the 8: 15 News for Monday, March 11, 2004ML041480360 |
Person / Time |
---|
Site: |
Monticello, Dresden, Davis Besse, Perry, Fermi, Byron, Braidwood, Duane Arnold, Clinton, Quad Cities, LaSalle |
---|
Issue date: |
02/23/2004 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
FOIA/PA-2004-0140 |
Download: ML041480360 (1) |
|
Similar Documents at Monticello, Dresden, Davis Besse, Perry, Fermi, Byron, Braidwood, Duane Arnold, Clinton, Quad Cities, LaSalle |
---|
Category:Newsletter
MONTHYEARML1211703952011-06-14014 June 2011 Office of Nuclear Reactor Regulations Forum, Portions Outside of Scope ML0606803872006-03-0909 March 2006 NRC Region III Tritium Inspection Activities ML0610107752005-12-29029 December 2005 News Release, Braidwood Station Tritium Project Progresses, Drinking Water Well Tests Show No Health or Safety Risk ML0427301612004-09-30030 September 2004 September 2004 Davis-Besse Nuclear Power Station NRC Update, Periodical ML0515201632004-05-24024 May 2004 8:15 News for Thursday, April 22, 2004 ML0515201662004-05-0707 May 2004 8:15 News for Friday, May 7, 2004 ML0515201702004-04-23023 April 2004 8:15 News for Friday, April 23, 2004 ML0515201612004-04-16016 April 2004 8:15 Newsletter for Friday 16, 2004 ML0515201592004-04-15015 April 2004 8:15 News for Thursday, April 15, 2004 ML0515201572004-04-14014 April 2004 8:15 News for Wednesday, April 14, 2004 ML0404906812004-02-29029 February 2004 February 2004 Davis-Besse Monthly Status Report ML0414803602004-02-23023 February 2004 the 8: 15 News for Monday, March 11, 2004 ML0414900952004-02-23023 February 2004 Panel Restart Deliberation Briefing ML0802902022004-02-0404 February 2004 Bulletin: Feedwater Tracer Test Planned with Safety as Top Priority ML0404906692004-01-31031 January 2004 January 2004 Davis-Besse Monthly Status Report ML0334212892003-12-0505 December 2003 Westinghouse - NSAL 03-12 - 12/05/03 Crossflow Ultrasonic Measurement System ML0333610682003-12-0303 December 2003 December 2003 Davis-Besse Monthly Status Report ML0332300522003-11-18018 November 2003 November 2003 Davis-Besse Monthly Status Report ML0327906762003-10-0707 October 2003 October 2003 Davis-Besse Monthly Status Report ML0405004682003-09-30030 September 2003 September 2003 Davis-Besse Reactor Vessel Head Damage, NRC Update, 13th Periodic Update ML0405004612003-07-31031 July 2003 July 2003 Davis-Besse Reactor Vessel Head Damage, NRC Update, 11th Periodic Update ML0312604962003-05-0101 May 2003 May 2003 Davis-Besse Reactor Vessel Head Damage, NRC Update, Ninth Periodic Update ML0310500972003-04-14014 April 2003 April 2003 Davis-Besse Reactor Vessel Head Damage, NRC Update ML0312604892003-03-31031 March 2003 March 2003 Davis-Besse Reactor Head Damage, NRC Update 2011-06-14
[Table view] |
Text
dasdaft Of d Nr Monda ,M2 r F Note: This newsletter may contain pre-decisional information. Do not distribute outside the NRC.
Reactor Events:
An event (50.72(b)(3)(iii)(B)-Unanalyzed Condition) at Davis Besse has been retracted.
The initial notification In January stated that certain plant doors may not be able to withstand pressure created by a main steam line break. The amount of pressure was overestimated, and it was determined that the affected doors (with one exception) would be able to withstand the revised estimated pressure. The equipment operability would not have been challenged In the room with the failed door.
Plant Status:
Branch 1 Dresden: U2: Full power and quiet.
L3: Full power and quiet. Moisture carryover has returned to Its normal value of 0.03%.
Perry: Full power. Yesterday, the "A" RPS bus de-energized during a surveillance test.
Fermi: Full power and quiet.
Quad Cities: Ul: 85% power and quiet.
U2: Full power and quiet. A downpower will start tonight for the outage.
Branch 2 Duane Arnold: Full power and quiet.
Monticello: ow d LaSalle: Ul: Full power and quiet.
- (.12 Full power and quiet.
Branch 3 Braldwood: Ul: Full power. Work continues on the RCFCs.
U2. Full power.
Byron: Ul: Full power. Work on the DC charger slightly Increases risk.
U2: Ditto.
Clinton: In day 21 of refueling outage, currently in Modetntry into Mode 2 Is expected tomorrow. The drywell close-out will occur toda7 Branch 4 Davis Besse: Mode 3 with NOP/NOT. An 0350 panel meeting Is occurring this morning, and a meeting to brief Mr. Collins, Mr. Dyer, and Mr. Caldwell will occur this afternoon.