Summary of Pre-Application Review Meeting with Firstenergy Nuclear Operating Co (Fenoc), Et Al., Regarding BVPS-1 One Cycle Approval of Steam Generator Tube Inspection and Repair Criteria Using W* Methodology
ML042010038
Person / Time
Site: Beaver Valley
Issue date: 07/26/2004
From: Colburn T
NRC/NRR/DLPM/LPD1
To:
Colburn T, NRR/DLPM, 415-1402
References
TAC MC3239
Download: ML042010038 (23)


Text

July 26, 2004 LICENSEE:

FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

FACILITY:

BEAVER VALLEY POWER STATION, UNIT NO. 1 (BVPS-1)

SUBJECT:

SUMMARY

OF JUNE 8, 2004, PRE-APPLICATION REVIEW MEETING WITH FENOC, ET AL., REGARDING BVPS-1 ONE-CYCLE APPROVAL OF STEAM GENERATOR TUBE INSPECTION AND REPAIR CRITERIA USING W*

METHODOLOGY (TAC NO. MC3239)

On June 8, 2004, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FENOC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to conduct a working level pre-application review of FENOCs planned submittal for a one-cycle approval of the use of the Westinghouse Electric Companys W* methodology at BVPS-1. A list of attendees is provided as Attachment 1.

FENOC presented information contained in Attachment 2. FENOCs presentation included a description of the background information on the BVPS-1 steam generator (SG) tubes which led to the need for the planned use of the W* methodology. FENOC discussed the implications of not receiving approval of the use of the W* methodology during the BVPS-1 SG inspections in the fall 2004 refueling outage, the primary effect being a possibility that the analyzed tube plugging limit could be exceeded. FENOC included discussion of the BVPS-1 SG tube flaw and primary water stress corrosion cracking histories and the bounding leakage analysis. FENOC discussed with the staff the short lead time for the amendment review and ways to help facilitate the review and expedite responses to any additional information which may be requested by the NRC staff after the formal license amendment application is received. The licensee also provided a draft of selected portions of the forthcoming application including proposed Technical Specification changes.

During the meeting, the NRC staff discussed several technical and regulatory issues associated with the proposal with the licensee. In addition, the NRC staff expressed its willingness to work with the licensee to complete its review of the licensees formal application when received in time to support the licensees schedule. The licensees formal application was dated June 28, 2004.

CONTACT:

Timothy G. Colburn 301-415-1402 NRR/DLPM Members of the public were in attendance from PG&E and TVA. Public Meeting Feedback forms were not received.

Please direct any inquiries to Timothy G. Colburn at 301-415-1402, or tgc@nrc.gov.

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-334 Attachments: 1. List of Attendees

2. Licensee Handouts cc w/atts: See next page

ML042010038 NRC-001 OFFICE PDI-1/PM EMCB/SC PDI-1/SC NAME TColburn LLund RLaufer DATE 7/19/04 7/19/04 7/20/04 LIST OF ATTENDEES CATEGORY 1 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION (NRC), AND FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

REGARDING USE OF WESTINGHOUSE W* METHODOLOGY AT BEAVER VALLEY POWER STATION, UNIT NO. 1 JUNE 8, 2004 9:00 A.M. -12:00 NOON NAME ORGANIZATION

1. Timothy G. Colburn NRC/NRR/PDI-1
2. Paul Klein NRC/DE/EMCB
3. Jim Davis NRC/RESDET/MEB
4. Ken Karwoski NRC/NRR/DE
5. Ron Fedin FENOC
6. Brian Sepelak FENOC
7. Gary Alberti FENOC
8. Greg Kammerdeiner FENOC
9. Bob Keating Westinghouse
10. William Cullen Westinghouse
11. Helen Cothron TVA
12. John Arhar PG&E

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077