Day Answer to First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors, Dated February 20, 2004
ML041610285
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/10/2004
From: Mauldin D
Arizona Public Service Co
To:
NRC/SECY/RAS
References
102-05087-CDM/SAB/RJR, EA-03-009
Download: ML041610285 (3)


Text

LAFS David Mauldin Vice President Nuclear Engineering and Support Palo Verde Nuclear Generating Station EA-03-009 10 CF 21 202((2)

TEL (623) 393-5553 P.O. Box 52034 FAX (623) 393-6077 Phoenix, AZ 85072-2034 102-05087-CDM/SAB/RJR March 10, 2004 Secretary Office of Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Docket Nos. STN 50-528, 50-529 and 50-530 License Nos. NPF-41, NPF-51 and NPF-74 20-Day Answer to First Revised NRC Order (EA-03-009)

Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water reactors, Dated February 20, 2004 In accordance with 10 C.F.R. § 2.202(a)(2) and §50.4, Arizona Public Service (APS)

Company, hereby submits its answer to the February 20, 2004, First Revised Order (EA-03-009) Modifying Licenses. APS does not request a hearing on the revised Order. APS consents to the Order modifying the licenses as delineated in Section IV of the Order.

No new commitments are being made to the NRC by this letter. However, due to changes in the inspection requirements and responses given to questions asked during the March 2, 2004, meeting on this revised NRC Order, APS is expecting to submit a request for relaxation in support of the Ul 2004 spring outage. If you have any questions concerning this matter, please contact Mr. Tom Weber at (623)-393-5764.

Sincerely, CDM/SAB/RJR/kg cc:

B. S. Mallet M. B. Fields N. L. Salgado

' 4 4'q

U. S. Nuclear Regulatory Commission Office of Secretary of the Commission 20-Day Answer to First Revised NRC Order (EA-03-009) Dated February 20, 2004 Page 3 Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Assistant General Counsel for Materials Litigation Facsimile Number 301-415-3725 Office of Secretary of the Commission Facsimile Number 301-415-1101 (w/attachments)

(w/attachments)

(w/attachments)

(w/attachments) 41

STATE OF ARIZONA

) ss.

COUNTY OF MARICOPA )

1, David Mauldin, represent that I am Vice President Nuclear Engineering and Support, Arizona Public Service Company (APS), that the foregoing document has been signed by me on behalf of APS with full authority to do so, and that to the best of my knowledge and belief, the statements made therein are true and correct.

I David Mauldin Sworn To Before Me This /D

- Day Of Y'nc2/ŽC/

, 2004.

Ag S

yE

/0 Ui Notary Commission Stamp