ML042030323

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Indian Point Units 2 and 3
ML042030323
Person / Time
Site: Indian Point  
Issue date: 07/14/2004
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NL-04-083
Download: ML042030323 (4)


Text

'En tergy Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration July 14, 2004 Indian Point Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-083

[1 OCFR50.36]

Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-Pl-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for June 2004

Reference:

1)

NRC Generic Letter 97-02, 'Revised Contents of the Monthly Operating Report," dated May 15, 1997

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of June 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1).

There are no commitments contained in this letter.

Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.

Sincerely, Fred R. Dacimo Site Vice President Indian Point Energy Center

Docket Nos. 50-247 and 50-286 NL-04-083 Page 2 of 2 : Operating Data Report Indian Point 2 : Operating Data Report Indian Point 3 cc:

Mr. Samuel J. Collins Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223-1350

OPERATING DATA REPORT NL-04-083 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-247 Indian Point 2 (Unit)

July 02, 2004 Tom Orlando-v (914) 736-8340 REPORTING PERIOD:

June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 993.00 956.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 702,802.00 Yr-to-Date 4,367.00 4,367.00 0.00 4,306,901.00 Cumulative 187,533.48 183,537.95 0.00 156,457,187.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments I

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit 2 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 727,635 MWHrs.

Page 1 of 1

OPERATING DATA REPORT NL-04-083 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-286 Indian Point 3 (Unit)

July 07, 2004 Tom Orlando (914) 736-8340 REPORTING PERIOD:

June 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 979.00 979.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 715,215.00 Yr-to-Date 4,367.00 4,367.00 0.00 4,359,414.00 Cumulative 158,471.99 155,524.18 0.00 140,004,726.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments I

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit 3 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 740,374 MWHrs.

Page 1 of 1