ML042100090

From kanterella
Jump to navigation Jump to search
Registration Information for the Storage of Spent Fuel from Unit I at the Independent Spent Fuel Storage Installation of the San Onofre Nuclear Generating Station (SONGS)
ML042100090
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/21/2004
From: Nunn D
Southern California Edison Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
-RFPFR
Download: ML042100090 (2)


Text

SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company Dwight E. Nunn Vice President July 21, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk, Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362 and 72-41 San Onofre Nuclear Generating Station, Units 1, 2 and 3 Gentlemen:

In accordance with the registration requirements given in 10 CFR § 72.212(b)(1)(ii),

Southern California Edison (SCE) hereby submits the following registration information for the storage of spent fuel from Unit I at the Independent Spent Fuel Storage Installation of the San Onofre Nuclear Generating Station (SONGS).

Licensees' Names:

Licensee's Address:

Reactor License Number:

Docket Numbers:

Cask Certificate Number:

Cask Model Number:

Southern California Edison Company San Diego Gas & Electric Company City of Anaheim, California City of Riverside, California 5000 Pacific Coast Highway San Clemente, CA 92672 DPR-13 NPF-10 NPF-15 50-206 50-361 50-362 72-41 (SONGS-1)

(SONGS-2)

(SONGS-3)

(SONGS-1)

(SONGS-2)

(SONGS-3)

(SONGS ISFSI)

CoC 1029, Amendment 0, February 5, 2003 Standardized Advanced NUHOMSP System Cask Identification Nos:

Canister Number:

Module Number:

S12208MVDSCO12 S1232208AHSM009 P.O. Box 128 San Clemente, CA 92674-0128 949-368-1480 Fax 949-368-1490 X-A~s I

Document Control Desk July 21, 2004 For additional information concerning the storage of spent fuel under this general license, please contact Mr. D. F. Pilmer, Licensing Manager, at 949-368-1486.

Sincerely, cc: B. S. Mallett, NRC Regional Administrator, Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 W. C. Huffman, NRC Project Manager, San Onofre Unit 1 S. C. O'Connor, NRC Project Manager, San Onofre ISFSI C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3