lThomas Alexion - Status of 1 R1 8 Alloy 600 Inspections Page From:
"BENNETT, STEVE A" <SBENNE2@entergy.coM->
To:
Tom Alexion <twaXnrc.gov>, 'Jeff Clark (ac~nrc.gov)" <jac~nrc.gov>, "SWAIN, RONALD VANCE" <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,
"COMPTON, LESLIE" <LCOMPTO@entergy.com>, "DAIBER, BRYAN J <BDAIBER~entergy.com>,
"DAVANT, GUY H" <GDAVANT~entergy.com>, "DEESE, RICHARD Wm <rdees9O~entergy.com>,
"EATON, WILLIAM A" <WEATON~entergy.com>, OEDGELL, DOUGLAS W"
<DEDGELL~entergy.com>, "EHREN, TERRY G <TEHREN6entergy.com>, "EUBANKS, CLIFFORD"
<CEUBANK entergy.com>, "FORBES, JEFFREY" <JFORBE1 @entergy.com>, "FORREST, FREDDIE"
<FFORRES~entergy.com>, "GOBELL, JAMIE N" <JGOBELLQentergy.com>, "GORDON, ROBERT A"
<RGORDON ©entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT@entergy.com>, "JAMES, DALE E" <DJAMES @entergy.com>, "JAMES, WILLIAM" <WJAMES1 © entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE6entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS~entergy.com>, NMITCHELL, TIMOTHY G" <TMITCH1 @entergy.com>,
"PANTHER, KENNETH C <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKS@entergy.com>,
"PAYNE, GARY - WF3" <GPAYNE~entergy.com>, "SIMS, WILLIAM D" <WSIMS~entergy.com>,
"SMITH, JAMES A" <JSMITH@entergy.com>
Date:
4/23/04 8:20AM
Subject:
Status of 1 RI8 Alloy 600 Inspections Attached is the current status of the Alloy 600 inspections for 1 R18 as of 4/23/04 AM Steve Bennett t
NSA - Licensing-479-858-4626 Pager: 479-890-3323 v*J
,:\\W1IND0WS\\TEMP\\GW)00001.TMP Page 1.
:\\WINDOWS\\TEMP\\GW)0O0Q1.TMP Page 1 Mail Envelope Properties (408909E9.D6F: 20: 28015)
Subject:
Status of IR18 Alloy 600 Inspections Creation Date:
4/23/04 8:15AM From:
"BENNETT, STEVE A" <SBENNE2@entergy.com>
Created By:
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) nrc.gov ARL_PO.ARL_DO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A)
WSIMS (SIMS, WILLIAM D)
GPAYNE (PAYNE, GARY - WF3)
GPARKS (PARKS, GLENN A)
KPANTHE (PANTHER, KENNETH C)
TMITCH1 (MITCHELL, TIMOTHY G)
BMEANS (MEANS, BRACY E)
RLEWIS1 (LEWIS, RAYMOND S)
JKOWALE (KOWALEWSKI, JOSEPH A)
WJAMES 1 (JAMES, WILLIAM)
DJAMES (JAMES, DALE E)
JHOUGHT (HOUGHTALING, JOHN B)
RGORDON (GORDON, ROBERT A)
JGOBELL (GOBELL, JAMIE N)
FFORRES (FORREST, FREDDIE)
JFORBE1 (FORBES, JEFFREY)
CEUBANK (EUBANKS, CLIFFORD)
TEHREN (EHREN, TERRY G)
DEDGELL (EDGELL, DOUGLAS W)
WEATON (EATON, WILLIAM A) rdees90 (DEESE, RICHARD W)
GDAVANT (DAVANT, GUY H)
BDAIBER (DAIBER, BRYAN J)
LCOMPTO (COMPTON, LESLIE)
WCAMPB3 (CAMPBELL, BILL - NUCLEAR)
FBURFOR (BURFORD, FRANCIS G)
DBICE (BICE, DAVID B)
,-\\WINDOWS\\TEMAP\\GW)00001.TMP Page 2 j
:\\WINDOWS\\TEMP\\GW100O01
.TMP Page 21 RSWAINI (SWAIN, RONALD VANCE)
Post Office owf4_po.OWFNDO ARIPO.ARL_DO Files MESSAGE Part.001 IR18 RVH Inspection Results Mime.822 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Route nrc.gov nrc.gov entergy.com Size 153 905 4-23.doc 61739 Date & Time 04/23/04 08:15AM 41984 None Standard No None No Standard
April 23, 2004 - 7:00 AM 1 R1 8 Alloy 600 Status Inspection Inspection Method Extent of Inspection 1 R18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 Scheduled to begin dayshift on Friday (4/23/04).
Head Structure around each head penetration).
(OP 2311.009)
Awaiting shielding removal CRDM/
UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest Scheduled to begin UT exams dayshift Monday RADCAL (no known defects) point of the root of the J-weld to the blind zone.
(4126/04).
Nozzles UT of six FTI repaired UT the weld and at least 1 -inch above the weld in CRDM nozzles (Nozzles the nozzle base material.
3, 6,15, 17, 33, & 56)
UTMWS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) and wetted surface exam of weld overlay.
UT of RADCAL Nozzle UT of the RPV nozzle from 2" above the highest (Nozzle 1) point of the root of the J-weld to the blind zone.
UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli
[Leak Path Assessment]
above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each 52 of 52 BMls inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head.
(Complete)
(OP 2311.009)
No leaking nozzles CR-ANO-1-2004-0735 written on rust/staining RCS Visually Inspect RCS for Visually inspect above the RPV head for potential H202 flush complete. Small bore beginning day shift Walkdowns RCS leaks boric acid leaks from pressure-retaining Friday (4/23/04).
components as well as other A600 RCS small bore locations. (OP 2311.009)