June 2004 Monthly Operating Report for Limerick Generating Station, Units 1 and 2
ML042020345
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/15/2004
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042020345 (4)


Text

-<

Exekren.M Exelon Nuclear Limerick Generating Station P.O. Box 2300 Sanatoga, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 July 15, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for June 2004 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of June 2004 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of June 2004 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Bryan C. Hanson Plant Manager-LGS Attachments cc:

S. Collins, Administrator, Region I, USNRC S. Hansell, LGS USNRC Senior Resident Inspector

'q

f

A

- 7 bcc:

R. DeGregorio - GML 5-1 B. Hanson - GML 5-1 E. Callan - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB2-3 J. Toro - SMB 1-2 G. Lee - SSB3-1 J. Grimes - KSA 2N D. Dyckman (PABRP) SSB 2-4

A.

OPERATING DATA REPORT REPORTING PERIOD-June 2004 Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 1 50-352 7/15/04 Greg Lee (610) 718-3707 I Design Electrical Rating (MWe-Net)

I 1191.00 I I Maximum Dependable Capacity (MWe-Net) l 1134.00 l

Month Year to Date Cumulative Hours Reactor Critical (Hours) 720.00 3,972.17 142,538.64 Hours Generator On-Line (Hours) 720.00 3,928.38 140,509.58 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 829,282.00 4,424,752.00 146,251,041.00 B.

UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None during--- -

June 2004

SUMMARY

Unit 1 began the month of June 2004 at 99.9% of rated thermal power (RTP).

There were no power changes during the month of June 2004.

Unit 1 ended the month of June 2004 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION Date l Valves Actuated l No. & Type of Actuation : Plant Condition l Description of Event None During June 2004 1

1

Unit:

Limerick 2 Docket No:

50-353 Date:

7/15/04 Completed by: Greg Lee Telephone:

(610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-June 2004 l Design Electrical Rating (MWe-Net) 1191.00 l

Maximum Dependable Capacity (MWe-Net) 1134.00 Month I Year to Date I Cumulative Hours Reactor Critical (Hours) l

_689.13_l 4,336.13 118,786.23 Hours Generator On-Line (Hours) 670.02 4,317.02 117,004.74 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 738,835.00 4,966,763.00 125,988,129.00 B. UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs) 1 04/06/22 F

49.98 A

3 2F32-Reactor scram due to generator lockout. During the opening of the 135 breaker, the

'B' phase experienced an internal fault. The CT on the 345 breaker failed resulting additional breaker trips that led to the turbine trip. The breakers were repaired/replaced.

SUMMARY

Unit 2 began the month of June 2004 at 100.0% of rated thermal power (RTP).

On June 22" at 13:12 hours, the main turbine automatically tripped due to generator lockout which resulted in an automatic reactor scram, at 99.9% RTP.

On June 23 'd at 20:04 hours, reactor criticality was achieved.

On Junee24' at 11:16 hours, the main generator was synchronized to the grid at 18.7% RTP. At 14:23 hours, the main generator was tripped at 22.1 % RTP for voltage regulator and overspeed testing. At 15:11 hours the main generator was resynchronized to the grid at 19.9% power.

On June 2 7 In at 20:46 hours, reactor power was restored to 100.0% RTP.

Unit 2 ended the month of June 2004 at 99.9% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-RefjelingY -

-7:

3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION I Date I Valves Actuated I No. & Type of Actuation I Plant Condition I Description of Event I

I I None During June 2004 l

7