G20040422/LTR 04-0387 - M. E. Lampert Ltr. Re. Request That NRC Not Allow Pilgrim Nuclear Power Station to Continue to Operate During a Strike
ML041960338
Person / Time
Site: Pilgrim
Issue date: 07/27/2004
From: Dyer J
Office of Nuclear Reactor Regulation
To: Lampert M
- No Known Affiliation
Licata L NRR/DLPM/LPDI 415-4090
Shared Package
ML02040436 List:
References
G20040422, LTR 04-0387, TAC MC3622
Download: ML041960338 (5)


Text

July 27, 2004 Ms. Mary Elizabeth Lampert 148 Washington Street Duxbury, MA 02332

Dear Ms. Lampert:

Your petition dated June 12, 2004, addressed to the Chairman of the Nuclear Regulatory Commission (NRC) was received on June 21, 2004, and has been referred to the Office of Nuclear Reactor Regulation pursuant to Title 10 of the Code of Federal Regulations Section 2.206 of the Commissions regulations.

In your petition, you requested that the NRC not allow the Pilgrim Nuclear Power Station to continue to operate should the union workers initiate a strike.

On July 15, 2004, a new contract was ratified between Entergy Nuclear Operations, Inc. and Utility Workers Union of America, Local 369, and a strike was avoided. Therefore, the NRC Petition Review Board has taken no action on your petition request. The NRC considers this request closed based on the ratification of the contract and no strike action.

Thank you for bringing these issues to the attention of the NRC.

Sincerely,

/RA R. W. Borchardt for/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Mary Lamberts 2.206 Request of June 12, 2004 cc: See next page

Ms. Mary Elizabeth Lampert July 27, 2004 148 Washington Street Duxbury, MA 02332

Dear Ms. Lampert:

Your petition dated June 12, 2004, addressed to the Chairman of the Nuclear Regulatory Commission (NRC) was received on June 21, 2004, and has been referred to the Office of Nuclear Reactor Regulation pursuant to Title 10 of the Code of Federal Regulations Section 2.206 of the Commissions regulations.

In your petition, you requested that the NRC not allow the Pilgrim Nuclear Power Station to continue to operate should the union workers initiate a strike.

On July 15, 2004, a new contract was ratified between Entergy Nuclear Operations, Inc. and Utility Workers Union of America, Local 369, and a strike was avoided. Therefore, the NRC Petition Review Board has taken no action on your petition request. The NRC considers this request closed based on the ratification of the contract and no strike action.

Thank you for bringing these issues to the attention of the NRC.

Sincerely,

/RA R. W. Borchardt for/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Mary Lamberts 2.206 Request of June 12, 2004 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrOd (JDyer/RBorchardt) RidsNrrDlpmLpdi (CHolden)

PD1-2 R/F RidsNrrAdpt (BSheron) RidsNrrDlpmLpdi-2 (JClifford)

RidsEdoMailCenter (#G20040422) RidsOgcRp RidsNrrPMLLicata L. Reyes RidsOpaMail RidsNrrLACRaynor S. Collins RidsOcaMailCenter RidsRgn1MailCenter (CBixler)

W. Kane RidsSecyMailCenter CBurns M. Virgilio RidsNrrWpcMail (#G20040422) SLewis P. Norry RidsNrrAdpt (KGrimes) KCyr W. Dean RidsNrrDlpm (LMarsh) JGoldberg Incoming: ML041770301, Package: ML042040436 ADAMS Accession Number: ML041960338 OFFICE PM:PDI-2 LA:PDI-2 SC:PD1-2 D:PDI Tech Ed NAME Llicata (Swall for) CRaynor JClifford CHolden PKleene DATE 7/22/04 7/22/04 7/22/04 7/22/04 07/19/04 OFFICE OGC D:DLPM ADPT/NRR D:NRR NAME SLewis LMarsh BSheron BSheron for JDyer DATE 07/21/04 7/23/04 7/26/04 7/26/04 OFFICIAL RECORD COPY

Pilgrim Nuclear Power Station cc:

Mr. Michael Kansler Mr. Steve Brennion President Supt., Regulatory & Industry Affairs Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Pilgrim Nuclear Power Station White Plains, NY 10601 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Chairman, Board of Selectmen 11 Lincoln Street Mr. Jack Alexander Plymouth, MA 02360 Manager, Reg. Relations and Quality Assurance Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5599 Duxbury, MA 02332 Mr. David F. Tarantino Office of the Commissioner Nuclear Information Manager Massachusetts Department of Pilgrim Nuclear Power Station Environmental Protection 600 Rocky Hill Road One Winter Street Plymouth, MA 02360-5599 Boston, MA 02108 Ms. Jane Perlov Office of the Attorney General Secretary of Public Safety One Ashburton Place Executive Office of Public Safety 20th Floor One Ashburton Place Boston, MA 02108 Boston, MA 02108 Dr. Robert M. Hallisey, Director Mr. Stephen J. McGrail, Director Radiation Control Program Attn: James Muckerheide Commonwealth of Massachusetts Massachusetts Emergency Management Executive Offices of Health and Agency Human Services 400 Worcester Road 174 Portland Street Framingham, MA 01702-5399 Boston, MA 02114 Chairman Regional Administrator, Region I Nuclear Matters Committee U. S. Nuclear Regulatory Commission Town Hall 475 Allendale Road 11 Lincoln Street King of Prussia, PA 19406-1415 Plymouth, MA 02360 Mr. John M. Fulton Mr. William D. Meinert Assistant General Counsel Nuclear Engineer Entergy Nuclear Operations, Inc. Massachusetts Municipal Wholesale 440 Hamilton Avenue Electric Company White Plains, NY 10601 P.O. Box 426 Ludlow, MA 01056-0426

Pilgrim Nuclear Power Station cc:

Mr. Michael A. Balduzzi Mr. Michael J. Colomb Site Vice President Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 440 Hamilton Avenue 600 Rocky Hill Road White Plains, NY 10601 Plymouth, MA 02360-5508 Senior Resident Inspector Mr. Stephen J. Bethay U.S. Nuclear Regulatory Commission Director, Nuclear Assessment Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc. 600 Rocky Hill Road Pilgrim Nuclear Power Station Mail Stop 66 600 Rocky Hill Road Plymouth, MA 02360-5508 Plymouth, MA 02360-5508 Ms. Stacey Lousteau Mr. Bryan S. Ford Treasury Department Manager, Licensing Entergy Services, Inc.

Entergy Nuclear Operations, Inc. 639 Loyola Avenue Pilgrim Nuclear Power Station New Orleans, LA 70113 600 Rocky Hill Road Plymouth, MA 02360-5508 Jim Sniezek 5486 Nithsdale Drive Mr. Danny L. Pace Salisbury, MD 21801 Vice President, Engineering Entergy Nuclear Operations, Inc. Mr. Kennety L. Graesser 440 Hamilton Avenue 38832 N. Ashley Drive White Plains, NY 10601 Lake Villa, IL 60046 Mr. Brian OGrady Mr. Ronald Toole Vice President, Operations Support 1282 Valley of Lakes Entergy Nuclear Operations, Inc. Box R-10 440 Hamilton Avenue Hazelton, PA 182020 White Plains, NY 10601 Mr. Gary J. Taylor Mr. John F. McCann Chief Executive Officer Director, Nuclear Safety Assurance Entergy Operations Entergy Nuclear Operations, Inc. 1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Ms. Charlene D. Faison Sr. VP and Chief Operating Officer Manager, Licensing Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601