telephone discussion between the VCSNS NRC Project Manager, NRC reviewer, and SCE&G, the NRC directed that SCE&G submit an interim response providing available-VCSNS information in regards to the Bulletin items. The attached provides the currently available inspection information. As noted by the referenced response, SCE&G intends to provide a full response to the bulletin in as timely a manner as is possible. SCE&G expects to provide the requested response by November 17, 2004 Should you have questions, please call Mr. Ron Clary at (803) 345-4757.
I certify under penalty of perjury that the foregoing is true and correct.
7/z6h
/A vG__
Executed on Stephen A. Byrne Senior Vice President, Nuclear Operations SCELG I Virgil C.
Summer Nuclear Station R. 0. Box 08. Jenkinsville, SouAh (arolna 29065.T (803) 345.5209
- www.scanoa.om
Document Control Desk Letter O-C-04-1719 RC-04-01 13 Page 2 of 2 JT/SAB/mb c:
N. 0. Lorick N. S. Cams T. G. Eppink R. J. White W. D. Travers K. R Cotton NRC Resident Inspector K. M. Sutton NSRC RTS (0-C-04-1719)
File (815.02)
DMS (RC-04-01 13)
Document Control Desk Letter Attachment 0-C-04-1719 RC-04-01 13 Page 1 of 4 SCE&G RESPONSE TO USNRC BULLETIN 2004-001 FOR V.C. SUMMER NUCLEAR STATION (VCSNS)
Requested Information from Bulletin 2004-001 issued May 28, 2004:
(1) All subject PWR licensees are requested to provide the following information within 60 days of the date of this bulletin.
(a) A description of the pressurizer penetrations and steam space piping connections at your plant.
At a minimum, this description should Include materials of construction (e.g.,
stainless steel piping and/or weld metal, Alloy 600 piping/sleeves, Alloy 82/182 weld metal or buttering, etc.), joint design (e.g., partial penetration welds, full penetration welds, bolted connections, etc.), and, in the case of welded Joints, whether or not the weld was stress-relieved prior to being put Into service.
Additional Information relevant with respect to determining the susceptibility of your plant's pressurizer penetrations and steam space piping connections to PWSCC should also be Included.
RESPONSE (1)(a):
The requested information is currently being researched through the NSSS supplier (Westinghouse) for V. C. Summer Nuclear Station.
As previously stated in our 15-day response to this bulletin, SCE&G will provide this information in a subsequent response by November 17, 2004.
(b)
A description of the Inspection program for Alloy 821182/600 pressurizer penetrations and steam space piping connections that has been Implemented at your plant. The description should Include when the inspections were performed; the areas, penetrations and steam space piping connections inspected; the extent (percentage) of coverage achieved for each location which was inspected; the Inspection methods used; the process used to resolve any Inspection findings; the quality of the documentation of the Inspections (e.g., written report, video record, photographs); and, the basis for concluding that your plant satisfies applicable regulatory requirements related to the integrity of pressurizer penetrations and steam space piping connections.
If leaking pressurizer penetrations or steam space piping connections were found, Indicate what followup NDE was performed to characterize flaws In the leaking penetrations.
Document Control Desk Letter Attachment O-C-04-1719 RC-04-01 13 Page 2 of 4 RESPONSE (1)(b):
The inspection program implemented at VCSNS consists of the following entities:
- 1. ASME Section Xl ISI examinations have been conducted, including those volumetric, surface, and visual examinations addressed via the ASME Code.
The ASME Code ISI volumetric and surface examinations conducted, for the components addressed in the referenced bulletin, are as follows:
COMPONENT A' PRESS. SAFETY A' PRESS. SAFETY A' PRESS. SAFETY A' PRESS. SAFETY B' PRESS. SAFETY B' PRESS. SAFETY B' PRESS. SAFETY B' PRESS. SAFETY C' PRESS. SAFETY C' PRESS. SAFETY C' PRESS. SAFETY C' PRESS. SAFETY PRESS. RELIEF PRESS. RELIEF PRESS. RELIEF PRESS. RELIEF PRESS. SPRAY PRESS. SPRAY PRESS. SPRAY PRESS. SPRAY PRESS. SPRAY PRESS. SPRAY PRESS. SPRAY WELD ID 4501-1DM 4501-1DM 4501-1DM 4501-1DM 4501-12DM 4501-12DM 4501-12DM 4501-12DM 4501-23DM 4501-23DM 4501-23DM 4501-23DM 4502-1 DM 4502-1DM 4502-1DM 4502-1DM 4503-46DM 4503-46DM 450346DM 4503-46DM 4503-46DM 4503-46DM 4503-46DM RFO RF 6 RF 6 RF 8 RF 8 RF 6 RF 6 RF 8 RF 8 RF 6 RF 6 RF 8 RF 8 RF 2 RF 2 RF 8 RF 8 RF2 RF 2 RF 5 RF 5 RF 8 RF1 I RF1 I METHOD PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT UT PT PT UT RESULTS NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI EXAM. COVERAGE 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 100% one sided exam 90.38% one sided exam RF-2-Spring 1984, RF-5-Spring 1990, RF-6-Fall 1991, RF-8-Fall 1994, RF-1 1-Spring 1999 NRI-No Recordable Indications
Document Control Desk Letter Attachment O-C-04-1 719 RC-04-0113 Page 3 of 4 RESPONSE (1)(b) (Cont'd):
In addition to the volumetric and surface examinations addressed above, the VCSNS conducts the VT-2 examinations addressed by ASME Section Xl each outage.
- 2. Bare Metal Visual (BMV) Examinations, as addressed in MRP Letter 2003-039 and as directed by MRP Letter 2004-05, were performed on the Pressurizer Safety, Pressurizer Relief, and Pressurizer Spray lines during our Fall 2003 refueling outage. These visual inspections encompassed 100% of the weld and surrounding areas.
The above listed examinations are documented in appropriate written reports, which are archived as station records. The examinations have not revealed any discontinuities or flaws that have required evaluation, analysis, repair or replacement. There have been no leaks detected via the above examinations therefore there has been no basis to perform follow-up examinations. SCE&G has completed the required Code examinations as well as BMV's of the dissimilar metal butt welds, addressed by this bulletin, that we are currently knowledgeable of and have not identified any pressure boundary leakage.
(c)
A description of the Alloy 82/182/600 pressurizer penetration and steam space piping connection inspection program that will be implemented at your plant during the next and subsequent refueling outages.
The description should include the areas, penetrations and steam space piping connections to be Inspected; the extent (percentage) of coverage to be achieved for each location; inspection methods to be used; qualification standards for the inspection methods and personnel; the process used to resolve any Inspection Indications; the Inspection documentation to be generated; and the basis for concluding that your plant will satisfy applicable regulatory requirements related to the structural and leakage integrity of pressurizer penetrations and steam space piping connections.
If leaking pressurizer penetrations or steam space piping connections are found, indicate what followup NDE will be performed to characterize flaws in the leaking penetrations.
Provide your plans for expansion of the scope of NDE to be performed If circumferential flaws are found in any portion of the leaking pressurizer penetrations or steam space piping connections.
RESPONSE (1)(c):
Bare Metal Visual (BMV) Examinations, as addressed in MRP Letter 2003-039 and as directed by MRP Letter 2004-05, will be performed on the Pressurizer Safety, Pressurizer Relief, and Pressurizer Spray lines during our Spring 2005 refueling outage (RF-15). These visual inspections will encompass 100% of the weld and surrounding areas. VCSNS intends to profile these locations in RF-1 5. Additionally, any other locations that may be identified as a result of reviewing vendor information will also receive a BMV inspection. Any indications will be addressed through the VCSNS corrective action program. A detailed inspection program will be developed once the inputs required to answer Question (1)(a) have been received and
Document Control Desk Letter Attachment O-C-04-1719 RC-04-01 13 Page 4 of 4 evaluated. As a minimum the future inspections and all associated activities will meet or exceed those required by the ASME Code or other regulation in effect at the time.
(d)
In light of the Information discussed In this bulletin and your understanding of the relevance of recent industry operating experience to your facility, explain why the inspection program Identified In your response to Item (1)(c) above Is adequate for the purpose of maintaining the Integrity of your facility's RCPB and for meeting all applicable regulatory requirements which pertain to your facility.
RESPONSE (1)(d):
A full response to this element of the bulletin will be developed in conjunction with the subsequent responses to (1)(a) and (1)(c). However, the inspection results provided in the response to item (1)(b) gives assurance that the welds in question are currently structurally sound. Additionally, the pressurizer heater sleeves at VCSNS are stainless steel and are not susceptible the type of corrosion mechanism discussed In the bulletin. Future compliance with industry initiatives and all codes and regulations will provide continued confidence that the integrity of the reactor coolant pressure boundary is preserved.