uAPS A subfojdiarv of I'innac II~st Capital Caqvration Palo Verde Nuclear Generating Station Technical Specification 5.6.8 David M. Smith Plant Manager Nuclear Production Tel.
623-393-6116 Mail Station 7602 Fax.
623-393-6077 RO. Box 52034 e-mail: DSMITH10 apsc.com Phoenix, AZ 85072-2034 192-01 140-DMS/DGM/DFH May 12, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 Special Report 1-SR-2004-002 Attached please find Special Report 1-SR-2004-002 prepared and submitted pursuant to Technical Specifications (TS) Reporting Requirement 5.6.8. This report discusses steam generator tube plugging in Unit 1. Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 29, 2005. Copies of the Special Report are being forwarded to the Regional Administrator, NRC Region IV and the PVNGS Resident Inspector.
No commitments are being made to the NRC by this letter.
If you have any questions, please contact Daniel G. Marks at (623) 393-6492.
Sincerely, DMS/DGM/DFH Attachment cc:
(with attachment)
B. S. Mallett M. B. Fields N. L. Salgado NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for Palo Verde
-ADq -7
Attachment Special Report No. 1-SR-2004-002
Palo Verde Nuclear Generating Station Unit I Steam Generator Tube Plugging Docket No. STN 50-528 Special Report No. I-SR-2004-002 This Special Report is being provided pursuant to Palo Verde Unit 1 Technical Specifications (TS) Reporting Requirement 5.6.8 to report the number of steam generator tubes plugged and/or repaired as a result of inservice inspection activities.
On April 29, 2004, Unit I was defueled during a refueling outage when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 221 tubes in Steam Generator No. 1 and 341 tubes in Steam Generator No.
2.
Pursuant to Technical Specification 5.6.8, the complete results of the steam generator tube inservice inspection will be submitted by April 29, 2005.