E-mail from M. Sherer of Vermont Yankee to Various, Regarding Entergy Vermont Yankee Power Station January 2004ML042080422 |
Person / Time |
---|
Site: |
Vermont Yankee ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
02/26/2004 |
---|
From: |
Sherer M Vermont Yankee |
---|
To: |
Bronson K, Cosgrove B, Finn B, Jefferson S, Kilburn B, Mannai D, Mcelwee D, David Pelton, Porter B, Rondeau N, Sandstrum S, Beth Sienel, Skibniowski S, Thayer J, Wallin G, Wanczyk R, Robert Williams Division of Reactor Safety I, Vermont Yankee |
---|
References |
---|
FOIA/PA-2004-0267 |
Download: ML042080422 (7) |
|
|
---|
Category:E-Mail
MONTHYEARML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML15329A1802015-11-24024 November 2015 E-mail from J. Whited Draft RAIs Re Duke License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413 Through MF6422) ML15295A2132015-10-21021 October 2015 NRR E-mail Capture - VY RAI for Off-site Insurance Exemption (10 CFR 140.11) - MF3980 ML15289A6002015-09-24024 September 2015 La 3 - Vermont Yankee Draft Responses or Edits 9 24 15.docx ML15289A6012015-09-23023 September 2015 La 3 - Nrr_Vermont Yankee Nuclear Power Station Decommissioning Status.Docx ML15288A3532015-09-21021 September 2015 La 3 - VY Dtf LAR - Status ML15257A6172015-09-14014 September 2015 La 3 - Testing the New Profile for Vermont Yankee La 3 - Public ML15195A3592015-07-14014 July 2015 NRR E-mail Capture - Acceptance Review for Vermont Yankee Amendment -Revise Cyber Security Plan Implementation ML15289A0022015-06-17017 June 2015 La 3 - Question from Ma ML15289A5982015-06-0909 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 5 2015 Letter from Vermont, Vynpc, and Gmp to NRC Attached ML15289A0072015-06-0505 June 2015 La 3 - Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15289A2432015-06-0404 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 4 2015 Vermont Letter to NRC Attached ML15289A0062015-06-0404 June 2015 La 3 - FW: Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15288A3592015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3602015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3622015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A4822015-05-22022 May 2015 La 3 - Vermont Reply to NRC & Entergy Answers Re VY LA-3 ML15289A0042015-05-19019 May 2015 La 3 - New Proposal Dates for Phone Call with VT ML15289A0052015-05-11011 May 2015 La 3 - ML Numbers for Disbursement Letters for Vermont Yankee ML15289A5992015-05-0808 May 2015 La 3 - Call with State of VT ML15289A0032015-05-0707 May 2015 La 3 - Other than for Comanche Peak, ML15289A1252015-05-0606 May 2015 La 3 - FRN Review - VY Dtf Exemption ML15128A0232015-04-27027 April 2015 NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of Entergy 2021-03-15
[Table view] |
Text
Sienel, Beth From: Sherer, Marie Sent: Thursday, February 26, 2004 10:57 AM To: 'lerevents @inpo.org'; 'rbelval4velco.com'; 'gparker~velco.com'; 'rivest@ gmpvt.com';
'martin @gmpvt.com'; 'kvedar@ gmpvt.com'; 'dutton@ gmpvt.com'; 'brown E gmpvt.com';
William.sherman@state.vt.us'; 'BOliveira@AmNuclns.com'; 'barbaralewis@platts.com';
'bamelan~cvps.com'; Kilbum, Bobbi; Thayer, Jay; Bronson, Kevin; Williams, Rob; Cosgrove, Brian; McElwee, David; Finn, Brian; Porter, Brad; Wanczyk, Robert; Sandstrum, Sally; Jefferson, Stan; Manna!, David; Wallin, Greg; Rondeau, Nancy; Skibniowsky, Steve; Sienel, Beth; Pelton, David
Subject:
Entergy Vermont Yankee Nuclear Power Station January 2004 Attached please find the Entergy Vermont Yankee Nuclear Power Station Monthly Statistical Report for January 2004.
If you have any questions please contact me.
Marie E.Sherer Controlled Document Specialist Technical Support bepartment Entergy Northeast - Vermont Yankee 802-451-3011 MC #1220 Ur MSR.JANUARY-20 04.pdf (156 KB)
A0,kS 1
Entergy Nudear Northeast Enwgey Nuclear Operations. Inc.
S.Entegy Verrmont Yankee 322 Governcr Hunt Rd.
P.O. Box 157 Verncn, VT 05354 Tel S02- 57-7711 February 10, 2004 BVY-04-012 U-nited States Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555
Reference:
(a) License No. DPR-28 (Docket No. 50-271)
In accordance with section 6.6. of the Vmont YankeeTechnical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January. 2004.
Sincer Kevin E zoo General Manager, Plant Operations cc: USNRC Region I AdmInistratr USNRC Resident Inspectar USNRC Project Manager
VERMONT YANLKE NUCLEAR POWER STATiON MONTHLY STATSTICAL REPORT 04-01 FOR THE MONTH OF JANUARY 2004
OPERATING DATA RjrPORT DOCKETNO. 50-271 DATE 040210 COMPLETED BY G.X. W).LLIN TELEPHONE (802)2' 58-5414 OPERATING STATUS
- 1. unit Name: Vermont Yankee
- 2. Reporting Peric)d: January
- 3. Licensed Thermal Power(SWt) :1593
- 4. Nameplate Rating(Gross Z4We): 540 S. Design Electrical Mting(Net MWe): 522
- 6. Maximum Dependable Capacity(Gross MWe): 535
- 7. Maxim Dependable Capacity (Net Mwe): 510 B. If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
- 9. Power level to which restricted, if any(Net XWe): N/A
- 10. Reasons for restrictions, if any: NA This Month Yr-to-Date t mulative
- 11. Hours in Reporting Period 744.00 744.00 275665.80
- 12. Number Of Hours Reactor was Critical 744.00 744.00 t32545 .22
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 "in7 0.00
- 14. Hours Generator On-Line 744.00 744.00 228870 .69
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated(MM) 1184457.85 1184457.85 3 L57447.57
- 17. Gross Electrical Energy Generated(l) 408791.00 408791.00 1 16i641043 .00
- 18. Net Electrical Energy Generated(HMW) 392688.00 392688.00 1 )19199 .00
- 19. Unit Service Factor 100.00 100.00 83 . 00
- 20. Uhit Kvailawbility Factor 100.00 100.00 83.00
- 21. Unit Capacity Factor(Using MDC Net) 103.50 103.50 31 79. 60
- 22. Unit Capacity Factor(Using DER Net) 101.10 101.10 78.00
- 23. UMit Forced Outage Rate 0.00 0.00 _ . 3.83
- 24. Sh utdowns scheduled over next 6 months(Type, Date, and Duration Each: 04/03/2004 to 05/03/2004 for scheduled refueling outage.
- 25. If shut down at end of report period, estimated date of startup: N/A
- 26. Units In Test Status(prior to conmercial operation): NIA Forecast Achieved INITIAL CRITICALITY WITIAL ELECTRICITY COMERCIAL OPERATION VYDPF 0411. 01 (Sample)
DP 0411 Rev. 8 Page 1 of I RT No. 13.F01.19F
AVERAGE DAILY UNIT POWER LEVEL D0CKET NO. 50-271 UNIT Vermont Yankee DATE 040210 COMPLETED BY G.A. WALEIN my.. * - -
2b-b414 Z
MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVE AGE DAILY POWER LEVE L (MWe-Net) (MWe-Net)
- 1. 529 17. 527
- 2. 529 is. 528
- 3. 529 19. 527
- 4. 528 20. 527
- 5. 528 21. 528
- 6. 528 22. 527
- 7. 529 23. 528
- 8. 529 24. 527
- 9. 529 25. 527
- 10. 528 26. 527
- 11. 528 27. 527
- 12. 528 28. 527
- 13. 528 29. 527
- 14. 527 30. 527
- 15. 525 31. 527
- 16. 526 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13 .F01.16V
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONH JANUARY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 040210 COMPLED BY G.A. Wallin TELEPHONE (802) 258-5414 I
2 3 4 Cause and Corrective Action to Prevent No. Date Type Duration Reason Method of License System Conponent R ecurrencev Shutting Event Code Code (hours) Report Reactor (None) 1 F: Forced 2 Reason: 3 Method: 4 Exhibit G- Instructions S: Scheduled A-Bquipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License C-Refueling 3 - Automatic Scram Event Report (LER) File D-Regulatory Restriction 4 - Other (Explain) (NUREG 0161)
E-Operator Training, and License Examination 5 Exhibit I - Same Source F-Administrative G-Operational Error (Explain)
H-(Explain) - VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1 l1
DOCKET NO. 50-271 DATE 040210 COMPLETED BY G.A. WALLI-TELEPHONE (802) 258-5414 REPORT MONTH January SUMMRY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9% of rated thermal power for the month.
Gross electrical generation was 408,791 MW{e or 100.6% design electrical capacity.
operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month; At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13,FO1.18X