May 14, 2004
Southern Nuclear Operating Company, Inc.
ATTN:
Mr. H. L. Sumner, Jr.
Vice President
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT:
ERRATA LETTER FOR EDWIN I. HATCH NUCLEAR PLANT - RESPONSE TO
INSPECTION REPORT NOS. 05000321/2003006 AND 05000366/2003006
Dear Mr. Sumner:
We have determined that the subject letter contained an incorrect enforcement action (EA)
number. Please find enclosed a revised copy of the letter with this number corrected. We
apologize for any inconvenience this may have caused.
Sincerely,
/RA/
Charles A. Casto, Director
Division of Reactor Safety
Docket Nos.: 50-321, 50-366
Enclosure: As stated
cc w/encl:
J. B. Beasley, Jr.
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
(cc w/encl contd - See page 2)
2
(cc w/encl contd)
George R. Frederick
General Manager, Plant Hatch
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Raymond D. Baker
Manager Licensing - Hatch
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
Laurence Bergen
Oglethorpe Power Corporation
Electronic Mail Distribution
Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Chairman
Appling County Commissioners
County Courthouse
Baxley, GA 31513
Resident Manager
Oglethorpe Power Corporation
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
(cc w/encl contd - See page 3)
3
(cc w/encl contd)
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
Electronic Mail Distribution
Reece McAlister
Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
Distribution w/encl:
C. Gratton, NRR
C. Evans, RII EICS
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:EICS
RII:DRP
SIGNATURE
RA
NAME
OGLE
EVANS
BONSER
DATE
5/4/04
5/4/04
5/5/05
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
PUBLIC DOCUMENT
YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041550275.WPD
February 5, 2004
Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner, Jr.
Vice President - Hatch Nuclear Plant
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - RESPONSE TO INSPECTION REPORT
NOS. 05000321/2003006 AND 05000366/2003006
Dear Mr. Sumner:
In your letter dated October 1, 2003, in response to our Triennial Fire Protection Inspection
Report 05000321/2003006 and 05000366/2003006, you made several requests. One of those
requests was that the NRC withdraw Non-Cited Violation (NCV) 50-366/03-06-04, Unapproved
Manual Operator Actions for Post-Fire SSD. In our letter to you dated November 18, 2003, we
stated that we were still reviewing additional information that you had provided in response to
that NCV. We have now completed our review of your information related to that NCV and are
advising you of our decision. Details of our review are in the enclosure to this letter, titled
Evaluation of Licensee Information.
Based on our review of your additional information, we are withdrawing the examples of the
NCV related to a high pressure coolant injection (HPCI) pump runaway. Your information has
substantiated that the HPCI pump is not vulnerable to cable failures that could cause a runaway
condition due to fires in III.G.2 areas, where plant shutdown would be from the control room.
Your Safe Shutdown Analysis (SSA) and Fire Procedure differ from your additional information
with respect to HPCI vulnerability to a runaway condition due to fires; consequently, those
documents are not current with your latest information.
However, we have concluded that your information did not provide a valid basis for withdrawing
the example of the NCV related to the local manual operator action for repowering the battery
chargers. Also, as explained in the enclosure, you may need to perform additional reviews to
verify that this operator action can be performed (will not be affected by the fire) for fires in all
fire areas where the action may be needed.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publically Available Records (PARS) component of the NRCs document system (ADAMS).
SNOPCO
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4600.
Sincerely,
/RA: H. Christensen for:/
Charles A. Casto, Director
Division of Reactor Safety
Docket Nos.: 50-321, 50-366
Enclosure: Evaluation of Licensee Information
cc w/encl:
J. B. Beasley, Jr.
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
George R. Frederick
General Manager, Plant Hatch
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Raymond D. Baker
Manager Licensing - Hatch
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
Laurence Bergen
Oglethorpe Power Corporatioln
Electronic Mail Distribution
(cc w/encl contd- See page 3)
SNOPCO
(cc w/encl contd)
Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Chairman
Appling County Commissioners
County Courthouse
Baxley, GA 31513
Resident Manager
Oglethorpe Power Corporation
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
Electronic Mail Distribution
Reece McAlister
Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
SNOPCO
Distribution w/encl:
S. Bloom, NRR
C. Evans, RII EICS
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OEMAIL
OFFICE
RII:DRS
RII:EICS
SIGNATURE
RA
NAME
OGLE
EVANS
BONSER
DATE
05/04/04
05/04/04
5/12/2004
E-MAIL COPY?
YES
NO YES
NO
PUBLIC DOCUMENT
YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041550275.WPD