Entergy Nuclear Northeast Indian Point Energy Center
'En tergy 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration July 14, 2004 Indian Point Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-083
[1 OCFR50.36]
Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-Pl-17 Washington, DC 20555-0001
Subject:
Monthly Operating Report for June 2004
Reference:
- 1) NRC Generic Letter 97-02, 'Revised Contents of the Monthly Operating Report," dated May 15, 1997
Dear Sir:
In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of June 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1).
There are no commitments contained in this letter.
Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.
Sincerely, Fred R. Dacimo Site Vice President Indian Point Energy Center
Docket Nos. 50-247 and 50-286 NL-04-083 Page 2 of 2 : Operating Data Report Indian Point 2 : Operating Data Report Indian Point 3 cc:
Mr. Samuel J. Collins Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223-1350
OPERATING DATA REPORT NL-04-083 Attachment 1 DOCKET NO. 50-247 UNIT NAME Indian Point 2 (Unit)
DATE July 02, 2004 COMPLETED BY Tom Orlando- v TELEPHONE (914) 736-8340 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating 993.00
- 2. Maximum Dependable Capacity (MWe-Net) 956.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,367.00 187,533.48
- 4. Number of Hours Generator On-line 720.00 4,367.00 183,537.95
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 702,802.00 4,306,901.00 156,457,187.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
Indian Point Unit 2 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 727,635 MWHrs.
Page 1 of 1
OPERATING DATA REPORT NL-04-083 Attachment 2 DOCKET NO. 50-286 UNIT NAME Indian Point 3 (Unit)
DATE July 07, 2004 COMPLETED BY Tom Orlando -:
TELEPHONE (914) 736-8340 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating 979.00
- 2. Maximum Dependable Capacity (MWe-Net) 979.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,367.00 158,471.99
- 4. Number of Hours Generator On-line 720.00 4,367.00 155,524.18
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 715,215.00 4,359,414.00 140,004,726.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
Indian Point Unit 3 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 740,374 MWHrs.
Page 1 of 1
Text
Entergy Nuclear Northeast Indian Point Energy Center
'En tergy 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration July 14, 2004 Indian Point Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-083
[1 OCFR50.36]
Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-Pl-17 Washington, DC 20555-0001
Subject:
Monthly Operating Report for June 2004
Reference:
- 1) NRC Generic Letter 97-02, 'Revised Contents of the Monthly Operating Report," dated May 15, 1997
Dear Sir:
In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of June 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1).
There are no commitments contained in this letter.
Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.
Sincerely, Fred R. Dacimo Site Vice President Indian Point Energy Center
Docket Nos. 50-247 and 50-286 NL-04-083 Page 2 of 2 : Operating Data Report Indian Point 2 : Operating Data Report Indian Point 3 cc:
Mr. Samuel J. Collins Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223-1350
OPERATING DATA REPORT NL-04-083 Attachment 1 DOCKET NO. 50-247 UNIT NAME Indian Point 2 (Unit)
DATE July 02, 2004 COMPLETED BY Tom Orlando- v TELEPHONE (914) 736-8340 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating 993.00
- 2. Maximum Dependable Capacity (MWe-Net) 956.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,367.00 187,533.48
- 4. Number of Hours Generator On-line 720.00 4,367.00 183,537.95
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 702,802.00 4,306,901.00 156,457,187.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
Indian Point Unit 2 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 727,635 MWHrs.
Page 1 of 1
OPERATING DATA REPORT NL-04-083 Attachment 2 DOCKET NO. 50-286 UNIT NAME Indian Point 3 (Unit)
DATE July 07, 2004 COMPLETED BY Tom Orlando -:
TELEPHONE (914) 736-8340 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating 979.00
- 2. Maximum Dependable Capacity (MWe-Net) 979.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,367.00 158,471.99
- 4. Number of Hours Generator On-line 720.00 4,367.00 155,524.18
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 715,215.00 4,359,414.00 140,004,726.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments I 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
Indian Point Unit 3 was synchronized to the grid for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross generation of 740,374 MWHrs.