June 2004 Monthly Operating Status Report for Fermi 2
ML042010278
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/08/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0047
Download: ML042010278 (2)


Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 July 8, 2004 NRC-04-0047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for June 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for June 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincere orman K Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region III Region III

-9Z--6(

A DTE Energy Company

. OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2.

July 8. 2004.

Kevin Burke (734) 586-5148 REPORTING PERIOD: June 2004

1.

Design Electrical Rating (MWe-Net) 1.150.00

2.

Maximum Dependable Capacity (Mwe-Net) 1.089.00 3.

4.

5.

6.

This Month Number of Hours the Reactor Was Critical 720 Number of Hours Generator On-line 720 Reserve Shutdown Hours 0.00 Net Electrical Energy Generated (MWH) 788.170 UNIT SHUTDOWNS Year-to-Date Cumulative 4.367 4,367 0.00 4.816.605 112.263 108.376 0.00 109,440.173 No.

Date Type Duration Reason (1)

Method of Cause and F: Forced (Hours)

Shutting Corrective Action S: Scheduled Down (2)

Comments N/A

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On June 5, 2004, at 0826 hours0.00956 days <br />0.229 hours <br />0.00137 weeks <br />3.14293e-4 months <br />, power was reduced from 100% to 93% for High Pressure Control Valve No. 2 circuit card replacement. Return to full power was completed at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />. On June 17, 2004, at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced from 100% to 99% for feedwater flow instrument loop calibrations. Return to full power was completed at 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br />. Qn June 19, 2004, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, power was reduced from 100% to 97% for surveillance test on partially withdrawn control rods. Return to full power was completed at 0947 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.603335e-4 months <br />.

(1) Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training and License Examination F Administration G Operational Error (Explain)

H Other (Explain)

(2) Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)