ML041810650
| ML041810650 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 06/22/2004 |
| From: | Doreen Turner General Electric Co |
| To: | Mendonca M Document Control Desk, Office of Nuclear Reactor Regulation, NRC Region 4 |
| References | |
| DWT-2004-27, IR-04-202, NEDO-32765 | |
| Download: ML041810650 (2) | |
Text
i'
P%
t GE Energy David W. Turner Mgr, Regulatory Compliance & EHS david.turner@gene.ge.com Tuesday, June 22nd, 2004 File Copy DWr-2004-27 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 cc: Marvin Mendonca - NRC
Subject:
Reference:
Enclosure:
Technical Specifications for License R-33, Docket No. 50-73 NRC Inspection Report No. 50-73/2004-202 Proposed page 4-6 of NDEO-32765
Dear US NRC Staff:
During a routine Inspection by Mr. Tom Dragoon of the US NRC, it was noted that two paragraphs In the Technical Specifications for the Nuclear Test Reactor (License R-33) referenced sections of the Technical Specifications, which had been renumbered, by their old section number.
Paragraph 4.4.3.2 Incorrect reference 3.4.3.5 Correct reference 3.4.3.4 Comparison of the 1984 version of the Technical Specifications against the version current through Amendment 22 of Ucense R-33 Indicates that the current paragraph 3.4.3.4 is the same as 1984 version's paragraph 3.3.5.
A proposed page substitution Is enclosed.
GE Vallecitos Nucdear Center will consider IFI 50-73/2004-202-01 resolved unless Instructions to the contrary are received from the NRC.
Sincerely Yours, v (2X CP
=W T
MMOnSM 1UTS 201W L :1 W ~.d ft w Civ-David W. Turner Manager, Regulatory Compliance & EHS General Electric Company GENE Vafledtos Nucear Center Mail Code V-18 6705 Vafledtos Rd Siond, CA 94586 T.925.862.4360
,W-<
c----
C-) I
NEDO-32765 4.3 REACTOR COOLANT SYSTEM Specifications regarding surveillance requirements of the reactor coolant system are included in the reactor safety system, Specification 4.2, Tables 4-1 and 4-2.
4.4 REACTOR CELL AND VENTILATION SYSTEM 4.4.1 Applicability This specification applies to the surveillance requirements for the reactor cell and ventilation system.
4.4.2 Objective The objective of this specification is to ensure that the reactor ventilation system is in satisfactory condition to provide adequate confinement and to control the release of radioactivity to the environment.
4.4.3 SpecificatIon 4.4.3.1 The reactor cell negative pressure, with respect to the control room, shall be verified prior to the first reactor startup of each day.
4.4.3.2 Surveillance requirements of the instrumentation and equipment required to comply with Specifications 3.4.3.2, 3.4.3.3 and 3.4.3.4 shall be as listed in Specification 4.2, Table 4-2.
4.4.4 Bases Operation in accordance with Specification 4.4.3.1 ensures that contaminated reactor cell air is exhausted through the ventilation system. This minimizes the possibility of airborne contamination release to surrounding areas.
Page 4-6 Rev 612112004l