May 20, 2004 Joseph E. Venable Vice President Operations Waterford 3 Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION (EXAMINATION REPORT 05000382/2004-301)
In a telephone conversation on May 17, 2004, between Messrs. Art Vest, Instructor, Operations Training and Michael Murphy, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Steam Electric Station, Unit 3, during the week of November 15, 2004.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your support for onsite validation of the examinations is required during the week of October 25, 2004.
To meet the above schedule, it will be necessary for your staff to submit the examination outlines by August 14, 2004. The draft written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner will be due by September 21, 2004. Any delay in receiving the examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
Entergy Operations, Inc. and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Vest has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Murphy at 817-860-8152, or myself at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief Operations Branch Division of Reactor Safety Docket: 50-382 License: NPF-38 cc:
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Entergy Operations, Inc. Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502
Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (MCH)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (KEG)
ADAMS: Yes
No Initials: __MEM____
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive SOE:OB C:OB MEMurphy/lmb ATGody
/RA/
/RA/
5/20/2004 5/20/2004 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax