June 2004 Monthly Operating Reports for Palo Verde Nuclear Generating Station
ML042030036
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/15/2004
From: Danni Smith
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00725-DMS
Download: ML042030036 (4)


Text

LAPS A s.uhsidiin. qfPinnacle' liwi Capita! Ceorlwaim Palo Verde Nuclear Generating Station David M. Smith Plant Manager Nuclear Production Tel.

623-393-6116 Fax.

623-393-6077 e-mail: DSMITH10@apsc.com Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 July 15, 2004 035-00725-DMS U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for JUNE 2004 Enclosed are the Monthly Operating Reports for JUNE 2004, prepared and submitted Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and Licenses.

pursuant to 3 Operating By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Don Vogt at (623) 393-5926.

Sincerely,

,L. P14 4i/ -bA'\\S.

DMS/ap

Enclosures:

JUNE 2004 Monthly Operating Reports cc:

(all w/enclosures)

Dr. Bruce S. Mallett - Regional Administrator, NRC Region IV PVNGS Resident Inspector INPO Records Center Utility Data Institute

',-- L

OPERATING DATA REPORT DOCKET NO.

5 UNIT NAME F

DATE COMPLETED BY T

TELEPHONE T

REPORTING PERIOD:

50-528 Palo Verde I uly 13, 2004

)on Vogt 623) 393-5926 June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,265.00 1,243.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator OnIlne

5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 629.13 614.90 0.00 707,813.71 Yr-to-Date Cumulative 3,310.30 126,092.22 3,254.67 124,643.70 0.00 0.00 3,898,578.20 150,154,268.54 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason 1 Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments 04-03 06/14/2004 F

105.10 A

3 RX mrip due to loss of off site power caused I

9 I I

I Iby major grid disturba nce.

SUMMARY

Unit began month at full power. On 6/14 an automatc RX trip occurred due to a major grid distrubance casuing a loss of off-site power. The RX was taken critical on 06118 and synchronized to the grid at 15:13. On 6/20 RX power reached 100%. Condensate pump B tipped on 6121 resulting in reactor power cutback to 60% power. Power ascension back to full power commenced on 6/21 and the unit reached full power on 6/23. The unit ended the month at full power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & ULcense Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

ContinuatIon 5

Other (Explain)

Page 1 of 1

OPERATING DATA REPORT DOCKET NO.

5 UNIT NAME F

DATE COMPLETED BY T

TELEPHONE T

REPORTING PERIOD:

O-529 Palo Verde 2 luly 13, 2004

)on Vogt 623) 393-5926 June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,354.00 1.335.00

3.

Number of Hours the Reactor was Critical 4

Number of Hours Generator Online

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 608.52 593.43 0.00 756,066.88 Yr-to-Date Cumulative 3,823.98 124,613.24 3,797.48 123,187.00 0.00 0.00 5,049,872.99 150,437,965.86 UNIT SHUTDOWNS Type Method of F: Forced Duration Reason Shutting Cause & Corrective Action No.

Date S: Scheduled

{Hours)

Reason 1

_Down 2

Comments 04-02 06/1142004 F

126.57 A

3 RX trip due to loss of off site power caused by major grid disturbance.

SUMMARY

The Design Electrical Rating (DER) and the Maximum Dependable Capacity (MDC) reflect the power uprate performed in 2003. These are interim values. Official values approved by station owners will be determined after testing is completed at the end of the 3rd quarter (iate summer). Unit began month at full power. On 6/14 an automatic RX trip occurred due to a major grid distrubance casuing a loss of off-site power. The RX was taken critical on 06/18 and synchronized to the grid at 2310. On 6/20 RX power reached 100%. The unit ended the month at full power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & Ucense Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1

OPERATING DATA REPORT DOCKET NO.

UNIT NAME I

DATE COMPLETED BY I

TELEPHONE I

REPORTING PERIOD:

50-530 Palo Verde 3 July 13,2004 ion Vogt (623) 393-5926 June 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,269.00 1,247.00

3.

Number of Hours the Reactor was Crfitcal

4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 533.00 3,984.03 121,947.33 463.52 3,901.83 120,813.20 0.00 0.00 0.00 511,233.59 4,822,060.65 147,883,928.67 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments 0402 06107/2004 F

101.63 A

3 Automatic RX trip on low DNBR after I_

_turbine control system anomaly.

04-03 06/1412004 F

154.85 A

3 RX tip due to loss of off site power caused I_

by major grid disturbance.

SUMMARY

Unit began month at full power. An automatic RX trip on low DNBR occurred on 6/07 due to a turbine control system anomaly. The RX was taken critical on 6109 and the unit was synchronized on 6/11 after extensive turbine control system troubleshooting. Full power was achieved on 6113. On 6/14 an automatic RX trip occurred due to a major grid distrubance casuing a loss of off-site power. The RX was taken critical on 06119 and synchronized to the grid on 06120 at 1832. On 6121 RX power reached 100%. The unit ended the month at full power.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)