ML041490041

From kanterella
Jump to navigation Jump to search

Corrected Technical Specification Page 3.4.12-2, TAC Nos. MC1346 and MC1347
ML041490041
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/25/2003
From:
NRC/NRR/DLPM/LPD2
To:
Peters S, NRR/DLPM, 415-1842
Shared Package
ml041480458 List:
References
TAC MC1346, TAC MC1347
Download: ML041490041 (1)


Text

LTOP System 3.4.12 ACTIONS I. r%1T ILJ I t------------------------___________________-

LCO 3.0.4.b is not applicable when entering Mode 4.

I CONDITION REQUIRED ACTION COMPLETION TIME A.

More than two pumps A.1 Initiate action to verify a Immediately (charging, safety maximum of two pumps injection, or charging are capable of injecting and safety injection) into the RCS.

capable of injecting into the RCS.

B.

Reactor coolant pump B.1 Initiate action to limit pump Immediately operation not limited as operation as specified in specified in Table Table 3.4.12-1.

3.4.12-1.

C.

An accumulator not 0.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator.

accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in Specification 3.4.3.

(continued)

Catawba Units 1 and 2 3.4.1 2-2 Amendment Nos. 213, 207